HomeMy WebLinkAboutPacket - PC - 07-24-2007 City of Milton
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004
**Meeting Codes: CZIM-Community Zoning Information Meeting; DRB-Design Review Board;
PC-Planning Commission; MCC-Mayor and City Council
W:\Board of Commissions\Planning Commission\Master PC Agenda 7 24 07\PCAGENDA JULY.doc
1
PLANNING COMMISSION AGENDA
Tuesday, July 24, 2007, 7:00 pm
Agenda Item Description Meeting
Dates**
Staff
Recommendation
PC
Recommendation
I. Invocation
II. Call to Order
III. Pledge of
Allegiance
IV. Public Comment
V. Approval of
Minutes
Minutes from the June 26,
2007 Planning Commission
Meeting
Approval
VI. REZONINGS
Deferred
A. RZ07-005
VC07-002
855 Mayfield Road
To rezone from AG-1 to MIX
to develop a total of 15,000
sq.ft. of medical office; 3,500
sq.ft of commercial; and 9
residential units.
Request to reduce the 75-
foot buffer and 10-foot
improvement setback to a
15-foot landscape strip
adjacent to AG-1by Milton
Medical Holdings, LLC c/o
Jay Davis.*
(*Based on a revised site
plan submitted on 7/12/07)
CZIM-5/23/07
DRB-6/3/07
PC-6/26/07
DRB-7/10/07
MCC-8/16/07
Denial
Denial
Deferral 30 Days
Deferral 30 Days
VII. REZONINGS
New
A. RZ07-008
15260 Hopewell Road
To rezone from AG-1 to C-1
the existing 1,179 square foot
structure by Mark King.
(Staff notes that MIX was the
inappropriate district to
request and the request has
been amended to C-1. Also
a concurrent variance is
needed and therefore Staff
is recommending Deferral to
allow proper advertising.)
CZIM 6/27/07
DRB 7/10/07
Deferral
B. RZ07-009
UP07-002
VC07-006
3455 Morris Road
To rezone from AG-1 to A
(Staff notes that the site is
currently zoned A pursuant
to Z06-124 and therefore the
rezoning petition RZ07-009
CZIM 6/27/07
DRB 7/10/07
MCC 8/16/07
Withdrawal
Approval Conditional
Denial
City of Milton
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004
**Meeting Codes: CZIM-Community Zoning Information Meeting; DRB-Design Review Board;
PC-Planning Commission; MCC-Mayor and City Council
W:\Board of Commissions\Planning Commission\Master PC Agenda 7 24 07\PCAGENDA JULY.doc
2
Agenda Item Description Meeting
Dates**
Staff
Recommendation
PC
Recommendation
portion of the request is not
needed.) to develop a 9,500
square foot Montessori
School and a concurrent
variance to decrease the
20-foot landscape strip to 10
feet along Webb Road
C. UP07-001
VC07-004
15386 Birmingham Hwy (SR
372) To request a Use Permit
for a landscaping business
(Article 19.4.27) to use an
existing 1,200 sq. ft. home
and a 500 sq. ft. barn and
develop a 3,750 sq. ft. barn.
The applicant is also
requesting a 2 part
concurrent variance to; Part
1: Reduce the 50-foot buffer
and 10-foot improvement
setback to a 25 foot buffer
and 10-foot improvement
setback along the east and
west property lines (Article
12H.3.5.C.1.) Part 2: To
reduce the 50-foot setback
adjacent to AG-1
(Agricultural) to 30-feet
along the east property line
(Article 19.4.27.B.3.)
CZIM 6/27/07
DRB 7/10/07
MCC 8/16/07
Approval Conditional
Approval Conditional
VIII. ADJOURN
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 1 of 30
RZ07-005 VC07-002
PETITION NUMBER:
RZ07-005
VC07-002
PROJECT NAME
Dinsmore Farm
PROPERTY INFORMATION
ADDRESS 855 Mayfield Road
DISTRICT, LAND LOT 2/2 1134
OVERLAY DISTRICT Crabapple Crossroads
EXISTING ZONING AG-1 (Agricultural)
PROPOSED ZONING MIX (Mixed Use)
ACRES 4.09
EXISTING USE 2 Houses, 1 Barn and 1 Small Garage
PROPOSED USE 15,000 square feet of medical office within 4 new buildings; 3,500
square feet of retail commercial within 1 new building and
4 duplex residences and 1 single family residence.*
OWNER Dinsmore Estate, et.al. c/o Imogene Dinsmore
PETITIONER/REPRESENTATIVE Milton Medical Holdings, LLC, Jay Davis / Pete Hendricks
ADDRESS P.O. Box 1270, Villa Rica, Georgia 30180
PHONE 678-859-8691
INTENT
To develop 15,000 square feet of medical office within 4 buildings at an overall
density of 3,667.48 square feet per acre; 3,500 square feet of retail commercial
within 1 building at an overall density of 855.75 square feet per acre and 4 duplex
residences and 1 single family residence at an overall density of 2.2 units per acre.
The applicant is also requesting a concurrent variance to reduce the 75-foot
buffer and 10-foot improvement setback to a 15-foot landscape strip along
property lines adjacent to AG-1 (Agricultural). *
COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION
RZ07-005 – DENIAL
VC07-002 - DENIAL
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 2 of 30
RZ07-005 VC07-002
LOCATION MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 3 of 30
RZ07-005 VC07-002
CURRENT ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 4 of 30
RZ07-005 VC07-002
Crabapple Crossroads Land Use Plan Map
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 5 of 30
RZ07-005 VC07-002
SITE PLAN – May 3, 2007
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 6 of 30
RZ07-005 VC07-002
Revised Site Plan 7/12/07
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 7 of 30
RZ07-005 VC07-002
Subject Site - Dinsmore Farm House
(View looking south from Mayfield)
Subject Site
(Looking toward Charlotte Drive)
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 8 of 30
RZ07-005 VC07-002
SUBJECT SITE
(Existing house to be demolished)
SUBJECT SITE:
The subject 4.09 acre site is zoned AG-1 (Agricultural) with an existing one story
residence, two-story farm house, barn, and garage. This site is east of the Crabapple
Crossroads intersection. The site is located within the Live/Work Land Use designation
on the Focus Fulton 2025 Comprehensive Future Land Use Map. Within that
designation the subject site is located within Village Mixed Use (1.74 acres) and Sub
Village Residential A (2.35 acres) land use sub areas.
Standards of Review
(Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate
and make a recommendation with respect to factors A. through G., below, as well as
any other factors it may find relevant.
A. Whether or not the proposal will permit a use that is suitable in view of the use
and development of adjacent and nearby Property?
Based on the Revised Site Plan submitted on July 12, 2007, the proposed Mixed
Use zoning is partially consistent with the Crabapple Crossroads Overlay District
Land Use Plan which recommends that this site be developed with Village Mixed
Use and Sub Residential A. However, the stated density for office, 8,620.69
square feet per acre based on 1.74 acres, is inconsistent with recent policies set
by the Fulton County Board of Commissioners for office within the Village Mixed
Use classification which range from 2,658 square feet per acre pursuant to 05Z-
117 northeast of the site to 3,802.56 square feet per acre pursuant to 06Z-047
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 9 of 30
RZ07-005 VC07-002
directly across the street to the north on Mayfield Road. The proposed
residential density of 3.83 units per acre is below the recommended residential
density of 4 units per acre.
B. Whether or not the proposal will adversely affect the existing use or usability of
adjacent or nearby property?
In Staff’s opinion, the proposed development is more intense than
recommended but will likely not have an adverse effect on the use or usability
of adjacent and nearby properties if developed with the recommended
conditions. The property to the east of the subject site is recommended for
Village Office/Residential. Office has been approved pursuant to 06Z-074 on
the north side of Mayfield Road.
C. Whether the property to be affected by the proposal has a reasonable
economic use as currently zoned?
The subject site appears to have a reasonable use as currently zoned with the
existing farm house and associated buildings within the AG-1 (Agricultural)
district.
D. Whether the proposal will result in a use which will or could cause an excessive
or burdensome use of existing streets, transportation facilities, utilities or schools?
Staff does not anticipate a significant impact on public services and facilities.
However, some impact to the surrounding transportation system is expected.
Mitigation of adverse impacts is addressed by recommended conditions.
E. Whether the proposal is in conformity with the policies and intent of the land use
plan?
The proposed mixed use development is inconsistent with some of the policies
and intent of the Crabapple Crossroads Community Plan and the Focus Fulton
2025 Land Use Plan. A brief description of the project is noted below:
Proposed use/density:
Village Mixed Use (1.74 acres along Mayfield Road)
The revised site plan submitted July 12, 2007 proposes 15,000 square feet of
medical office within 4 newly constructed buildings (Buildings #1-#4) at a density
of 8,620.69 square feet per acre based on 1.74 acres. The density for office is
more than recent Board Policy and is below the recommended density for
office per the Crabapple Crossroads Plan of 10,000 square feet per acre. The
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 10 of 30
RZ07-005 VC07-002
site plan indicates that Building 1 is partially located within the Sub Village A Sub
Area. Although it is inconsistent with the Plan, it appears that by moving this
building further south; the large 52” White Oak near the northeast corner can be
preserved.
The applicant is proposing 3,500 square feet of retail commercial in Building #5
at a density of 2,011.5 square feet per acre. This is consistent with previous Board
Policy for approved retail commercial uses in the area. Staff notes that the
applicant originally proposed preserving the Dinsmore Farm House which is listed
on the 1996 Fulton County Historic Resources Survey. Based on the revised site
plan, the Dinsmore Farm House will be removed because of extensive
deterioration and the presence of lead and asbestos in the building. The
applicant has stated that he is willing to replicate the home with one of the
newly constructed buildings. A previous site plan submitted on July 10, 2007 was
presented to the City of Milton Design Review Board on July 10, 2007. The DRB
was not opposed to the demolition of the house and supported the idea of it
being replicated on the site.
Staff notes the request for office and retail commercial is inconsistent with the
policy and intent of the Plan and past Board policy of upholding the maximum
100,000 square feet for each office and retail commercial for the Crabapple
Crossroads Overlay District.
Sub Village Residential A- (2.35 acres)
The revised site plan proposes 4 duplexes and 1 single family residence for a
total of (9) single family residences at a density of 3.83 units per acre based on
the 2.35 acres within the Sub Village Residential A sub area. This is below the
recommended density of 4 units per acre for Sub Village Residential A.
Permitted residential uses include duplex, single family alley access, single family
small lot and single family standard lot A. According to the revised site plan,
indicating 4 duplex residential units and 1 single family alley access lot, it is
consistent with the Crabapple Crossroads Plan.
The Milton City Council adopted the Focus Fulton 2025 Comprehensive Plan as
the City’s Comprehensive Plan on December 21, 2006. The proposed
development is partially consistent with the following Plan Policies for the
Crabapple Crossroads Community Plan which was included in the Focus Fulton
2025 Comprehensive Plan:
• Increase transportation choices and improve mobility for all users.
• Provide opportunities for mixed-use developments that are compatible
with a village-oriented development.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 11 of 30
RZ07-005 VC07-002
• Provide for the transition of land uses from higher to lower intensity land
uses in a pattern that supports village type development.
• Provide a variety of housing choices in the Crabapple Crossroads area.
F. Whether there are other existing or changed conditions affecting the use and
development of the property which gives supporting grounds for either approval
or disapproval of the proposal?
Staff notes that within the Crabapple Crossroads Community Plan, “Node
Designation” was discussed in detail. This plan was approved by the Fulton
County Board of Commissioners on June 4, 2003 pursuant to 2003Z-016. Previous
approved Plans defined a “Neighborhood Node” as a node that:
“Consist of up to 100,000 square feet of retail and service uses and office uses
not to exceed 20,000 square feet per acre with a maximum of 100,000 square
feet in total office uses. Minor arterials and collectors are appropriate for
neighborhood commercial. Residential development in the neighborhood node
should not exceed five units per acre.”
Historically, the Fulton County Board of Commissioners have considered the
“Neighborhood Node” (100,000 square foot cap for retail/commercial and
100,000 square foot cap for office) for Crabapple Crossroads when reviewing
and deciding on zoning cases before them.
Staff has compiled a chart showing the approved zonings and their approved
densities which is included at the end of this report. At this point in time, the
allotted total square footage of 100,000 square feet for both Commercial/Retail
and Office has been filled and any additional approval of Commercial/Retail or
Office would be inconsistent with the Crabapple Crossroads Community Plan
and policy for the Crabapple Crossroads.
G. Whether the zoning proposal will permit a use which can be considered
environmentally adverse to the natural resources, environment and citizens of
the City of Milton?
Based on the revised site plan submitted, the applicant shows the following
specimen trees to be preserved:
• 52” White Oak, 50” White Oak, 36” Red Oak, 27” Red Oak.
In addition, the applicant will utilize a pervious pavement system to help reduce
water runoff.
H. Existing uses and zoning of nearby property (See Map following table)
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 12 of 30
RZ07-005 VC07-002
Location Parcel#
On
Map
Zoning Petition/
Name/Acreage
Approved
Square Feet/
Units
Based on Sub
Area
Approved
Density by
Land Use
Sub Area
(++Exceeds
Plan
Density)
Approved
Overall
Density
East AG-1 (Agricultural) Scattered Single Family N/A
N/A
Further East R-15 (Residential)
Saint Michelle S/D
City of Alpharetta
Single Family Residential
Subdivision
N/A N/A
North/
Northeast
13 06Z-074/Bruce Harris
5.27 acres
20,800 sq.ft. Vil Mix
(2,600 sq.ft. Already
counted via 05Z-30
2 Units Vil Off/Res
4 Units Sub Vil A
0.75 u/a
3.37 u/a
3,946.87 sq.ft/acre
North AG-1 (Agricultural)
Scattered Single
Family Residences
Further
North
24 99Z-195
C-1
Strawberry Fields Art
Gallery
None Stated
Northwest 15 06Z-074
C-1
Patton / 1.61 acres
12,000 sf Vil Mix
(previously approved
03Z-115
8,203 sf Vil Mix
7,453.42 sq.ft./acre
5,095.04
West
26 99Z-027
C-1
Existing Buildings with
3,000 sq.ft. addition
Further
Northwest
23 Z86-283
Bryan & Contereas
C-1
493.83 sq ft/acre
Further
Northwest
22 M-1
(Manufacturing)
Heart of Crabapple
Unconditional
Further
Northwest
12 05Z-117/MIX
John Wieland
62.87 acres
Under Develop-
Ment
2,532 sf Comm in Vil Mix
36,468 sf Office
In Vil Mix
14 units Vil Mix
18 units Vil Of/Res
17 units Sub Vil B
50 units Res 0-1
1.61 u/a
7.01 u/a++
6.35 u/a++
1.09 u/a ++
40.28 f/acre
580.06 sf/acre
Further
Northwest
25 C-1
Gas Station
Unconditional
Further
West
9 05Z-070/MIX
Crabapple
Crossroads
11.98 acres
Under Develop-
Ment
20,000 sf Comm. In Vil
Mix
20,000 sf Office
In Vil Mix
39 units Vil Mix
5 units Vil Off
3 units Sub Vil B
2 units Rural Res
5 u/a
5 u/a
1.62 u/a
2.55 u/a (extra
Unit approved
for historic
house saved)
1,669.45 Sf/acre
1,669.45 sf/acre
Further
West
21 C-1, AG-1
City of Alpharetta
Government
Center
Further
Southwest
14
06Z-74/C-1
Crabapple
12,000 sf Comm in Vil
Mix (Previously
7,453.42 sf/acre
5,095.04 sf/acre
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 13 of 30
RZ07-005 VC07-002
Crossing Approved 03Z-115)
8,203 sf Office Vil Mix
Further
Southwest
1
03Z-115/MIX
Crabapple
Crossing
(Under
Development)
12,000 sf Comm in Vil
Mix
31 units Vil Of/Res
16 units Sub Vil B
4.9 u/a
347.87 sf/acre
2.5 u/a
Further
Southwest
4 04Z-134
C-1
1,500 sq. ft. Vil Mix 1,153.85 sq.ft./
acre
1,153.85 sq.ft. /
acre 5 04Z-136
C-1
Interior Decoration
2,500 sq.ft. Vil Mix Further
Southwest
4,901.06
sq.ft./acre
4,901.06 sq.ft./acre
West 11 05Z-110
Larry Davenport
MIX
2.10 acres
8,000 sq.ft. Vil Mix 6,300 sq.ft. Vil Off
10 05Z-072
Sally Rich Kolb
1.36 acres
12,800 sq.ft. Vil Mix (1.36
acres)
9,500 sq.ft.
counted
6,985.29
sq.ft/acre
12,800 sf-1,800
existing-
Southwest 9,411.76 sq.ft./acre
1,450 sf bonus
for saving
historic house
3 South 03Z-146
Crabapple Tea
Room
800 sq. ft. Mix Use 536.92
sq.ft/acre
536.92 sq.ft./acre
EXISTING USES AND ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 14 of 30
RZ07-005 VC07-002
I. Suitability of the subject property under the existing zoning district for the
proposed use?
The proposed use cannot be developed under the AG-1 (Agricultural) district.
The applicant is requesting a higher density of residential as well as office and
commercial uses that are not permitted under AG-1.
J. Suitability of the subject property under the proposed zoning district for the
proposed use?
The proposed use is suitable for the proposed zoning district of MIX (Mixed
Use).This zoning district allows for a mix of uses as proposed for various types of
residential, office and commercial/retail development.
K. The possible creation of an isolated zoning district unrelated to adjacent and
nearby districts.
The proposed rezoning to MIX (Mixed Use) would not create an isolated district.
There is MIX (Mixed Use) to the north of the development and
Commercial/Retail further to the west and southwest.
L. Possible effects of the change of the zoning or change in use on the character of
a zoning district or overlay district?
Staff is of the opinion that the change of the zoning district and the change in
use may have an adverse effect on the character of the existing zoning district
or existing overlay district as currently proposed. Allowing the development to
have more square footage than existing Board Policy creates more intensity of
development which thwarts the objective of the overall Crabapple Crossroads
Plan. Positive results would occur if it is developed with the alternate conditions
that allow only residential development at the recommended densities of the
Crabapple Crossroads Plan. Development consistent with the plan would
solidify the character of the area.
M. Whether the proposed zoning will be a deterrent to the value or improvement of
development of adjacent property in accordance with existing regulations?
Staff is of the opinion that the change in the zoning may not be a deterrent to
the value of adjacent properties developed or anticipated to be developed
under existing regulations
N. The possible impact on the environment, including but not limited to, drainage,
soil erosion and sedimentation, flooding, air quality and water quality?
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 15 of 30
RZ07-005 VC07-002
This property, if developed under the proposed zoning district, must conform to
the current Chapter 14 of the Milton City Code regarding Land Development
including Soil and Erosion Control and Flood Damage Prevention. The applicant
has not indicated the percentage of open space for this petition. Based on the
site plan submitted the proposal appears to meet the 10 percent open space as
required by the Crabapple Crossroads Community Plan.
O. The relation that the proposed zoning bears on the purpose of the overall Land
Use Plan with due consideration given to whether or not the proposed change
will carry out the purposes of this Land Use Plan.
The proposed rezoning as submitted is consistent with the overall Crabapple
Crossroads Land Use Plan for the area except the portion of the office use within
the Sub Village Residential A which does not fulfill the purpose of the Crabapple
Crossroads Land Use Plan.
P. The consideration of the preservation of the integrity of residential
neighborhoods shall be considered to carry great weight. In those instances in
which property fronts on a major thoroughfare and also adjoins an established
residential neighborhood, the factor of preservation of the residential area shall
be considered to carry great weight.
The proposed zoning indicates the non-residential uses toward Mayfield and
utilizes the residential component as a transition for residential to the south. This
is consistent with the transition to residential uses going south and non-residential
to the west and the east as shown on the Crabapple Crossroads Plan Map.
Q. The amount of undeveloped or zoned land in the general area affected which
has the same zoning or future land use classification as the proposed rezoning.
The existing approved zonings and land use classifications surrounding the
subject site are similar to the proposed rezoning.
SITE PLAN ANALYSIS
Based on the applicant’s revised site plan submitted to the Community Development
Department on July 12, 2007, Staff offers the following considerations:
Crabapple Crossroads Overlay District
BUILDING SETBACKS
Article 12H(1)4 Section B.1.c of the Crabapple Crossroads Overlay District requires a
maximum building setback along Mayfield Road between 0 to 10 feet maximum and
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 16 of 30
RZ07-005 VC07-002
requires between 10 to 20 feet maximum along Charlotte Drive. The applicant’s site
plan shows compliance with the requirement.
BUILDING HEIGHT
Article 12H.3.5.D.1. of the Northwest Fulton Overlay District requires a maximum height
limit of two stories with the maximum height 30 feet from average-finished grade to the
bottom of the roof eave. The applicant’s letter of intent does not address the height
of the newly constructed buildings.
LANDSCAPE STRIPS AND BUFFERS
Article 12H.(1).4.B.1.a. requires an 8-foot minimum landscape strip along Mayfield
Road and a 7-foot minimum landscape strip along Charlotte Drive. The site plan
appears to be compliant with these requirements.
Article 12H.3.1.C.2 of the Northwest Fulton Overlay District requires a 75-foot
undisturbed buffer and 10-foot improvement setback along the south property line
adjacent to AG-1, and the western property lines adjacent to AG-1. The applicant is
requesting relief from the requirement as follows:
Reduce the 75-foot undisturbed buffer and 10-foot improvement setback adjacent to
AG-1 (Agricultural) zoned property to a 15-foot landscape strip.
The proposed office and retail is inconsistent with the Crabapple Overlay District Plan
and recent Board policy of limiting office and retail to 100,000 square foot cap for
office and retail. Therefore, Staff recommends DENIAL of the concurrent variance.
PARKING REQUIREMENTS
The following chart illustrates the parking required by Article 18 of the City of Milton
Zoning Ordinance for the proposed uses:
Proposed Use Minimum Requirement Spaces Provided
Medical Office
(15,000 sq.ft.)
Retail Commercial
(3,500 sq.ft.)
Total
4 spaces per 1,000 sq. ft. of
building area (60 spaces)
5 spaces per 1,000 sq. ft. of
Building area (18 spaces)
78 spaces required
76 spaces provided
The site plan shows a total of 76 spaces on the site. Per the Zoning Ordinance, 78
spaces are required which is 2 more than provided. The applicant may request an
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 17 of 30
RZ07-005 VC07-002
administrative variance for a 10 percent reduction in parking which would bring the
development in compliance. Staff notes that the plan does not indicate a 10-foot
parking island for every 6th parking space. In addition it does not indicate the required
10 foot landscape island at the end of each parking bay. It appears there will be
adequate space as well as providing areas for existing trees to have the needed
pervious area for their root systems.
MINIMUMM LOT SIZE
The applicant has proposed a total of 9 residential units as follows:
Sub Area Number and Type Minimum Lot Size
Sub Village Residential A 8 duplexes within 4
buildings
N/A
Sub Village Residential A 1 single family alley
access residential
Up to 4,800 square feet
The applicant’s request is consistent with Article 12H(1).6.B.1. The site plan is consistent
with the recommended housing types for Sub Village A.
MINIMUM HEATED FLOOR AREA
The applicant is requesting the following minimum heated floor areas:
• Duplexes – 1,800 square feet
• Single Family Residential – 3,000 square feet
The applicant’s request is consistent with recent approvals in the area.
DEVELOPMENT STANDARDS
The applicant is requesting the development standards as follows:
Buildings A-H: Duplexes
Building I: Single family alley access
The applicant has not indicated any specific setbacks for the two types of residential
development. The duplexes and single family alley access unit must conform to the
following Crabapple Crossroads Overlay District for Required Building Setbacks and
Frontage:
Lot Size: Up to 4,800 square feet
Minimum Lot Frontage: 20 feet
Maximum Front Yard Setback: 10 feet
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 18 of 30
RZ07-005 VC07-002
Minimum Side Yard Setback: 5 feet
Minimum Rear Yard Setback: 5 feet
Medical Office Buildings and Commercial Retail – Village Mixed Use
Per the revised site plan submitted July 12, 2007:
Building #1 Medical Office: 5,000 square feet
Building #2 Medical Office: 3,000 square feet
Building #3 Medical Office: 3,000 square feet
Building #4 Medical Office: 4,000 square feet
Building #5 Retail Commercial 3,500 square feet
The site plan indicates four (4) medical office buildings that are a maximum of 5,000
square feet in size. As noted previously, the applicant will not be keeping the Dinsmore
House but is willing to replicate it on the site. If approved, the conditions will reflect the
4 buildings with a total of 15,000 square feet and 1 building with 3,500 square feet for
retail commercial. The Crabapple Crossroads Overlay District does not address size of
buildings, but in the Crabapple Crossroads Plan states that building size and setback
should conform to the Northwest Fulton Overlay District standards. Non-institutional
buildings shall be no larger than 25,000 square feet and buildings within 400 feet of an
intersection shall have a 20-foot separation from one another. It appears that the
proposed site plan conforms to these standards.
OTHER CONSIDERATIONS
The revised site plan shows a new road along the south property that allows for future
inter-connectivity with Mid Broadwell Road. Staff notes that the proposed road is only
25 feet and the minimum right of way width required to develop this road is 50 feet.
The environmental Site Analysis Report (ESA) is sufficient and satisfies the requirement
of the City of Milton Zoning Ordinance.
The site plan appears to exceed the 10 percent minimum open space required by the
Crabapple Crossroads Overlay District, Article 12H(1)4.H. Staff notes that this common
area will not be part of any of the residential lots within the development. A
Homeowners Association is required to maintain the open space and it shall be
accessible by sidewalks, streets, or a trail system. Staff has included the condition for
open space and the establishment of a homeowners association in the
Recommended Conditions.
The subject site is in the Crabapple Crossroads Overlay District of the Northwest Fulton
Overlay District. At the time of application for a land disturbance permit and/or
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 19 of 30
RZ07-005 VC07-002
building permit the applicant will be required to comply with these standards. Prior to
the approval of a permit, the applicant shall be required to meet with the City of
Milton Design Review Board to receive their recommendations.
PUBLIC INVOLVEMENT
On May 23, 2007 the applicant was present at the Community Zoning Information
Meeting held at the Milton City Hall. There were three people in attendance that
represented the applicant, the seller and the agent for the seller. There was no one
from the community at the meeting.
Staff has received two e-mails in opposition to the proposed development which is
attached. The applicant is planning to meet with members of the community the
week of July 16 to address any concerns or questions they may have.
City of Milton Design Review Board Meeting – June 5, 2007
The following recommendations were made by the DRB:
• Situate town homes closer together to eliminate encroachment of decks into
the buffer.
• Eliminate/reduce individual driveways.
• Make access to town homes one way.
• Use pervious materials for the extra spaces.
• Exterior sidewalks should meander along frontage, following terrain.
• Provide some kind of decorative feature at corner to draw people to the site.
• Move corner building closer to the street – no more than 20 feet from the corner.
City of Milton Design Review Board Meeting – July 12, 2007
The applicant submitted the July 10, 2007 revised site plan for review by the DRB. They
also were not opposed to the elimination of the Dinsmore Farm House and for it to be
replicated on the site.
The DRB was also concerned about the size of the larger non-residential buildings. They
recommended that they reflect the surrounding existing buildings in size in scale.
Based on this input, the applicant submitted a revised site plan on July 12, 2007.
Public Notice Requirements
The rezoning petition was advertised in the Atlanta Journal Constitution on June 11,
2007 and the sign was installed before June 6, 2007 along the frontages of Mayfield
Road and Charlotte Drive. The notice of rezoning was sent on June 11, 2007.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 20 of 30
RZ07-005 VC07-002
Since the deferral of the petition on June 26, 2007, the sign on Mayfield Road and
Charlotte Drive was revised to reflect the new hearing dates. The notice of rezoning
was sent with the revised hearing dates on July 9, 2007.
Public Participation Plan and Report
The applicant has met the requirements of the Public Participation Plan requirements.
The applicant will be required to submit the public participation report 7 days prior to
the Mayor and City Council meeting.
CONCLUSION
The proposed office, commercial retail and residential development is inconsistent
with the policies and intent of the Crabapple Crossroads Plan and the Fulton County
Board of Commissioners policy; therefore, Staff recommends that this request to MIX
(Mixed Use) and the Concurrent Variance be DENIED. A set of Alternate Conditions
are included to allow the site to be rezoned to NUP (Neighborhood Unit Plan)
developed with 8 units of residential at a density of 4.6 units per acre within the Village
Mixed Use and 9 units of residential at a density of 3.83 units per acre within the Sub
Village A Residential or an overall density of 4.16 units per acre. A set of
Recommended Conditions are included if the Mayor and City Council chooses to
approve the proposed development as submitted.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 21 of 30
RZ07-005 VC07-002
ALTERNATE CONDITIONS
If this petition is approved by the Mayor and City Council, it should be APPROVED NUP
(Neighborhood Unit Plan) CONDITIONAL subject to the owner’s agreement to the
following enumerated conditions. Where these conditions conflict with the stipulations
and offerings contained in the Letter of Intent, these conditions shall supersede unless
specifically stipulated by the Mayor and City Council.
1. To the owners agreement to restrict the use of the subject property as follows:
a. No more than 8 units of dwelling units at a maximum of 1.87 units per acre
based on the total acreage zoned, whichever is less (4.6 units per acre
based on 1.7 acres of Village Mixed Use).
b. No more than 9 total dwelling units at a maximum density of 2.2 units per
acre based on the total acreage zoned, whichever is less (3.83 units per
acre based on 2.35 acres Sub Village A Residential).
c. Approved lot/unit totals are not guaranteed. The developer is responsible
through site engineering (at the time of application for a Land
Disturbance Permit) to demonstrate that all lots/units within the approved
development meet or exceed all the development standards of the City
of Milton. The total lot/unit yield of the subject site shall be determined by
this final engineering.
d. Provide a minimum heated floor area of 1,500 square feet for the dwelling
units.
2. To the owner’s agreement to abide by the following:
a. To the revised site plan received by the Community Development
Department on July 12, 2007. Said site plan is conceptual only and must
meet or exceed the requirements of the Zoning Ordinance, all other
applicable city ordinances and these conditions prior to the approval of a
Land Disturbance Permit. In the even the Recommended Conditions of
Zoning cause the approved site plan to be substantially different, the
applicant shall be required to complete the concept review procedure
prior to application for a Land Disturbance Permit. Unless otherwise noted
herein, compliance with all conditions shall be in place prior to the
issuance of the first Certificate of Occupancy.
b. All recreational and common areas which may be held in common shall
be accessible by streets, sidewalks, or trails and the common areas in
accordance with the design standards of the draft Milton Trail Plan and
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 22 of 30
RZ07-005 VC07-002
the newly established Right of Way Ordinance. Such shall be maintained
by an easement where necessary to the mandatory homeowners
association, who’s proposed documents of incorporation shall be
submitted to the Director of the Department of Community Development
for review and approval prior to the recording of the first final plat.
3. To the owner’s agreement to abide by the following requirements, dedication
and improvements:
a. Reserve sufficient land along the following roadways, prior to the approval
of a Land Disturbance Permit, as necessary to comply with the Crabapple
Crossroads Plan and the Transportation Master Plan consistent with
adjacent developments, pursuant to the Right of Way Ordinance.
i. Inter-parcel access points as required by Community Development
Director.
b. Dedicate at no cost to the City of Milton prior to the approval of a Land
Disturbance Permit or Certificate of Occupancy (whichever comes first),
sufficient land as necessary to provide the following rights-of-way, and
dedicate at no cost to the City of Milton such additional right-of-way as
may be required to:
i. Provide at least 10.5 feet of right-of-way from the back of curb of all
abutting road improvements, along the entire property frontage, as
well as allow the necessary construction easements while the rights-
of-way are being improved.
ii. Provide 50 feet right-of-way for connector road, location to be
approved by the Transportation Engineer. This may occur prior to
an LDP of a future phase if a master plan with a phasing plan is a
part of the first LDP plan submitted.
iii. Provide adequate right-of-way dedication for addition of the
following or as approved by the Transportation Engineer:
a. Northbound left turn lane on Charlotte Dr
b. Northbound right turn lane on Charlotte Dr
c. Westbound Left Turn Lane on Mayfield
d. Widening taper eastbound on Mayfield to accommodate
lane configuration.
c. Inter parcel access shall be required on the west property line. Additional
Inter-parcel walking trails are required to be installed, trail easements
recorded, and the HOA documents shall include a section of Adopt A
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 23 of 30
RZ07-005 VC07-002
Trail creation. Sidewalk is required along the new road. These items are
required as this site is located with the radii of the Safe Routes to School
limits. Access points and trail locations shall be as approved by the
Transportation Engineer.
d. Installation of a new decorative mast arm traffic signal at the corner of
Charlotte Drive and Mayfield Road prior to a C.O. as approved by the
Transportation Engineer.
e. Village Residential area shall have a private named alley. The site plan
must provide adequate fire truck access in alleys and one-way
conditions; as per the newly established Right-of-Way Ordinance as
acceptable to the Transportation Engineer and Fire Marshal. This is
required to be shown using either AutoTurn type software or mechanical
methods for rear wheel tracking on LDP drawings.
f. LDP plans shall meet the newly established Right of Way Ordinance as
required by the Transportation Engineer.
4. a. The developer’s Professional Engineer shall demonstrate to the City by
engineering analysis submitted with the LDP application, that the
discharge rate and velocity of the storm water runoff resulting from the
development is restricted to seventy-five percent (75%) of the pre-
development conditions. The designed (assumed) underground facility
may not be located on individual lots but may be located on common
space, including if necessary locations underneath private alleys which
may never be dedicated to the City as public.
b. Stormwater detention facility shall utilize vegetative measures for water
quality.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 24 of 30
RZ07-005 VC07-002
RECOMMENDED CONDITIONS
If this petition is approved by the Mayor and City Council, it should be APPROVED MIX
(Mixed Use) CONDITIONAL subject to the owner’s agreement to the following
enumerated conditions. Where these conditions conflict with the stipulations and
offerings contained in the Letter of Intent, these conditions shall supersede unless
specifically stipulated by the Mayor and City Council.
1. To the owners agreement to restrict the use of the subject property as follows:
a. Retail, service commercial and accessory uses, including all exterior food
and beverage areas, at a maximum density of 855.75 gross square feet
per acre zoned or a total of 3,500 square feet, which ever is less,(2,011.5
gross square feet per acre based on 1.74 acres of Village Mixed Use) but
excluding daycare, convenience stores with gas pumps; freestanding fast
food restaurants; businesses with drive through service; commercial
amusements; pawn shops; check cashing businesses; billiards or pool halls;
designated recycling collection stations; used car lots; self service laundry
facilities; arcades, amusements, galleries or game rooms; outside vending
machines, kiosks or other stands except ATM machines; dry cleaning plant
or dry cleaning establishments; sale, lease or rental of motorized vehicles
or trailers; tattoo or body piercing parlors; adult theme bookstores, video
stores, movie theatres, and/or establishments offering the sale or rental or
related machines, tapes, discs, books, magazines and novelty items;
check cashing establishments; liquor stores; massage parlors or spas; bars,
lounges or other establishments whose principal business is the sale of
alcoholic beverages; and night clubs or similar establishments, including
those offering strip tease or nudity as entertainment.
b. Office/Institutional and accessory uses at a maximum density of 3,667.48
square feet of gross floor area per area zoned (8,620.69 square feet per
acre based on 1.74 acres of Village Mixed Use)or a total gross floor area
of 15,000 square feet, whichever is less.
c. Limit the number of office buildings to 4, not exceeding 5,000 square feet.
d. No more than 9 total dwelling units at a maximum density of 2.2 units per
acre based on the total acreage zoned, whichever is less (3.83 units per
acre based on 2.35 acres Sub Village A Residential).
e. Approved lot/unit totals are not guaranteed. The developer is responsible
through site engineering (at the time of application for a Land
Disturbance Permit) to demonstrate that all lots/units within the approved
development meet or exceed all the development standards of the City
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 25 of 30
RZ07-005 VC07-002
of Milton. The total lot/unit yield of the subject site shall be determined by
this final engineering.
2. To the owner’s agreement to abide by the following:
a. To the revised site plan received by the Community Development
Department on July 12, 2007. Said site plan is conceptual only and must
meet or exceed the requirements of the Zoning Ordinance, other
applicable City Ordinances and these conditions prior to the approval of
a Land Disturbance Permit. In the even the Recommended Conditions of
Zoning cause the approved site plan to be substantially different, the
applicant shall be required to complete the concept review procedure
prior to application for a Land Disturbance Permit. Unless otherwise noted
herein, compliance with all conditions shall be in place prior to the
issuance of the first Certificate of Occupancy.
b. All recreational and common areas which may be held in common shall
be accessible by streets, sidewalks, or trails and the common areas in
accordance with the design standards of the draft Milton Trail Plan and
the newly established Right of Way Ordinance. Such shall be maintained
by an easement where necessary to the mandatory homeowners
association, who’s proposed documents of incorporation shall be
submitted to the Community Development Director for review and
approval prior to the recording of the first final plat.
3. To the owner’s agreement to the following site development considerations:
a. Duplexes – 4 with a total of 8 residential units
Single Family Alley Access residence – 1
b. Lot Size: Up to 4,800 square feet
Minimum Lot Frontage: 20 feet
Maximum Front Yard Setback: 10 feet
Minimum Side Yard Setback: 5 feet
Minimum Rear Yard Setback: 5 feet
c. Minimum heated floor area:
Duplexes – 1,800 square feet
Single Family Alley Access residence – 3,000 square feet
d. Provide a 15-foot landscape strip along the south and western property
lines where they are adjacent to AG-1 (Agricultural) zoned property.
(VC07-002)
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 26 of 30
RZ07-005 VC07-002
4. To the owner’s agreement to abide by the following requirements, dedication
and improvements:
a. Reserve sufficient land along the following roadways, prior to the
approval of a Land Disturbance Permit, as necessary to comply
with the Crabapple Crossroads Plan and the Transportation Master Plan
consistent with adjacent developments, pursuant to the Right of Way
Ordinance.
i. Inter-parcel access points as required by the Community
Development Director
b. Dedicate at no cost to the City of Milton prior to the approval of a
Land Disturbance Permit or Certificate of Occupancy (whichever
comes first), sufficient land as necessary to provide the following
rights-of-way, and dedicate at no cost to the City of Milton such
additional right-of-way as may be required to:
i. Provide at least 10.5 feet of right-of-way from the back of curb of all
abutting road improvements, along the entire property frontage, as
well as allow the necessary construction easements while the rights-
of-way are being improved.
ii. Provide 50 feet right-of-way for connector road, location to be
approved by the Transportation Engineer. This may occur prior to an
LDP of a future phase if a master plan with a phasing plan is a part
of the first LDP plan submitted.
iii. Provide adequate right-of-way dedication for addition of the
following or as approved by the Transportation Engineer:
.
a. Northbound right turn lane on Charlotte Dr.
b. Northbound left turn lane on Charlotte Dr.
c. Westbound Left Turn Lane on Mayfield.
d. Widening taper eastbound on Mayfield to accommodate lane
configuration.
c. Inter parcel access shall be required along the west property line.
Additional Inter-parcel walking trails are required to be installed, trail
easements recorded, and the HOA documents shall include a section of
Adopt A Trail creation. Sidewalk is required along the new. These items
are required as this site is located with the radii of the Safe Routes to
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 27 of 30
RZ07-005 VC07-002
School limits. Access points and trail locations shall be as approved by the
Transportation Engineer.
d. Installation of a new decorative mast arm traffic signal at the corner of
Charlotte Drive and Mayfield Road prior to a Certificate of Occupancy as
approved by the Transportation Engineer.
e. Village Residential area shall have a private named alley. The site plan
must provide adequate fire truck access in alleys and one-way
conditions; as per the newly established Right-of-Way Ordinance as
acceptable to the Transportation Engineer and Fire Marshal. This is
required to be shown using either AutoTurn type software or mechanical
methods for rear wheel tracking on LDP drawings.
f. LDP plans shall meet the newly established Right of Way Ordinance as
required by the Transportation Engineer.
5. a. The developer’s Professional Engineer shall demonstrate to the City by
engineering analysis submitted with the LDP application, that the
discharge rate and velocity of the storm water runoff resulting from the
development is restricted to seventy-five percent (75%) of the pre-
development conditions. The designed (assumed) underground facility
may not be located on individual lots but may be located on common
space, including if necessary locations underneath private alleys which
may never be dedicated to the City as public.
b. Stormwater detention facility shall utilize vegetative measures for water
quality. Individual Land Disturbance Permits/building permits are strongly
encouraged to utilize GASWCC limited application controls such as
infiltration trenches, porous surfaces, etc.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 28 of 30
RZ07-005 VC07-002
APPENDIX A
Comments on Public Services and Utilities
Note: Various City and/or County departments that may or may not be affected by the proposed
development provide the following information. Comments herein are based on the applicant’s
conceptual site plan and are intended as general non-binding information and in no manner suggest a
final finding by the commenter. All projects, if approved are required to complete the City of Milton
Plan Review process prior to the commencement of any construction activity.
Transportation Facilities:
Road name: Mayfield Road
Classification: Minor Arterial
Level of Service: F
Fulton County Health Department:
The Fulton County Health Department recommends that the applicant be required to connect the
proposed development to public water and public sanitary sewer available to the site.
If this proposed development includes a food service facility, the owner must submit kitchen plans for
review and approval by this department before issuance of a building permit and beginning
construction. The owner must obtain a food service prior to opening.
Plans of this facility must be submitted to this department for review and approval at the time of
application for a Land Disturbance Permit.
Fulton County Schools
Schools Crabapple Crossing
Elementary
Northwestern
Middle
Milton High School
Estimated Number of Students
Generated
6 to 10
4 to 5
4 to 6
State Capacity+
800
1,100
1,925
Enrollment++
831
1,206
2,088
Under/Over State Capacity+++
+31
+106
+163
Number of Portable Classrooms
07/08 School Year
4
4
4
Can Facility Meet Increased Demand? Yes Yes Yes
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 29 of 30
RZ07-005 VC07-002
+ Updated Georgia Department of Education state capacity
++ Enrollment based upon the official 10 day count of the 2006-2007 school year.
+++Positive values indicate numbers of students a facility is over state capacity/negative values indicated number of students a
facility is under state capacity.
Water and Wastewater (Sewer):
Water:
Anticipated water demand: 8,628 gallons per day
This project is +/- 25 linear feet from an existing water pipeline, located along Mayfield Road.
Comments: This information does not guarantee that adequate water volume and pressure are
available at this time or will be adequate upon application of permits. Please contact the Department
of Public Works for more information.
Sewer:
Basin: Big Creek
Treatment Plant: Big Creek
Anticipated sewer demand: 6,740 gallons per day
The nearest wastewater pipeline to this project is located in Land Lot 1136, District 2/2.
Comments: This information does not guarantee that adequate sewer capacity is available at this time
or will be available upon application of permits. Please contact the Fulton County Department of Public
Works for more information.
Hydrology:
Staff notes that the submitted site plan shows likely inadequate detention area locations. Locations
shall be as approved by the Stormwater Engineer.
Drainage:
Flood Plain: No Flood Plain.
Fulton County Tax Assessor
Property Tax ID#: 22 -4161-1134-041-2,
Taxes are up to date.
City of Milton Fire Marshal:
• 25-foot distance between parking spaces
• Identify road widths throughout
• Identify hydrant locations
• May have to provide a second exit
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
*Based on the Revised Site Plan received by the Community Development Department on 7/12/07
7/20/2007 Page 30 of 30
RZ07-005 VC07-002
APPENDIX B
Existing Commercial prior to the Plan - 20,408 square feet; Existing Office prior to the Plan- 5,229 square feet
Parcel # Currently Zoning Petition/Name/Location Approved SQ FT and/or Approved Density by Approved Overall
on Map Zoned Total Acerage Units based on Sub Area Acreage Land Use Sub Area Density
(++ Exceeds Plan Density)
1 MIX 03Z-115 / Crabapple Crossing Further Southeast 12,000 sq.ft. Vil. Mix 947.87 sq. ft/acre
12.66 Acres 31 units Mix Use/ Office/Res 4.94 units/acre
(Under Development)16 units Sub Vil B 2.5 units/acre
2 MIX 03Z-156 / Crabapple CrossroadEast, North, and Wes 12,000 sq ft Vil. Mix 2,970.30 sq.ft/acre 293.98 sq ft/acre
40.82 Acres 7 units Vil Mix Use (4.04 acres) 1.74 units/acre
(Under Development)11 units Vil Off/Res (2.2 acres)5 units/acre
8 units Sub Vil A (2.0 acres)4 units/acre
63 units Sub Vil B (24.5 acres)
2.58 units/acre++
5 units Rural Res (3.47 acres) 1.5 units/acre
6 units Res 0-1 u/a (4.61 acres)
1.31 units/acre++
3 C-1 03Z-146/ Crabapple Tea Room Further Southeast 800 sq. ft Mix Use 536.92 sq.ft/acre 536.92 sq.ft/acre
4 C-1 04Z-134 / Further Southeast 1,500 sq.ft Vil Mix 1,153.85 sq ft/acre 1,153.85 sq.ft./acre
5 C-1 04Z-136/ Interior Decoration Further Southeast 2,500 sq.ft Vil Mix 4,901.06 sq.ft./acre 4,901.06 sq.ft./acre
6 MIX 04Z-093/ Crabapple Station Southeast 19,000 sq.ft Vil Mix (5.63 acres) 3,374.77 sq.ft./acre 1,155.02 sq.ft./acre
16.45 Acres 3,000 sq.ft. Off/Res (3.22 acres) 931.68 sq,ft./acre 182.38 sq.ft./acre
28 Units Vil Mix (5.63 acres) 5 units/acre
11 Units Vil Off (3.22 acres) 3.42 units/acre
19 Units Sub Vil A (4.86 acres) 3.91 units/acre
7 Units Sub Vil B (2.74 acres) 2.56 units/acre*
(*extra unit approved for historic house saved)
7 R-1 05Z-002/ Subdivision Far Southeast 8 units Rural Res (5.96 acre ) 1.35 units/acre
5.96 acres
(Under Development)
8 C-1 05Z-030/ Far East 2,600 sq.ft. Vil Mix 6,089 sq.ft./acre 6,089 sq.ft./acre
(See #13).427 acre
9 MIX 05Z-070/ Crabapple Crossing East and 20,000 sq.ft. Vil Mix (7.84 acres) 2,551 sq.ft./acre 1,669.45 sq.ft/acre
11.98 acre (this includes rezoninfurther Northeas 20,000 sq.f ft Office in Vil Mix 2,551 sq.ft./acre 1,669.45 sq.ft/acre
portion of 03Z-156)39 Units Vil Mix (7.84 acres) 5 units/acre
(Under Development)5 Units Vil Off (1.04 acres) 5 units/acre
3 Units Sub Vil B (1.86 acres) 1.62 units/acre
2 Units Rural Res (1.18 acres) 2.55 units/acre* (*extra unit approved for historic house saved)
10 C-1 05Z-072 / Sally Rich Kolb Further Southeast 12,800 sq.ft. Vil Mix (1.36 acres) 9,500 sq.ft. counted 9,411.76 sq.ft./acre
1.36 acres 6,985.29 sq.ft/acre
12,800sf-1,850 existing-
1,450 sf bonus for saving historic house
11 C-1 05Z-110 / Larry Davenport Further Southeast 8,000 sq.ft Vil Mix
2.10 acres 6,300 sq.ft. Vil Off
12 MIX 05Z-117/ John Wieland Further North and Ea 2,532 sq ft Commercial Vil Mix
62.87 acres 36,468 sq ft Office Vil Mix
(Under Development)14 Units Vil Mix 1.61 units/acre
18 Units Vil Off/Res 7.01 units/acre++
17 Units Sub Vil B 6.35 units/acre++
50 Units Residential 0-1 1.09 units/acre++
13 MIX 06Z-047 / Bruce Harris Far East 20,800 sq.ft. Vil Mix 3,946.87 sq.ft/acre
(See #8)5.27 acres (2,600 sq. ft. Already Counted via 05Z-30)
2 Units Vil Off/Res 0.75 units/acre
4 Units Sub Vil A 3.37 units/acre
14 C-1 06Z-074 / Patton Further Southeast 12,000 sf Vil Mix Comm. previously approved 03Z-115 7,453.42 sq.ft./acre
1.61 acres 8,203 sf Vil Mix 5,095.04 sq.ft./acre
15 C-1 06Z-079 Far East 1,953 sf Vil Mix Comm. Converted historic structure to non residential
.941 acre
16 NUP 05Z-025 West 32 units 3.64 units/acre
8.79 acres
17 R-3 84Z-079/ Crabapple Chase S/D South (City of Alpharetta)1.7 units/acre
(Residential)MHFA:
1,750 sf
18 AG-1 U95-75/Cell Tower
Crabapple Knoll Vet Clinic Further West
19 R-4 Z94-079 Arbor North S/D Further Southwest 31 units 2.0 units/acre
(Residential)
20 C-1 Z81-78 Family Dentistry Further Southeast
(City of Alpharetta)
21 Alpharetta Gov't Center Further Southeast
(City of Alpharetta)
EXISTING ZONING AND USES IN CRABAPPLE CROSSROADS
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 1 of 17
RZ07-008
PETITION NUMBER:
RZ07-008
PROJECT NAME
The Milton Market
PROPERTY INFORMATION
ADDRESS 15260 Hopewell Road
DISTRICT, LAND LOT 2/2, 534
OVERLAY DISTRICT Northwest Overlay
EXISTING ZONING AG-1 (Agricultural)
PROPOSED ZONING C-1 (Community Business)
ACRES 0.524
EXISTING USE Former general store
PROPOSED USE N/A
OWNER Reunion Park, LLC
ADDRESS 15260 Hopewell Road
PETITIONER/REPRESENTATIVE Mark King
ADDRESS 240 Holcombe Hill Lane
Alpharetta, GA 30004
PHONE (770) 777-0863
INTENT
To rezone to C-1 (Community Business) the existing 1,179 square-foot general store
for an overall density of 2,250 square feet per acre.
Note: The Staff recommended an inappropriate zoning district, C-1 (Community
Business) for the proposed rezoning. Therefore, the proposed request is C-1
(Community Business) and includes only 0.524 acres for this district, allowing the
single family residence to remain AG-1 (Agricultural).
COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION
RZ07-008 – DEFERRAL 30 DAYS
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 2 of 17
RZ07-008
LOCATION MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 3 of 17
RZ07-008
CURRENT ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 4 of 17
RZ07-008
SITE PLAN – June 5, 2007
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 5 of 17
RZ07-008
SUBJECT SITE – STREET VIEW (HOPEWELL RD)
SUBJECT SITE:
The subject 0.524 acre site is zoned AG-1 (Agricultural) with an existing single
family house and a former general store.
Standards of Review
(Article 28.4.1) Planning Staff shall, with respect to each zoning application,
investigate and make a recommendation with respect to factors A. through G.,
below, as well as any other factors it may find relevant.
A. Whether or not the proposal will permit a use that is suitable in view of the
use and development of adjacent and nearby Property?
The proposed C-1 (Community Business) zoning is inconsistent with the
Focus Fulton 2025 Comprehensive Land Use Plan which recommends that
this site be developed with Agricultural, Forestry and Mining. The
proposed 1,179 square feet of commercial retail, within the former
general store, is primarily inconsistent with the Focus Fulton 2025
Comprehensive Land Use Plan.
B. Whether or not the proposal will adversely affect the existing use or
usability of adjacent or nearby property?
In Staff’s opinion, the proposed development is more intense than
recommended and will likely have an adverse effect on the use or
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 6 of 17
RZ07-008
usability of adjacent and nearby properties. In addition, the proposed
zoning is inconsistent with the Focus Fulton 2025 Comprehensive Land Use
Plan and adjacent and nearby zoning.
C. Whether the property to be affected by the proposal has a reasonable
economic use as currently zoned?
The existing store maybe utilized for other uses permitted in the AG-1
(Agricultural) district.
D. Whether the proposal will result in a use which will or could cause an
excessive or burdensome use of existing streets, transportation facilities,
utilities or schools?
It is Staff’s opinion that the proposed use may cause increased burden on
the streets and transportation facilities and utilities.
E. Whether the proposal is in conformity with the policies and intent of the
land use plan?
The proposed C-1 (Community Business) zoning is inconsistent with the
policies and intent of the Focus Fulton 2025 Comprehensive Land Use
Plan. A brief description of the project is noted below.
Focus Fulton 2025 Land Use Plan Map: Agricultural, Forestry and Mining
Proposed use/density:
General Store / 2,250 square feet per acre
The Focus Fulton 2025 Land Use Plan Map suggests Agricultural, Forestry
and Mining on the surrounding properties to the subject site.
The Milton City Council adopted the Focus Fulton 2025 Comprehensive
Plan as the City’s Comprehensive Plan on November 21, 2006. The
proposed development is inconsistent with the following Plan Policies:
• Preserve the existing rural character, as defined by such factors
as agricultural uses, visual appearance, tree densities,
greenspace, vegetation and use.
• Preserve and promote agricultural uses, as appropriate.
F. Whether there are other existing or changed conditions affecting the use
and development of the property which gives supporting grounds for
either approval or disapproval of the proposal?
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 7 of 17
RZ07-008
Staff notes that there is no evidence supporting an approval of the use
proposed, but the fact that all surrounding properties are zoned for AG-1
(Agricultural) and are recommended for Agricultural, Forestry and Mining
by the Focus Fulton 2025 Comprehensive Land Use Plan gives supporting
grounds for denial.
G. Whether the zoning proposal will permit a use which can be considered
environmentally adverse to the natural resources, environment and
citizens of the City of Milton?
Staff notes that the proposed rezoning will have a minimal impact on the
environment and natural resources.
Existing uses and zoning of nearby property (See Map following table)
Location Parcel / Zoning
Petition
Zoning / Name Approved
Density/Min.
Heated Floor Area
North 1
(AG-1)
AG-1 (Agricultural)
Various Single-Family
Residential
1 unit/acre
(Various sq.ft.)
Northeast 2
(AG-1)
AG-1 (Agricultural)
Various Single-Family
Residential
1 unit/acre
(Various sq.ft.)
East 3
(AG-1)
AG-1 (Agricultural)
Bell Memorial Park & Various
Single-Family Residential
1 unit/acre
(Various sq.ft.)
Southeast 4
(AG-1)
AG-1 (Agricultural)
Champions Overlook
Subdivision
1 unit/acre
(Est. 3,000 sq.ft.)
South 5
(AG-1)
AG-1 (Agricultural)
Various Single-Family
Residential
1 unit/acre
(Various sq.ft.)
Northwest 6
(AG-1)
AG-1 (Agricultural)
Various Single-Family
Residential
1 unit/acre
(Various sq.ft.)
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 8 of 17
RZ07-008
EXISTING USES AND ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 9 of 17
RZ07-008
H. Suitability of the subject property under the existing zoning district for the
proposed use?
The use can not be developed under the AG-1 (Agricultural) district. The
applicant is requesting a retail use that is not permitted under AG-1.
I. Suitability of the subject property under the proposed zoning district for the
proposed use?
The proposed use is suitable for the proposed zoning district of C-1
(Community Business). This zoning district allows for the proposed
retail/service commercial use.
J. The possible creation of an isolated zoning district unrelated to adjacent
and nearby districts.
The proposed rezoning to C-1 (Community Business) would create an
isolated district. There is currently no C-1 (Community Business) or C-1
(Community Business) in the immediate vicinity of the proposed rezoning
and the site is completely surrounded by AG-1 (Agricultural).
K. Possible effects of the change of the zoning or change in use on the
character of a zoning district or overlay district?
Staff notes that the proposed change of zoning may have a negative
impact on the character of the Northwest Overlay District by setting a
precedent for future commercial retail to develop along the Hopewell
Road corridor.
L. Whether the proposed zoning will be a deterrent to the value or
improvement of development of adjacent property in accordance with
existing regulations?
Staff is of the opinion that the change in the zoning may be a deterrent to
the value of adjacent properties developed or anticipated to be
developed under existing regulations.
M. The possible impact on the environment, including but not limited to,
drainage, soil erosion and sedimentation, flooding, air quality and water
quality?
Staff notes that the proposed rezoning may have an impact on the
environment because of the impervious surface of the existing parking lot
and absence of landscape strips.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 10 of 17
RZ07-008
N. The relation that the proposed zoning bears on the purpose of the overall
Land Use Plan with due consideration given to whether or not the
proposed change will carry out the purposes of this Land Use Plan.
The proposed rezoning as submitted is not consistent with the overall
Focus Fulton 2025 Comprehensive Land Use Plan for the area because the
proposed land use does not match the recommended Agricultural,
Forestry and Mining designation.
O. The consideration of the preservation of the integrity of residential
neighborhoods shall be considered to carry great weight. In those
instances in which property fronts on a major thoroughfare and also
adjoins an established residential neighborhood, the factor of preservation
of the residential area shall be considered to carry great weight.
The proposed rezoning indicates the non-residential use towards Hopewell
Road and continues to use the single family home as a residence. This is
not consistent with the area land uses of single family residential and
agricultural uses.
P. The amount of undeveloped or zoned land in the general area affected
which has the same zoning or future land use classification as the
proposed rezoning.
There are currently no existing approved zonings and land use
classifications surrounding the subject site that are similar to the proposed
rezoning.
SITE PLAN ANALYSIS
Based on the applicant’s site plan submitted to the Community Development
Department on June 5, 2007, Staff offers the following considerations:
Northwest Overlay District
BUILDING SETBACKS
Article 12H.3.5 Section C.1 of the Northwest Overlay District requires a maximum
20-foot building setback from the edge of the required landscape strip and/or
easements. The applicant’s site plan shows compliance with the requirement.
BUILDING HEIGHT
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 11 of 17
RZ07-008
Article 12H.3.5 Section D.1 of the Northwest Overlay District requires a maximum
height limit of two stories with the maximum height 30 feet from average-finished
grade to the bottom of the roof eave. The applicant’s proposal has indicated
no changes to the existing structures on the property which are compliant with
the requirement.
LANDSCAPE STRIPS AND BUFFERS
Article 12H.3.1 Section C.1 of the Northwest Overlay District requires a 50’
undisturbed buffer, with a 10’ improvement setback, shall be located adjacent
to all AG-1 zoning districts and all property zoned, used, or developed for
residential uses. The site plan does not show conformance with this requirement.
Staff recommends that the petition be DEFERRED 30 DAYS to allow proper
notification of a concurrent variance to reduce the 50’ undisturbed buffer and
10’ improvement setback to a 10’ landscape strip planted to buffer standards
along the south property line.
PARKING REQUIREMENTS
The following chart illustrates the parking required by Article 18 of the City of
Milton Zoning Ordinance for the proposed uses:
Proposed Use Minimum Requirement Spaces Provided
• Retail Service Commercial
(1,179 sq. ft.)
Total
• 6 spaces per 1,000 sq. ft. of
building area (5 spaces)
6 spaces required
• 6 spaces provided
6 spaces provided
Staff notes that the applicant is providing six (6) parking spaces, which meets
the required six (6) parking spaces required per Article 18 of the City of Milton
Zoning Ordinance. It also appears that the site plan is in compliance with the
landscape and layout requirements of Article 12H.1.
PUBLIC INVOLVEMENT
On June 27th, 2007 the applicant was present at the Community Zoning
Information Meeting held at the Milton City Hall. There were five to seven
members of the community in attendance. They were primarily concerned with
the inconsistency of the submitted plan, for the general store, with the Focus
Fulton 2025 Comprehensive Land Use Plan which recommends Agricultural,
Forestry and Mining for the subject site. In addition they feel that approval of this
existing structure as a retail store will set a precedent for further non-residential
zonings in the area.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 12 of 17
RZ07-008
Public Comments – Staff has received approximately 5 e-mails with the same
concerns as stated above which are attached to this report.
City of Milton Design Review Board Meeting – July 10, 2007
The following comment was made by the DRB:
o Concerned if there would be adequate parking.
Public Notice Requirements
The rezoning petition was advertised in the Milton Herald on July 4th, 2007 and
the sign was installed before the required date of July 3rd, 2007 along the
frontages of Hopewell Road and Thompson Road. The notice of rezoning was
sent, to adjacent property owners on July 9th, 2007.
Public Participation Plan and Report
The applicant has met the requirements of the Public Participation Plan. The
applicant will be required to submit the public participation report 7 days prior
to the Mayor and City Council meeting.
CONCLUSION
The proposed commercial retail and residential development is inconsistent with
the policies and intent of the Focus Fulton 2025 Comprehensive Land Use Plan
and inconsistent with recent Board Policy. Staff recommends a need for a
concurrent variance to reduce the 50’ undisturbed buffer and 10’ improvement
setback to a 10’ landscape strip planted to buffer standards. Therefore Staff
recommends that this request to C-1 (Community Business) be DEFERRED 30
DAYS. A set of Recommended Conditions are included if the Mayor and City
Council chooses to approve the proposed development as submitted.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 13 of 17
RZ07-008
RECOMMENDED CONDITIONS
If this petition is approved by the Mayor and City Council, it should be
APPROVED C-1 (Community Business) CONDITIONAL subject to the owner’s
agreement to the following enumerated conditions. Where these conditions
conflict with the stipulations and offerings contained in the Letter of Intent, these
conditions shall supersede unless specifically stipulated by the Mayor and City
Council.
1) To the owner’s agreement to restrict the use of the subject property as
follows:
a) Retail, service commercial and/or office and accessory uses in the
existing structure, including all exterior food and beverage service
areas, at a maximum density of 1,871.43 gross square feet per acre
zoned or a total of 1,179 square feet based on .63 acre, whichever
is less, but excluding convenience stores with gas pumps,
freestanding fast food restaurants, commercial amusements, day
care, businesses with drive-through service, pawn shops, check
cashing businesses, billiards or pool halls, designated recycling
collection stations, used car lots, self-service laundry facilities;
arcades, amusements, galleries or game rooms; outdoor vending
machines, kiosks or other stands except ATM machines; dry
cleaning plant excluding dry cleaning establishments which offer
drop-off/pickup service only; sale, lease or rental of motorized
vehicles or trailers; tattoo or body piercing parlors; adult theme
bookstores, video stores, movie theatres, and/or establishments
offering the sale or rental of related machines, tapes, discs, books,
magazines and novelty items; check cashing establishments; liquor
stores excluding wine shops; massage parlors or spas, excluding day
spas; bars, lounges or other establishments whose principle business
is the sale of alcoholic beverages; and night clubs or similar
establishments, including those offering strip tease or nudity as
entertainment.
2) To the owner’s agreement to abide by the following:
a) To the site plan received by the Community Development
Department on June 5, 2007. Said site plan is conceptual only and
must meet or exceed the requirements of the Zoning Ordinance, all
other applicable city ordinances and these conditions prior to the
approval of a Land Disturbance Permit. In the event the
Recommended Conditions of Zoning cause the approved site plan
to be substantially different, the applicant shall be required to
complete the concept review procedure prior to application for a
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 14 of 17
RZ07-008
Land Disturbance Permit. Unless otherwise noted herein,
compliance with all conditions shall be in place prior to the
issuance of the first Certificate of Occupancy.
3) To the owner’s agreement to the following site development
considerations:
a) The developer’s Professional Engineer shall demonstrate to the City by
engineering analysis submitted with the Land Disturbance Permit
application, that the discharge rate and velocity of the storm water
runoff resulting from the development is restricted to seventy-five
percent (75%) of the pre-development conditions, should more than
5,000 square feet be impervious or disturbed (whichever is greater) on
the entire parcel. Locations shall be as approved by the Stormwater
Engineer.
b) Stormwater detention facility shall utilize vegetative measures for water
quality. Individual Land Disturbance Permits/building permits are
strongly encouraged to utilize GASWCC limited application controls
such as infiltration trenches, porous surfaces, rain garden, etc.
c) To pump out the existing septic tank prior to Certificate of Occupancy.
4) To the owner’s agreement to abide by the following requirements,
dedication and improvements:
a) Reserve sufficient land as necessary to provide for compliance with
the Transportation Master Plan and the adjacent developments,
according to the definitions in the newly established Right of Way
Ordinance.
b) Dedicate at no cost to the City of Milton prior to the approval of a
Land Disturbance Permit or Certificate of Occupancy (whichever
comes first), sufficient land as necessary to provide the following
rights-of-way, and dedicate at no cost to the City of Milton such
additional right-of-way as may be required to:
(i) Provide at least 10.5 feet of right-of-way from the back of
curb of all abutting road improvements, along the entire
property frontage, as well as allow the necessary construction
easements while the rights-of-way are being improved.
(ii) Provide a 20-foot easement for the Milton Trail along
Hopewell Road and Thompson Road. Install section of trail
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 15 of 17
RZ07-008
along each frontage as approved by the Transportation
Engineer
(iii) Provide 20-foot from centerline right-of-way along both
Thompson Road and Hopewell Road.
c) Driveway entrances shall meet the Community Service Policies and
AASHTO guidelines.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 16 of 17
RZ07-008
APPENDIX A
Comments on Public Services and Utilities
Note: Various City and/or County departments that may or may not be affected by the
proposed development provide the following information. Comments herein are based on the
applicant’s conceptual site plan and are intended as general non-binding information and in
no manner suggest a final finding by the commenter. All projects, if approved are required to
complete the City of Milton Plan Review process prior to the commencement of any
construction activity.
Transportation:
Comments:
• The proposed mitigation conditions of zoning are in accordance with the Right of Way
Ordinance Section 3.2.d.
• Note that the site was paved up to the existing edge of roadway without a Right-of-Way
permit. This work does not meet City standards for location and no asphalt cores were
produced for City acceptance.
• All rezonings are required to submit traffic studies per Right-of-Way Ordinance, Article 8.
Note that a scoping meeting is required prior to beginning a traffic study and that traffic.
• Counts are not valid during the summer of the school year (until August 15, 2007).
• Scope of Required Traffic Study:
o Sight distance certification for all entrances
o Checklist for Traffic Impact Studies
o Discuss of how commercial use will affect offset intersection geometry and
operation.
Fulton County Health Department:
Comments:
• The Fulton County Health Department recommends that the applicant be required to
connect the proposed development to public water and public sanitary sewer available
to the site.
• If this proposed development includes a food service facility, the owner must submit
kitchen plans for review and approval by this department before issuance of a building
permit and beginning construction. The owner must obtain a food service prior to
opening.
• Plans of this facility must be submitted to this department for review and approval at the
time of application for a Land Disturbance Permit.
Fulton County Schools
Comments:
• Staff notes that the proposed rezoning will have minimal impact on the surrounding
school system.
Fulton County Tax Assessor:
Property Tax ID #: 22-4880-0534-019-6
Water and Wastewater (Sewer):
Water: Fulton County Public Works Department
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 17 of 17
RZ07-008
Anticipated water demand: No data available at printing.
This parcel is not on public sewer
Comments: This information does not guarantee that adequate water volume and pressure are
available at this time or will be adequate upon application of permits. Please contact the Fulton
County Department of Public Works for more information.
Comments:
• This information does not guarantee that adequate sewer capacity is available at this
time or will be available upon application of permits. Please contact the Fulton County
Department of Public Works for more information.
Drainage:
Flood Plain: No flood plain
Hydrology:
Types of detention proposed: None proposed, water quality required. If greater than 5,000
square feet, then detention required.
Comments:
• A concept Stormwater meeting with the Stormwater Engineer is required. The design and
layout shown with the rezoning site plan may or may not meet all minimums required by
the City and GASWMM state rules. Detailed design shall be shown on the LDP plans, after
said concept meeting. Staff notes that the submitted site plan shows likely inadequate
detention area locations.
City of Milton Fire Marshal:
Comments:
• No comment
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 1 of 19
RZ07-009 UP07-002 VC07-006
PETITION NUMBER(S):
RZ07-009
UP07-002
VC07-006
PROJECT NAME
Montessori School
PROPERTY INFORMATION
ADDRESS 3455 Morris Road
DISTRICT, LAND LOT 2/2 1045, 2/1 1044
OVERLAY DISTRICT State Route 9
EXISTING ZONING AG-1 (Agricultural)
PROPOSED ZONING A (Medium Density Apartments) and Use Permit
(Article 19.4.15)
ACRES 2.96
EXISTING USE 3 abandoned buildings
PROPOSED USE Day Care Facility
OWNER James Bagwell
PETITIONER/REPRESENTATIVE AHD Consultants, Inc. / David Shokoohi
ADDRESS 2145 Barnsmill Road, Marietta, GA 30062
PHONE 770-565-3933
INTENT
To rezone from AG-1 (Agricultural) to A (Medium Density Apartments) and to request
a Use Permit (Article 19.4.15) for a day care center to develop a 9,500 square foot
Montessori School with eight (8) classrooms at a density of 3,209.46 square feet per
acre. The applicant is also seeking a Concurrent Variance to decrease the 20-foot
landscape strip to 10 feet along Webb Road. (Since the application was submitted,
it was discovered that the subject site is currently zoned A (Medium Density
Apartments) pursuant to Z06-124, therefore the request for a rezoning is no longer
needed.
COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION
RZ07-009 – WITHDRAWAL
UP07-002 – APPROVAL CONDITIONAL
VC07-006 - DENIAL
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 2 of 19
RZ07-009 UP07-002 VC07-006
LOCATION MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 3 of 19
RZ07-009 UP07-002 VC07-006
CURRENT ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 4 of 19
RZ07-009 UP07-002 VC07-006
SITE PLAN – June 7, 2007
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 5 of 19
RZ07-009 UP07-002 VC07-006
Subject Site from Morris Road
Subject Site from Morris Road
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 6 of 19
RZ07-009 UP07-002 VC07-006
Subject Site from Webb Road
A. Existing uses and zoning of nearby property (See Map following table)
Location Parcel
/Zoning
Petition
Zoning/Name Approved
Density
North &
East
1
(Z96-124)
A (Medium Density
Apartments)
Alta Park Apts.
12 unit/acre
South 2
(Z96-125/
U96-67)
O&I (Office-Institutional)/ Use
Permit to exceed height
One Deerfield Centre
19,998 sq.ft./acre and 420
room hotel
Southwest 3
(Z02-53)
C-2 (Community Business)
Exxon and Various
Retail/Service
15,000 sq.ft./acre
Farther
Southwest
4
(Z97-125/U97-
54)
O-I (Office-Institutional)/Use
Permit to exceed height
Deerfield Corporate Centre
16,000 sq.ft./acre
West 5
(05Z-22)
MIX (Mixed Use)
Deerfield Green
8 units/acre, 2,000 sq.ft.
minimum heated floor area
Retail/Commercial / 1,760.91
sq/ft per acre
Farther
Northwest
6
(Z00-31)
TR (Townhouse Residential)
Morris Lake
6.23 units/acre
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 7 of 19
RZ07-009 UP07-002 VC07-006
EXISTING USES AND ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 8 of 19
RZ07-009 UP07-002 VC07-006
SUBJECT SITE:
The subject site contains 2.96 acres on the northeast corner of Webb and Morris
Roads. The property currently is developed with three large abandoned
buildings which will be demolished prior to development of the parcel. It is
currently zoned A (Medium Density Apartments) pursuant to Z96-124 and
located within an 8 to 12 units per acre Residential land use designation on the
Focus Fulton 2025 Comprehensive Future Land Use Map.
After further research by Staff, it was determined that the existing zoning for both
parcels included in the application was zoned A (Medium Density Apartments)
pursuant to Z96-124. Therefore, a rezoning from AG-1 (Agricultural) to A
(Medium Density Apartments) is not required. Therefore, Staff is recommending
that this portion of the application be withdrawn since a Use Permit for a Day
Care Facility is permitted in A (Medium Density Apartments). Since the rezoning
application was advertised for AG-1 (Agricultural) to A (Medium Density
Apartments, Staff’s discussion is included below:
Standards of Review
(Article 28.4.1) Planning Staff shall, with respect to each zoning application,
investigate and make a recommendation with respect to factors A. through G.,
below, as well as any other factors it may find relevant.
A. Whether or not the proposal will permit a use that is suitable in view of the
use and development of adjacent and nearby Property?
The proposed A (Medium Density Apartments) zoning to develop a day
care center is consistent with the Focus Fulton 2025 Comprehensive Future
Land Use Plan Map that recommends 8 to 12 units per acre Residential.
The adjacent and nearby property to the east, north and west is zoned
and developed for medium density residential and developed or under
development with multi-family residential uses.
B. Whether or not the proposal will adversely affect the existing use or
usability of adjacent or nearby property?
In Staff’s opinion, the proposed school and day care center will not
adversely affect the existing use or usability of adjacent or nearby
properties if developed with the Recommended Conditions.
C. Whether the property to be affected by the proposal has a reasonable
economic use as currently zoned?
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 9 of 19
RZ07-009 UP07-002 VC07-006
The subject site may have a reasonable use as currently zoned which is A
(Medium Density Apartments).
D. Whether the proposal will result in a use which will or could cause an
excessive or burdensome use of existing streets, transportation facilities,
utilities or schools?
The proposed development is not anticipated to have an adverse impact
on the existing public facilities and services in this area, provided the
Recommended Conditions are incorporated into the development of the
subject site.
E. Whether the proposal is in conformity with the policies and intent of the
land use plan?
The proposed multi-family zoning and day care center is consistent with
the policies and intent of the Focus Fulton 2025 Land Use Plan. A brief
description of the project is noted below:
Focus Fulton 2025 Land Use Plan Map: 8 to 12 units per acre Residential
Proposed use/density:
Day Care Center / 3,209.46 square feet per acre
The Focus Fulton 2025 Land Use Plan Map suggests 8 to 12 units per acre
Residential to the north and east of the subject site; to the south the Plan
Map suggests Office; Retail & Service to the southwest and Living-Working
to the west.
The Milton City Council adopted the Focus Fulton 2025 Comprehensive
Plan as the City’s Comprehensive Plan on November 21, 2006. The
proposed development is consistent with the following Plan Policies:
• Encourage compatible institutional uses in neighborhoods
and communities.
• Building heights should be compatible with the surrounding
area and/or be consistent with transitional policies and other
land use policies.
• Direct development to areas where infrastructure is provided
or planned.
• Locate housing, employment centers and services in areas
where public transit and transportation infrastructure are
available or planned.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 10 of 19
RZ07-009 UP07-002 VC07-006
F. Whether there are other existing or changed conditions affecting the use
and development of the property which gives supporting grounds for
either approval or disapproval of the proposal?
Existing zonings of high density residential and office in the area and
adopted land use policies support this request for Medium Density
Apartments to develop a day care facility. The proposal will call for the
removal of aging/dilapidating structures on the property, which currently
pose a public safety and code enforcement concern in their existing state
of disrepair.
G. Whether the zoning proposal will permit a use which can be considered
environmentally adverse to the natural resources, environment and
citizens of the City of Milton?
The proposed use is not considered environmentally adverse affecting
natural resources, the environment, or the citizens of Milton. However, the
applicant is required to comply with all of the City’s environmental
regulations at the time of application for Land Disturbance or Building
Permit.
In the interest of the public health, safety and welfare, the Mayor and Milton
City Council may exercise limited discretion in evaluating the site proposed for a
use that requires a Use Permit. In exercising such discretion pertaining to the
subject use, the Mayor City Council shall consider each of the following as
outlined in Article 19.2.4 of the Zoning Ordinance; Use Permit Considerations.
Staff has reviewed said items pertaining to the subject use, and offers the
following comments:
A. Whether the proposed use is consistent with the Land use or development
plans adopted by the City Council:
Provided the applicant complies with the Recommended Conditions of
this petition and the Use Permit requirements of Article 19.4.15 of the
Zoning Ordinance, the proposed development is consistent with the intent
and the following policies of the Focus Fulton 2025 Land Use Plan:
• Encourage compatible institutional uses in neighborhoods
and communities.
• Building heights should be compatible with the surrounding
area and/or be consistent with transitional policies and other
land use policies.
• Direct development to areas where infrastructure is provided
or planned.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 11 of 19
RZ07-009 UP07-002 VC07-006
• Locate housing, employment centers and services in areas
where public transit and transportation infrastructure are
available or planned.
B. Compatibility with land uses and zoning districts in the vicinity of the
property for which the use permit is proposed:
The proposed development is compatible with land uses and zoning
districts in the surrounding area, if the site is developed in accordance
with Staff’s Recommended Conditions and other City of Milton
development standards. The proposed 9,500 square foot day care center
at a density of 3,209.46 square feet per acre is compatible with the
surrounding multi-family residential and office development in the area.
C. Whether the proposed use may violate local, state and/or federal statutes,
ordinances or regulations governing land development;
The proposed use does not violate any known statutes, ordinances or
regulations governing land development.
D. The effect of the proposed use on traffic flow, vehicular and pedestrian,
along adjoining streets;
Staff anticipates that there will be an increase in vehicular traffic flow with
the proposed day care center. There maybe some increased pedestrian
flow since there is a concentration of high density residential within
walking distance. The applicant will be providing the required sidewalks
along both Webb and Morris Roads. Typically, this type of use is utilized by
residents and employees who are already utilizing the surrounding road
system. Road improvements included in the Recommended Conditions
will help to mitigate any negative impacts of increased traffic in the area.
E. The location and number of off-street parking spaces:
The applicant’s site plan shows that 24 parking spaces will be provided for
the proposed use and will be located in front and to the side of the
building. Staff is of the opinion that given the required landscaping along
perimeter property lines, there will be little to no impact on adjacent
properties.
F. The amount and location of open space:
Staff is of the opinion that the required building setbacks along with
buffers and landscape strips should provide adequate open space for the
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 12 of 19
RZ07-009 UP07-002 VC07-006
site. In addition, the applicant shows a large portion of the site
undeveloped in the front of the property.
G. Protective Screening:
The required landscape strips along Webb and Morris Roads and interior
property lines will screen the proposed use from adjacent residentially
zoning properties to the east, north and west, thus minimizing negative
impacts. The site shall provide a 6-foot high opaque privacy fence interior
to landscape strips and around the around the periphery of the proposed
play area.
H. Hours and Manner of Operation:
The applicant has stated that the operations for the day care will be
Monday through Friday, 6:30 a.m. to 6:30 p.m. The facility will be closed
on Saturday and Sundays. Staff is of the opinion that this use will not
negatively impact the adjacent properties if the Staff’s Recommended
Conditions are implemented to minimize the increased number of trips
generated by the use. Typically, this type of use is utilized by residents and
employees who are already utilizing the surrounding road system.
I. Outdoor Lighting:
The applicant has not indicated to Staff that there will be any type of
outdoor lighting. Given that there will be some sort of lighting within the
parking lot that shall conform to Article 12G.4.D. of the State Route 9
Overlay District at the time of Land Disturbance Permit. Staff is of the
opinion that the required landscape strips will minimize lighting escaping
from the site.
J. Ingress and Egress to the property:
The applicant’s site plan indicates that a driveway would be provided
from Webb Road to access the property. The site plan shows an
appropriate placement of the commercial driveway away from the
intersection of Webb and Morris Roads.
SITE PLAN ANALYSIS
Based on the applicant’s site plan submitted to the Community Development
Department on June 7, 2007 Staff offers the following considerations:
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 13 of 19
RZ07-009 UP07-002 VC07-006
BUILDING SETBACKS
Pursuant to Article 7.3.3., A (Medium Density Apartment District) the following
building setbacks are required:
Front – 40 feet along Morris Road
Side Corner – 40 feet along Webb Road
Rear – 25 feet along the east property line
Side – 25 feet along the north property lines
The site plan indicates conformance with the above specified building setbacks.
BUILDING HEIGHT
The applicant has stated that the proposed building will be 2 stories in height. It
does not specify the exact height but Staff notes that the A (Medium Density
Apartment District) allows buildings to be a maximum of 45 feet or 3 stories,
whichever is higher. It appears that the proposed building will be in
conformance with the district standards for height.
LANDSCAPE STRIPS
The site plan indicates a 10-foot landscape strip adjacent to interior property
lines which is in conformance with Article 4.32.1 of the Zoning Ordinance.
The site plan indicates a 40-foot and 20-foot landscape strip along Webb and
Morris Roads respectively. The required landscape strips pursuant to 12G.4.A
requires a 20-foot landscape strip. The applicant is requesting a concurrent
variance from 20 feet to 10 feet where the parking lot encroaches along the
south property line. Staff notes that only a 20-foot landscape is required. Based
on the configuration of the parcel, the amount of undeveloped property and
that the site is providing more parking than required; Staff is of the opinion that
the applicant has not demonstrated a hardship that is not self-imposed.
Therefore, Staff recommends DENIAL of VC07-006 to reduce the landscape strip
where the parking encroaches along the south property line.
PARKING REQUIREMENTS
The following chart illustrates the parking required by Article 18 of the City of
Milton Zoning Ordinance for the proposed uses:
Proposed Use Minimum Requirement Spaces Provided
• Day Care Facility
(9,500 sq.ft.)
(10 employees at largest
Shift)
• 1.7 spaces per 1000 sq.ft
plus one per 4 employees
on the largest shift.
(16 spaces plus 3 for
• 24 Spaces
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 14 of 19
RZ07-009 UP07-002 VC07-006
employees )
19 total spaces required
The applicant has indicated 10 employees on the largest shift. The total number
of spaces required is 19 and the site plan shows 24 spaces. At the time of Land
Disturbance, the applicant will be required to show compliance with the
minimum required parking spaces for the use.
OTHER CONSIDERATIONS
The proposed development is in compliance with the State Route 9 Overlay
District Standards. Staff notes that prior to a Land Disturbance Permit and any
Building Permits, the City of Milton Design Review Board will be required to
review it prior to these permits being issued.
PUBLIC INVOLVEMENT
The applicant attended the Community Zoning Information Meeting on June 27,
2007. There was no opposition to the proposed Montessori School at the
meeting. In addition, the Staff has not received any e-mails or phone calls
regarding this petition.
City of Milton Design Review Board Meeting – July 10, 2007
The applicant was not present at the Design Review Board meeting.
Public Notice Requirements
The rezoning petition was advertised in the Milton Herald on July 4, 2007 and the
sign was installed before July 3, 2007 along the frontages of Webb and Morris
Roads. The notice of rezoning was sent via United States Postal Service on July 9,
2007.
Public Participation Plan and Report
The applicant has met the requirements of Part 1 of the Public Participation Plan
as required by the Zoning Ordinance.
CONCLUSION
In Staff’s opinion, the proposed day care facility is consistent with Plan policies
and is an appropriate use for the area, if developed with the requirements of
the Zoning Ordinance and Staff’s Recommended Conditions. Therefore, Staff
recommends the Use Permit be APPROVED CONDITIONAL subject to the
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 15 of 19
RZ07-009 UP07-002 VC07-006
attached Recommended Conditions. Staff recommends that the rezoning
request, RZ07-009 be WITHDRAWN since it is not necessary.
Staff is of the opinion that the requested reduction of the 20-foot landscape strip
to 10 feet along the south property line adjacent to the parking would not meet
the intent and policies of the Zoning Ordinance. Therefore, Staff recommends
DENIAL of the concurrent variance
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 16 of 19
RZ07-009 UP07-002 VC07-006
RECOMMENDED CONDITIONS
If this petition is approved by the Mayor and City Council, it should be
APPROVED A (Medium Density Apartment) CONDITIONAL and a Use Permit for a
Day Care Facility (Article 19.4.15) subject to the owner’s agreement to the
following enumerated conditions. Where these conditions conflict with the
stipulations and offerings contained in the Letter of Intent, these conditions shall
supersede unless specifically stipulated by the Mayor and City Council.
1. To the owners agreement to restrict the use of the subject property as
follows:
a. Restrict the use of the subject property to a day care facility at a
maximum density of 3,209.46 square feet per acre zoned or a total
gross floor area of 9,500 square feet, whichever is less.
b. Restrict the number of students in the day care facility to 160.
2. To the owner’s agreement to abide by the following:
a. To the site plan received by the Community Development
Department on June 7, 2007. Said site plan is conceptual in nature
and must meet or exceed the requirements of the Zoning
Ordinance, all applicable city ordinances, and these
conditions prior to the approval of a Land Disturbance Permit. In
the even the Recommended Conditions of Zoning cause the
approved site plan to be substantially different, the applicant shall
be required to complete the concept review procedure prior to
application for a Land Disturbance Permit. Unless otherwise noted
herein, compliance with all conditions shall be in place prior to
the issuance of the first Certificate of Occupancy.
b. Prior to the issuance of a Certificate of Occupancy, comply with all
regulations of the Georgia Department of Human Resources and
file a copy of the approved registration with the Community
Development Department.
3. To the owner’s agreement to abide by the following requirements,
dedication and improvements:
a. Reserve sufficient along the following roadways, prior to the
approval of a Land Disturbance Permit, as necessary to comply
with the Transportation Master Plan consistent with adjacent
developments, pursuant to the Right of Way Ordinance.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 17 of 19
RZ07-009 UP07-002 VC07-006
b. Dedicate at no cost to the City of Milton prior to the approval of a
Land Disturbance Permit or Certificate of Occupancy (whichever
comes first), sufficient land as necessary to provide the following
rights-of-way, and dedicate at no cost to the City of Milton such
additional right-of-way as may be required to:
i. Provide at least 10.5 feet of right-of-way from the back of
curb of all abutting road improvements, along the entire
property frontage, as well as allow the necessary construction
easements while the rights-of-way are being improved.
ii. Provide 45 feet of right-of-way from centerline of both Morris
Road and Webb Road.
c. Driveway entrances shall meet the Community Service Policies and
AASHTO guidelines, or roads be reconstructed to meet such criteria,
at the approval of the Transportation Engineer. Driveway entrances
shall provide for the ninety-five percent (95%) queue with
uninterrupted traffic flow onto the main line and/or a minimum
throat length of two hundred feet.
4. a. The developer’s Professional Engineer shall demonstrate to the City
by engineering analysis submitted with the LDP application, that the
discharge rate and velocity of the storm water runoff resulting from
the development is restricted to seventy-five percent (75%) of the
pre-development conditions. The designed facility is required to be
underground. Locations shall be as approved by the Stormwater
Engineer.
b. Stormwater detention facility shall utilize vegetative measures for
water quality. Individual Land Disturbance Permits/building permits
are strongly encouraged to utilize GASWCC limited application
controls such as infiltration trenches, porous surfaces, rain gardens,
etc.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 18 of 19
RZ07-009 UP07-002 VC07-006
APPENDIX A
Comments on Public Services and Utilities
Note: Various City and/or County departments that may or may not be affected by the
proposed development provide the following information. Comments herein are based on the
applicant’s conceptual site plan and are intended as general non-binding information and in
no manner suggest a final finding by the commenter. All projects, if approved are required to
complete the City of Milton Plan Review process prior to the commencement of any
construction activity.
Transportation:
Comments:
• The proposed conditions of zoning are in accordance with the Right of Way Ordinance
Section 3.2.d.
• A traffic study is required for this rezoning per Right-of-Way Ordinance Article 8 (Daycare,
School, Rezoning) prior to the issuance of a Land Disturbance Permit. Note that the
ordinance also requires a scoping meeting prior to such study beginning and that counts
are required to be done during the school year (no earlier than August 15, 2007).
• Scope of Traffic Study Required:
o Sight distance certification of all entrances
o Fulfill City Checklist for Traffic Impact Study
Fulton County Health Department:
Comments:
• The Fulton County Health Department recommends that the applicant be required to
connect the proposed development to public water and public sanitary sewer available
to the site.
• If this proposed development includes a food service facility, the owner must submit
kitchen plans for review and approval by this department before issuance of a building
permit and beginning construction. The owner must obtain a food service permit prior to
opening.
• Plans of this facility must be submitted to this department for review and approval at the
time of application for a Land Disturbance Permit.
Fulton County Tax Assessor:
Property Tax ID #: 21-5480-1044-003 – Taxes are up to date.
Water and Wastewater (Sewer):
Water:
Anticipated water demand: Waiting for comments from Fulton County Public Works.
Comments:
• This information does not guarantee that adequate water volume and pressure are
available at this time or will be adequate upon application of permits. Please contact
the Fulton County Department of Public Works for more information.
Sewer:
Basin: Big Creek
Treatment Plant: Big Creek
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 19 of 19
RZ07-009 UP07-002 VC07-006
Anticipated sewer demand: Awaiting comments from Fulton County Public Works.
Comments:
• This information does not guarantee that adequate sewer capacity is available at this
time or will be available upon application of permits. Please contact the Fulton County
Department of Public Works for more information.
Drainage:
Flood Plain: No flood plain
Hydrology:
Type of Detention Proposed: Dry pond with four sided concrete walls. Underground
vault/pipes are requested when four sided concrete “ponds”
are designed.
Comments:
• A concept Stormwater meeting with the Stormwater Engineer is required. The design
and layout shown with the rezoning site plan may or may not meet all minimums required
by the City and GASWMM state rules. Detailed design shall be shown on the LDP plans,
after said concept meeting. Staff notes that the submitted site plan shows likely
inadequate detention area locations.
City of Milton Fire Marshal:
Comments:
• May need to provide three sides access with an approved apparatus turnaround.
• Roadways in and out need to maintain minimum widths for apparatus.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 1 of 19
UP07-001 VC07-004
PETITION NUMBER(S):
UP07-001
VC07-004
PROJECT NAME
North River Landscaping, LLC
PROPERTY INFORMATION
ADDRESS 15386 Birmingham Highway (SR 372)
DISTRICT, LAND LOT 2/2, 486
OVERLAY DISTRICT Northwest Overlay
EXISTING ZONING AG-1 (Agricultural)
PROPOSED ZONING N/A
ACRES 1.94
EXISTING USE Single family residence and small barn
PROPOSED USE Landscape business (Article 19.4.27)
OWNER Michael G. Boland, William G. Bradach, David A. Rindt
ADDRESS 15386 Birmingham Highway
PETITIONER/REPRESENTATIVE North River Landscaping, LLC
ADDRESS P.O. Box 2554
Roswell, GA 30077
PHONE (404) 374-9466
INTENT
To request a Use Permit for a landscape business operation, to use an existing
1,200 square foot home and a 500 square foot existing barn and develop a 3,750
square foot barn in the rear of property at an overall density of 2,089 square feet
per acre. In addition, to request a two part concurrent variance; Part 1: To
reduce the 50’ buffer and 10’ improvement setback to a 25’ buffer and 10’
improvement setback along the east and west property lines (Article
12H.3.4.c.1). Part 2: To reduce the 50’ setback adjacent to AG-1 (Agricultural)
to 30’ along the east property line (Article 19.4.27.B.3.)
COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION
UP07-001 – APPROVAL CONDITIONAL
Part 1 and 2 VC07-004 – APPROVAL CONDITIONAL
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 2 of 19
UP07-001 VC07-004
LOCATION MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 3 of 19
UP07-001 VC07-004
CURRENT ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 4 of 19
UP07-001 VC07-004
Site Plan - June 5, 2007
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 5 of 19
UP07-001 VC07-004
SUBJECT SITE – BACK YARD
SUBJECT SITE - BARN
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 6 of 19
UP07-001 VC07-004
SUBJECT SITE – PORCH TO STREET VIEW
SUBJECT SITE – STREET VIEW
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 7 of 19
UP07-001 VC07-004
SUBJECT SITE – STREET VIEW 2
SUBJECT SITE – WEST PROPERTY LINE
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 8 of 19
UP07-001 VC07-004
SUBJECT SITE – WOOD TO HOUSE VIEW
SUBJECT SITE:
The subject site is a 1.94 acre tract of agriculturally zoned land, located on the
northern side of Birmingham Highway (SR 372). The subject site is developed
with a single-family residence and a small barn. It is located within the
Agricultural, Forestry and Mining Land Use designation on the Focus Fulton 2025
Comprehensive Land Use Plan.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 9 of 19
UP07-001 VC07-004
Existing uses and zoning of nearby property (See Map following table)
Location Parcel /
Zoning Petition
Zoning / Name Approved
Density/Min.
Heated Floor Area
North 1
(AG-1)
AG-1 (Agricultural)
Various Single-Family
Residential
1 unit/acre
(Various sq.ft.)
East 2
(AG-1)
AG-1 (Agricultural)
Various Single-Family
Residential
1 unit/acre
(Various sq.ft.)
Southeast 3
(AG-1)
AG-1 (Agricultural)
Various Single-Family
Residential
1 unit/acre
(Various sq.ft.)
Further
Southeast
4
(AG-1)
AG-1 (Agricultural)
White Columns Subdivision
1 unit/acre
(Est. 3,000 sq.ft.)
South 5
(AG-1)
AG-1 (Agricultural)
Colonnade at White Columns
Subdivision
1 unit/acre
(Est. 3,000 sq.ft.)
West 6
(AG-1)
AG-1 (Agricultural)
Various Single-Family
Residential
1 unit/acre
(Various sq.ft.)
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 10 of 19
UP07-001 VC07-004
EXISTING USES AND ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 11 of 19
UP07-001 VC07-004
Pursuant to 2003U-019 and 2003U-029 a request for a use permit for a
landscaping business and agricultural related activities within the existing
buildings were approved by the Fulton County Board of Commissioners on
March 3, 2004. It is located on the south side of Hickory Flat Road adjacent to
the Fulton/Cherokee County line.
Pursuant to 2002U-021 and 2002VC-056 a use permit for a landscaping business
and a concurrent variance was approved by the Board of Commissioners on
September 4, 2002. It is located on Hopewell Road
Pursuant to 2004U-008 a request for a use permit and concurrent variance for a
landscaping business with a 4,000 square foot building was denied by the Fulton
County Board of Commissioners on September 1, 2004. It is located on the east
side of Birmingham Hwy north of Birmingham Road.
In the interest of the public health, safety and welfare, the Mayor and City
Council may exercise limited discretion in evaluating the site proposed for a use
that requires a Use Permit. In exercising such discretion pertaining to the subject
use, the Mayor and City Council shall consider each of the following as outlined
in Article 19.2.4 of the Zoning Ordinance; Use Permit Considerations. Staff has
reviewed said items pertaining to the subject use, and, offers the following
comments:
A. Whether the proposed use is consistent with the land use or economic
development plans adopted by the Mayor and City Council:
Provided the applicant complies with the Recommended Conditions of
this petition and the Use Permit requirements of Article 19.4.27. of the
Zoning Ordinance, the proposed development is consistent with the intent
and following policies of the Comprehensive Plan:
• Encourage compatible institutional uses in neighborhoods and
communities.
• Encourage development consistent with the surrounding scale,
transition of densities and uses, and Comprehensive Plan policies,
where appropriate.
B. Compatibility with land uses and zoning districts in the vicinity of the
property for which the use permit is proposed;
If developed in accordance with Staff’s Recommended Conditions and
the provisions of the Zoning Ordinance, the proposed landscape business
is expected to be compatible with other land uses in the surrounding
area.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 12 of 19
UP07-001 VC07-004
C. Whether the proposed use may violate local, state and/or federal statutes,
ordinances or regulations governing land development;
The proposed use does not violate any known local, state and/or federal
statutes, ordinances or regulations governing land development.
D. The effect of the proposed use on traffic flow, vehicular and pedestrian,
along adjoining streets;
The proposed use will not generate a significant increase in traffic.
E. The location and number of off-street parking spaces;
Article 18.2.1 requires the applicant to provide a minimum of 3 parking
spaces for the proposed development. Article 19.4.10 requires the
applicant to locate parking outside of the minimum 60-foot front yard
building setback. The applicant’s site plan indicates 3 parking spaces
which do meet the requirements set out by Article 18.2.1 and is located
outside the 60-foot front yard building setback.
F. The amount and location of open space;
The applicant’s site plan indicates that approximately two-thirds of the
subject site is undeveloped. Staff is of the opinion that the proposed
development will provide adequate open space.
G. Protective screening;
If developed in accordance with the requirements of the Zoning
Ordinance and the Northwest Fulton Overlay District, the buffer and
landscape strip requirements and the existing screening around the
structures will provide adequate screening for the proposed
development.
H. Hours and manner of operation;
The applicant indicated that there will be about 1 or 2 attendees for
administrative purposes on site daily, with the other staff being off-site
performing landscaping maintenance, with hours of operation from 8:00
a.m. to 5:00 p.m. Staff is of the opinion that the hours and manner of
operation will have a minimal impact upon the adjacent properties and
the surrounding community.
I. Outdoor lighting;
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 13 of 19
UP07-001 VC07-004
At the time of Land Disturbance Permit the site shall be in compliance with
Article 12H.3.4 of the Northwest Fulton Overlay District regarding outdoor
lighting. Staff notes that the subject site’s required buffers, and existing
screening, will help mitigate the impact of lights on the adjacent
properties.
J. Ingress and egress to the property.
• The applicant’s site plan indicates one curb cut on Birmingham
Highway. Staff notes that the curb cut currently exists and that the
applicant is not requesting any additional curb cuts. The Traffic
Engineer is requiring a site distance Sight Distance certification by a
Professional Engineer
Given the limited use of the subject site, Staff is of the opinion that the
proposed development will have limited impact upon the community.
SITE PLAN ANALYSIS
Based on the applicant’s site plan submitted to the Community Development
Department on June 5, 2007, Staff offers the following considerations:
Northwest Overlay District
BUILDING SETBACKS
Article 12H.3.5 Section C.2 of the Northwest Overlay District requires a maximum
30-foot building setback from the edge of the required landscape strip and/or
easements. The applicant’s site plan shows compliance with the requirement.
The existing barn adjacent to the west property line is an existing non-
conforming setback.
BUILDING HEIGHT
Article 12H.3.5 Section D.1 of the Northwest Overlay District requires a maximum
height limit of two stories with the maximum height 30 feet from average-finished
grade to the bottom of the roof eave. The applicant’s letter of intent has
indicated that they will remain within these requirements.
LANDSCAPE STRIPS AND BUFFERS
Article 12H.3.1 Section C.1 of the Northwest Overlay District requires a fifty (50)
foot-wide undisturbed buffer, with a 10’ improvement setback, located
adjacent to all AG-1 zoning districts and all property zoned, used, or developed
for residential uses. The applicant has requested a concurrent variance to
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 14 of 19
UP07-001 VC07-004
reduce this undisturbed buffer to a 25’ undisturbed buffer with a 10’ setback
along the east and west property lines. Due to the narrow configuration of the
property the applicant has demonstrated a non self-imposed hardship, and
Staff therefore recommends APPROVAL CONDITIONAL to Part One of the
Concurrent Variance VC07-004. Staff notes that the existing barn along the
western property line provides no buffer.
PARKING REQUIREMENTS
The following chart illustrates the parking required by Article 18 of the City of
Milton Zoning Ordinance for the proposed use:
Proposed Use Minimum Requirement Spaces Provided
• General Office
(1,000 sq. ft.)
Total
• 3 spaces per 1,000 sq. ft. of
building area. (3 spaces)
3 spaces required
• 3 paved spaces
3 spaces provided
Staff notes that the applicant is providing three (3) parking spaces, which meets
the required three (3) parking spaces per Article 18 of the City of Milton Zoning
Ordinance. It also appears that the site plan is in compliance with the
landscape and layout requirements of Article 12H.1.
USE PERMIT STANDARDS
The site plan meets standards of 19.4.27 B. with exception to:
• All use areas/structures other than parking and pedestrian walkways shall
be located at least 50’ from any adjoining residential district of AG-1
(Agricultural) district.
The applicant is requesting a concurrent variance to reduce the 50’ setback
adjacent to AG-1 (Agricultural) to 30’ along the east property line. Due to the
narrow configuration of the property the applicant has demonstrated a non
self-imposed hardship, and Staff therefore recommends APPROVAL
CONDITIONAL to Part Two of the Concurrent Variance VC07-004.
PUBLIC INVOLVEMENT
On June 27th, 2007 the applicant was present at the Community Zoning
Information Meeting held at the Milton City Hall. There was no one in
attendance from the community.
Public Comments – Staff has not received any comments via e-mail, phone, or
letters.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 15 of 19
UP07-001 VC07-004
City of Milton Design Review Board Meeting – July 10, 2007
The following recommendations were made by the DRB:
• The Design Review Board was not in support of the concurrent variance.
Public Notice Requirements
The use permit petition was advertised in the Milton Herald on July 4th, 2007 and
the sign was installed before the required date of July 3rd, 2007 along the
frontage of Birmingham Highway. The notice of rezoning was sent, to adjacent
property owners, on July 9th, 2007.
Public Participation Plan and Report
The applicant has met the requirements of the Public Participation Plan. The
applicant will be required to submit the public participation report 7 days prior
to the Mayor and City Council meeting.
CONCLUSION
The proposed landscape business is consistent with Council and Plan Policies
and compatible with the surrounding area, if developed in accordance with
the requirements of the Zoning Ordinance and Staff’s Recommended
Conditions. Therefore, Staff recommends APPROVAL CONDITIONAL of the
proposed Use Permit for a landscape business and APPROVAL CONDITIONAL of
Parts 1 and 2 the concurrent variance.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 16 of 19
UP07-001 VC07-004
RECOMMENDED CONDITIONS
If this petition is approved by the Mayor and City Council, it should be approved
USE PERMIT for a landscape business (Article 19.4.27.) CONDITIONAL subject to
the owner’s agreement to the following enumerated conditions. Where these
conditions conflict with the stipulations and offerings contained in the Letter of
Intent, these conditions shall supersede unless specifically stipulated by the
Mayor and City Council.
1) To the owner’s agreement to restrict the use of the subject property as
follows:
a) Landscaping business in the existing structure(s) and one 3,750
square-foot future barn. No modifications will be made to the
exterior of the structure(s), other than normal maintenance.
b) Total square footage of all structures shall not exceed 5,250 square
feet, or a density of 2,706 square feet per acre.
2) To the owner’s agreement to abide by the following:
a) To the site plan received by the Milton Community Development
Department on June 5, 2007. Said site plan is conceptual only and
must meet or exceed the requirements of the Zoning Ordinance
and these conditions prior to the approval of a Land Disturbance
Permit or Certificate of Occupancy, whichever comes first. Unless
otherwise noted herein, compliance with all conditions shall be in
place prior to the issuance of the first Certificate of Occupancy.
3) To the owner’s agreement to the following site development
considerations:
a) Reduce the 50’ buffer and 10’ improvement setback along the east
and west property lines to a 25’ buffer and 10’ improvement
setback and to the extent necessary to allow the structures to
comply (Part 1 VC07-004).
b) Reduce the 50’ setback adjacent to AG-1 (Agricultural) to 30’
along the east property line (Part 2 VC07-004).
c) No more than one (1) exit/entrance on Birmingham Highway. Curb
cut location and alignment are subject to the approval of the
Milton Traffic Engineer.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 17 of 19
UP07-001 VC07-004
4) To the owner’s agreement to abide by the following requirements,
dedication and improvements:
a) Reserve Right of Way necessary along the following
roadways, prior to the approval of a Land Disturbance Permit,
sufficient land as necessary to provide for compliance with
the Transportation Master Plan and the adjacent
developments, according to the definitions in the newly
established Right of Way Ordinance.
b) Dedicate at no cost to the City of Milton prior to the approval
of a Land Disturbance Permit or Certificate of Occupancy
(whichever comes first), sufficient land as necessary to
provide the following rights-of-way, and dedicate at no cost
to the City of Milton such additional right-or-way as may be
required to:
(i) Provide at least 10.5 feet of right-of-way from the back
of curb of all abutting road improvements, along the
entire property frontage, as well as allow the necessary
construction easements while the rights-of-way are
being improved.
(ii) Provide 20-foot Milton Trail easement along Birmingham
Highway (SR 372), outside of the required Landscaping
Strip.
(iii) Pay into sidewalk fund rather than install sidewalk
across frontage as this phase of the Milton Trail is
scheduled in Long Range.
d) Driveway entrances and roads shall meet the Community
Service Policies and AASHTO guidelines:
i) Remove and replace existing fence 10 feet farther from
Birmingham Highway (SR 372) for sight visibility.
ii) Remove trees from frontage of property to provide
proper line of sight visibility.
5) To the owner’s agreement to abide by the following:
a) The developer’s Professional Engineer shall demonstrate to the
City by engineering analysis submitted with the LDP application
(should greater than 5000 square feet be disturbed), that the
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 18 of 19
UP07-001 VC07-004
discharge rate and velocity of the storm water runoff resulting
from the development is restricted to seventy-five percent (75%)
of the pre-development conditions. Locations shall be as
approved by the Stormwater Engineer.
b) The proposed development shall utilize vegetative measures for
water quality. Individual Land Disturbance Permits/Building
Permits are strongly encouraged to utilize GASWCC limited
application controls such as infiltration trenches, porous surfaces,
rain gardens, etc. A maintenance agreement is required to be
recorded for such item used.
c) Septic tank to be pumped out prior to Certificate of
Occupancy.
d) Exterior bulk storage areas shall be protected from erosion and
detailed on the Building Permit/Land Disturbance Plan.
Prepared by the Community Development Department for the
Planning Commission Meeting on July 24, 2007
7/20/2007 Page 19 of 19
UP07-001 VC07-004
APPENDIX A
Comments on Public Services and Utilities
Note: Various City and/or County departments that may or may not be affected by the
proposed development provide the following information. Comments herein are based on the
applicant’s conceptual site plan and are intended as general non-binding information and in
no manner suggest a final finding by the commenter. All projects, if approved are required to
complete the City of Milton Plan Review process prior to the commencement of any
construction activity.
Transportation:
Road name: Birmingham Highway
Classification: Arterial
Comments:
• A traffic study is required with the following scope:
o Sight Distance certification by a Professional Engineer
Fulton County Tax Assessor:
Property Tax ID#: 22-4070-0486-027-7 – Residential Lots
Water and Wastewater (Sewer):
Comments:
• This information does not guarantee that adequate water volume and pressure are
available at this time or will be adequate upon application of permits. Please contact
the Department of Public Works for more information.
Sewer: Septic System
Basin: Little River
Drainage:
Disturbed Area: less than 5,000 square feet
Impervious Area: less than 5,000 square feet
Hydrology:
Comments:
• Vegetative water quality items needed.
• A concept Stormwater meeting with the Stormwater Engineer is required. The design
and layout shown with the rezoning site plan may or may not meet all minimums required
by the City and GASWMM state rules. Detailed design shall be shown on the Land
Disturbance Permit plans, after said concept meeting. Staff notes that the submitted site
plan shows likely inadequate detention area locations.
City of Milton Fire Marshal:
Comments:
• May need to provide approved fire department access road to barn and turn-around.
• Possible hydrant near barn.