HomeMy WebLinkAbout13695 Highway 9, Suite 106 18MLT-CBP00035 BUILDING DIVISION p, p
HOME OF' .aro^,n°DEE 11 oR „, Milton BUILDING PERMIT
MI LTON' 2006 Heritage Walk 0
Milton, GA 30004
678-242-2545 Fax 678-242-2550 Permit Number: 18MLT-CBP00035
For Inspections call 678-242-2566
Date Issued: 09/20/2018 Contractor/General: A&A Construction & GCQA005253
Job Site Address: 13695 Highway 9, Suite 106 Plumbing Plumbwise, Inc. MP209998
Electrical Contractor: OLD FASHIONED EN212637
Property Owner: Legacy Crossing LLC Mechanical ER Services, Inc. CN208732
Mailing Address: 5435 Hillgate Crossing Other Contractor: Fire&Life Safety LVU405420
Alpharetta, GA 30005
Phone: H: 000-000-0000
Parcel ID:
Subdivision: Lot: null Block: Filing: Sq. 0
Regwired Set Backs
North/ South/Back: East/Right: West/Left:
Actual Set Backs
North/ South/Back: East/Right: West/Left:
TYPE AND VALUE OF BUILDING FEE ITEMS #of Each Amount
Bldg Admin Fee 1.00 $25.00
Final CO Commerical 1.00 $50.00
Fire 80% Inspection Fee 1.00 $100.00
Fire 100% Inspection Fee 1.00 $100.00
Plan Review Fee (Bldg) 1.00 $916.88
Permit Fee 250000.00 $1833.75
Type: Alteration Fire Structural Plan Review 8676.00 $216.88
SubType: Commercial
Category: Commercial Alteration
Valuation: $250,000.00 Total $3242.51
Plans Reviewed by:
Description of Work: Interior finish for Mazzy's Sports Bar&Grill. Existing restroom, plumbing line, grease trap, hood to remain as is.
New kitchen equipment and bar area, partition walls.
NOTICE
The applicant, his agents and employees of, shall comply with all the rules, regulations and requirements of the City Zoning Regulations
and Building Codes governing all aspects of the above proposed work for which the permit is granted. The City or its agents are authorized
to order the immediate cessation of construction at anytime a violation of the codes or regulations appears to have occurred. Violation of
any of the codes or regulations applicable may result in the revocation of this permit. Buildings MUST conform with the submitted and
approved plans.Any changes of plans or layout must be approved prior to the changes being made.Any change in the use or occupancy
must be approved prior to commencement of construction. Construction not commenced within 180 days of permit issuance voids this
permit. Cessation of work for periods of 180 continuous days shall also void this permit. Permits are not transferable. SAFEbuilt, Inc. and
the City of Milton are not liable for workmanship.
Signature of Applicant/Date Building Department Signature/Date
MUST BE POSTED ON JOB SITE