HomeMy WebLinkAboutPacket - PC - 06-24-2008 City of Milton
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 C Milton, GA 30004
PLANNING COMMISSION AGENDA
Tuesday June 24, 2008, 7:00 pm
Agenda Item Description Meeting
Dates**
Staff
Recommendation
PC
Recommendation
I. INVOCATION
II. CALL TO ORDER
III. PLEDGE OF
ALLEGIANCE
IV. PUBLIC COMMENT
A. Approval of Minutes Minutes from the April 22, 2008
Planning Commission Meeting
Approval
Minutes from the May 27, 2008
Planning Commission Meeting
Approval
V. REZONINGS/USE
PERMITS
Deferred
A. U03-03 2810, 2820, 2830, 2840, 2850,
2860 Bethany Bend Road (AG-1)
Applicant; Church of Jesus
Christ of Latter Day Saints
Requesting a Use Permit for a
16,728 square foot church with
352 seats, at a density of
2,320.95 square feet per acre on
approximately 7.2074 acres
CZIM- 3/26/08
& 4/23/08
PC – 5/27/08 &
6/24/08
MCC – 7/21/08
U08-03 – WITHDRAWAL
(Based on the Applicant’s
Request)
VI. Adjourn
**Meeting Codes: CZIM-Community Zoning Information Meeting; DRB-Design Review Board;
PC-Planning Commission; MCC-Mayor and City Council
1
PETITION NUMBER(S):
U08-03
PROJECT NAME
The Church of Jesus Christ of Latter-Day Saints
PROPERTY INFORMATION
ADDRESS 2810, 2820, 2830, 2840, 2850, 2860
Bethany Bend Road
DISTRICT, LAND LOT 2/2, 832
OVERLAY DISTRICT State Route 9 Overlay
EXISTING ZONING AG-1
ACRES 7.2074
EXISTING USE Undeveloped
PROPOSED USE Church
OWNER Cogburn and Bethany LLC
ADDRESS 2965 Manor Bridge Dr.
Alpharetta, Georgia 30004
PETITIONER/REPRESENTATIVE Church of Jesus Christ of Latter-Day Saints
INTENT
To request a use permit for a 16,728 square feet church with 352 seats and storage
shed, at a density of 2,320.95 square feet per acre on 7.2074 acres.
COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION
U08-03: WITHDRAWAL
Based on a letter received by the City of Milton Community Development
Department on June 17, 2008 requesting withdrawal by the applicant (Attached
to this Staff Report).
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 1 of 23
U08-03
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 2 of 23
U08-03
LOCATION MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 3 of 23
U08-03
CURRENT ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 4 of 23
U08-03
SITE PLAN—SUBMITTED June 4, 2008
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 5 of 23
U08-03
LOOKING AT SUBJECT SITE FROM THE SOUTH
LOOKING AT SUBJECT SITE FROM THE SOUTH
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 6 of 23
U08-03
LOOKING WEST FROM SUBJECT SITE
SUBJECT SITE:
The subject site is a 7.2074 acre tract of agriculturally zoned land, located on the
northeast side of the intersection of Coburn and Bethany Bend Roads. The
subject site is undeveloped and is located within the Agricultural, Forestry and
Mining Land Use designation on the Focus Fulton 2025 Comprehensive Land Use
Plan.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 7 of 23
U08-03
Existing uses and zoning of nearby property (See Map following table)
Location Parcel / Zoning
Petition
Zoning / Name Approved
Density/Min. Heated
Floor Area
North 1
(AG-1)
AG-1 Agricultural
Scattered homes
Min. 1 unit/acre
Farther North 2
(AG-1)
AG-1 Agricultural
Oakstone Glen Subdivision
Min. 1 unit/acre
Fartherst North 3
(R-2 Cond’l)
Z77-106
R-2 Conditional
Five Acres Estates
Min. 1 unit/acre
Northeast 4
(C-1 Cond’l)
Z00-052
C-1 Conditional
Kids “R” Kids Learning
Center
4,771.25 square
feet/acre
Total of 14,600 total
square feet with 240
students
East 5
(C-1 Cond’l)
Z04-022
C-1 Community Business
Retail Shopping Center
7,314.03 square
feet/acre
Farther East 6
(O-I)
RZ-07-010
O-I Office Institutional
Offices and Bank
5,332 square
feet/acre
Southeast 7
(C-1)
06Z-096
C-1
Community Business
Commercial Retail with Fast
Food Restaurant
(under development)
5,690.91 square
feet/acre
Southeast 8
(C-1 Cond’l)
Z99-77
C-1 Conditional
Retail Shopping Center
7,846.04 square
feet/acre
South 9
(CUP Cond’l)
05Z-115
CUP Conditional
Currently undeveloped
2.98 units/acre
Southwest
In Alpharetta
10
(AG-1)
05U-002
AG-1 Agricultural
Kings Ridge Christian School
4,872.13 square feet
per acre
Total of 341,000
square feet
West 11
(AG-1)
AG-1 Agricultural
Scattered residential
Min. 1 unit/acre
Farther West 12
(AG-1)
97U-21
AG-1 Agricultural
Morning Star Church
878 square feet/
acre
Total of 7,250 square
feet and 120 seats
Farthest West 13
(AG-1)
AG-1 Agricultural
Scattered residential
Min. 1 unit/acre
Northwest 14
(R-2A Cond’l)
Z72-194
R-2A Conditional
Bethany Green
Subdivision
None given
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 8 of 23
U08-03
EXISTING USES AND ZONING MAP
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 9 of 23
U08-03
In the interest of the public health, safety and welfare, the Mayor and City
Council may exercise limited discretion in evaluating the site proposed for a use
that requires a Use Permit. In exercising such discretion pertaining to the subject
use, the Mayor and City Council shall consider each of the following as outlined
in Article 19.2.4 of the Zoning Ordinance; Use Permit Considerations. Staff has
reviewed said items pertaining to the subject use, and offers the following
comments:
A. Whether the proposed use is consistent with the land use or economic
development plans adopted by the Mayor and City Council:
Provided the applicant complies with the Recommended Conditions of
this petition and the Use Permit requirements of Article 19.4.10. of the
Zoning Ordinance, the proposed development is consistent with the intent
and following policies of the Comprehensive Plan:
• Encourage compatible institutional uses in neighborhoods and
communities.
• Encourage development consistent with the surrounding scale,
transition of densities and uses, and Comprehensive Plan policies,
where appropriate.
B. Compatibility with land uses and zoning districts in the vicinity of the
property for which the use permit is proposed;
If developed in accordance with Staff’s Recommended Conditions and
the provisions of the Zoning Ordinance, the proposed church is expected
to be compatible with other land uses in the surrounding area.
C. Whether the proposed use may violate local, state and/or federal statutes,
ordinances or regulations governing land development;
The proposed use does not violate any known local, state and/or federal
statutes, ordinances or regulations governing land development.
D. The effect of the proposed use on traffic flow, vehicular and pedestrian,
along adjoining streets;
The proposed use may generate an increase in traffic primarily on
Sundays, but recommended conditions should mitigate the increase in
traffic. The applicant is conditioned to providing a full access from
Bethany Bend Road and an entrance-only access from Cogburn Road
because of lack of sight distance. In addition, the Milton Trail will be
developed along the north side of Bethany Bend Road and the east side
of Cogburn Road.
E. The location and number of off-street parking spaces;
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 10 of 23
U08-03
Article 18.2.1 requires the applicant to provide a minimum of 101 parking
spaces for the proposed development. Article 19.4.10 requires the
applicant to locate parking outside of the minimum 60-foot front yard
building setback and indicated compliance on the site plan. Staff notes
that the applicant’s site plan indicates 199 parking spaces which exceeds
the minimum parking requirement. The site plan indicated that the
parking is 75 feet from the north property line, which is 40 feet farther than
the required 25 feet undisturbed buffer and 10-foot improvement setback.
F. The amount and location of open space;
The applicant’s site plan indicates that approximately one third of the
subject site is undeveloped. Staff is of the opinion that the proposed
development will provide adequate open space for the proposed
development, but the amount of open space would be greater without
the proposed excessive parking.
G. Protective screening;
If developed in accordance with the requirements of the Zoning
Ordinance and the State Route 9 Overlay District, the buffer and
landscape strip requirements and the existing screening around the
structures will provide adequate screening for the proposed
development. Staff notes that with the additional 40 feet of setback
along the north property line, required recompense trees can be planted
in this area to further screen the adjacent residential properties to the
north.
H. Hours and manner of operation;
The applicant has stated that the operations for the church will be
primarily on Sunday. The applicant specified that this particular church
would most likely start off with two (2) services on Sunday, meeting at two
separate times and not overlapping, with the potential of a third if later
needed. There is potential for up to three (3) overlapping services. The
first service would begin around 9:00 a.m. and the overlapping services
would last into the afternoon. There will be two congregations or “wards”
meeting at the same time for approximately an hour. One ward would
be in the sanctuary while the other would be meeting in the classrooms.
The facility also has the potential to hold community gatherings during the
week, but these are subject to demand. Staff is of the opinion that this
use will not negatively impact the adjacent properties if the Staff’s
Recommended Conditions are implemented to minimize the increased
number of trips generated by the use. Typically, this type of use is utilized
by residents and employees who are already utilizing the surrounding
road system.
I. Outdoor lighting;
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 11 of 23
U08-03
At the time of Land Disturbance Permit the site shall be in compliance with
Article 12G.4.D of the State Route 9 Overlay District regarding outdoor
lighting. Staff notes that the subject site’s required buffers, and existing
screening, will help mitigate the impact of lights on the adjacent
properties.
J. Ingress and egress to the property.
The applicant’s site plan indicates one curb cut on Cogburn Road for
entrances only and one full access curb cut on Bethany Bend Road. Staff
notes that the curb cuts do not currently exist. Staff further notes that the
Traffic Engineer estimates 232 trips per day with 116 peak hour trips for one
service or ward at a time. Given the limited use of the subject site, Staff is
of the opinion that the proposed development will have limited impact
upon the community.
Based on the results of the above Use Permit considerations that demonstrate
the proposed church an appropriate use for the site, Staff recommends
APPROVAL CONDITIONAL of U08-03.
SITE PLAN ANALYSIS
Based on the applicant’s site plan submitted to the Community Development
Department on June 4, 2008, Staff offers the following considerations:
USE PERMIT STANDARDS
The site plan is in compliance with the development standards of Article 19.4.10
for a Church.
BUILDING SETBACKS
Article 5.1.3 AG-1 (Agricultural) states that the following building setbacks are
required for the proposed development:
• Front Yard Setback: 60 feet
• Minimum Side Yard: 25 feet adjacent to interior line, 40 feet adjacent to
street
• Rear Yard Setback: 50 feet
The site plan indicates compliance with the above stated building setbacks.
BUILDING HEIGHT
Article 5.1.3 limits the building height to 40 feet in AG-1 zoning. The applicant
has not specifically indicated the height of the proposed structure, but must
meet this standard before obtaining a building permit. Staff notes that the
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 12 of 23
U08-03
zoning districts’ maximum height limitation for structures does not apply to
church spires and belfries (Article 4.3.3.).
State Route 9 Overlay District
LANDSCAPE STRIPS AND BUFFERS
Article 12G.4 Section A.1 of the State Route 9 Overlay District requires a minimum
20-foot wide landscape strip along both Cogburn Road and Bethany Bend
Road if the original requirements in Article 4 of the Zoning Ordinance specify a
smaller landscape strip. In Article 4.23.1, Bethany Bend Road is considered a
“side corner” and is required to have a 20-foot landscape strip, which is in
compliance with Article 12G.4 Section A.1 of the State Route 9 Overlay District.
Cogburn Road is considered the “front yard” and is required to have a 40-foot
landscaping strip, which overrides the 20-foot landscape strip required in Article
12G.4 Section A.1 of the State Route 9 Overlay District.
Article 4.23.1 reads that in AG-1, the following is required:
• Front yard landscape area- 40 feet (Cogburn Road)
• Side Corner yard landscape area- 20 feet (Bethany Bend Road)
• Side yard buffer- 25 feet and 10-foot improvement setback (North
property line)
• Rear yard buffer- 50 feet and 10-foot improvement setback (East property
line)
The applicant’s site plan appears to follow all of these requirements.
Article 12G.4 Section A.3 further states that for every thirty (30) linear feet of
landscape strip, a minimum of one 3” caliper hardwood shade tree is required
to be planted in the center of the landscape strip or as approved by the
Director.
On page 15 of this document is a map with comments made by the City
Arborist on the trees in question on the site. Tree #4 is found to be dead, and
tree #2 is not a specimen tree as indicated on the applicant’s site plan.
Because of the amount of grading that is required for the septic field, along with
the grading for the driveway and entrance on Cogburn Road, Staff believes
that the size of the required 40-foot landscape strip will not cause any hardship
to the applicant in regards to the tree save area and septic field.
PEDESTRIAN PATHS
Article 12G.4 Section C.1of the State Route 9 Overlay District requires a minimum
6-foot wide sidewalk along all public and private road frontages. The Milton Trail
requires a 10-foot asphalt multi-use path along both Cogburn Road and
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 13 of 23
U08-03
Bethany Bend Road adjacent to the subject property. The 10-foot asphalt multi-
use path is reflected in the Recommended Conditions.
PARKING REQUIREMENTS
The following chart illustrates the parking required by Article 18 of the City of
Milton Zoning Ordinance for the proposed use:
Proposed Use Minimum Requirement Spaces Provided
• Church • 1 space per 3.5 seats (352 • 174 paved spaces
(352 seats)
seats/3.5) • 25 pervious overflow
spaces
101 spaces required 199 total spaces
Staff notes that the applicant is providing 199 parking spaces, which exceeds
the required 101 parking spaces required per Article 18 of the City of Milton
Zoning Ordinance. It also appears that the site plan is in compliance with the
landscape and layout requirements of Article 12G.4. Section F. Staff
recommends that parking spaces along the eastern portion of the parking lot
be constructed of pervious materials.
OTHER CONSIDERATIONS
City Arborist Comments and Map:
The site is completely wooded with lots of undergrowth from center of site
towards the northern property line. An additional site visit was made to confirm
items on the preliminary plan. There are no specimen trees located on the
eastern portion of the property although there is heavy privet and smaller
caliper trees in this area. Moving clockwise on the map, starting at the south
end of the site, the following trees have been identified:
Tree #1is 50” caliper oak shown to be saved
Tree #2 is shown as 30” caliper, but is actually 25” in good condition, trying to
save (See DRB comment)
Tree #3 is 30” caliper Oak in good condition
Tree #4 is shown as 38” caliper, but is actually 27” caliper and dead
Tree #5 is 30” caliper Oak to be saved
Tree #6 is 30” caliper Oak to be saved
Tree #7 is 40” caliper Oak to be saved
Tree #8 is 42” caliper Oak to be saved
Tree #9 is 28” caliper Hickory to be saved
Tree #10 is 28” caliper Oak to be removed
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 14 of 23
U08-03
The site plan shows a 170 square foot storage shed with dumpster and satellite
dish near Bethany Bend Road. Staff recommends that this be moved away from
the road frontage and placed elsewhere on the site. Staff notes that the
building will match the church building. Pursuant to Article 12G.4.B.4 the
dumpster shall not be placed within 50 feet of an existing residential or AG-1
(Agricultural) property line.
The applicant is also proposing a 1,800 square foot pavilion on the activity field.
Staff notes that this will not have walls and will be designed to keep in character
with the site.
PUBLIC INVOLVEMENT
On April 23, 2008 the applicant was present at the Community Zoning
Information Meeting held at the Milton City Hall. There were approximately forty
people in attendance from the community. Common concerns of the
proposed development dealt with issues associated with traffic, drainage,
buffers, and scheduling of services. The community and the applicant have
had continuous discussions since the Community Zoning Information Meeting
regarding the development.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 15 of 23
U08-03
Public Comments – Staff has received emails and phone calls from the
community with various technical questions regarding the site plan.
City of Milton Design Review Board Meeting – May 6, 2008
The following recommendations were made by the DRB:
• The Board supports reducing the 40-foot landscape strip to 20 feet
to allow the applicant to move the septic tank back, and possibly
save 3 specimen trees (if healthy) (The City Arborist has determined
that one tree is dead and one is not a specimen tree.)
• Remove dumpster from Bethany Bend frontage.
• Possibly flip Scout Building with dumpster.
• Materials of dumpster, pavilion and modular wall shall match
building.
Public Notice Requirements
The use permit petition was advertised in the Milton Herald on May 14, 2008 and
the sign was installed before the required date of May 7, 2008 along the
frontages of Bethany Bend Road and Cogburn Road. The notice of a use
permit was sent to adjacent property owners on May 12, 2008. Based on the
requested deferral and withdrawal of both part 1 & 2 of the concurrent
variance, it was advertised in the Milton Herald on June 18, 2008. The sign was
installed before the required date of June 4, 2008 along the frontages of
Bethany Bend Road and Cogburn Road. The notice of a use permit was sent on
June 9, 2008.
Public Participation Plan and Report
The applicant has met the requirements of the Public Participation Plan. The
applicant will be required to submit the public participation report 7 days prior
to the Mayor and City Council meeting.
CONCLUSION
The proposed church is consistent with Council and Plan Policies and
compatible with the surrounding area, if developed in accordance with the
requirements of the Zoning Ordinance and Staff’s Recommended Conditions.
Based on the applicant’s request to withdraw the petition, Staff recommends
WITHDRWAL of U08-03.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 16 of 23
U08-03
RECOMMENDED CONDITIONS
If this petition is approved by the Mayor and City Council, it should be approved
USE PERMIT for a church (Article 19.4.10) CONDITIONAL subject to the owner’s
agreement to the following enumerated conditions. Where these conditions
conflict with the stipulations and offerings contained in the Letter of Intent, these
conditions shall supersede unless specifically stipulated by the Mayor and City
Council.
1) To the owner’s agreement to restrict the use of the subject property as
follows:
a) Church and accessory uses including the storage/dumpster shed at
a maximum density of 2,320.95 square feet of gross floor area per
acre zoned or a total gross floor area of 16,728 square feet,
whichever is less.
b) Pavilion not to exceed 1,800 square feet with no walls.
2) To the owner’s agreement to abide by the following:
a) To the revised site plan received by the Milton Community
Development Department on May 2, 2008. Said site plan is
conceptual only and must meet or exceed the requirements of the
Zoning Ordinance and these conditions prior to the approval of a
Land Disturbance Permit. Unless otherwise noted herein,
compliance with all conditions shall be in place prior to the
issuance of the first Certificate of Occupancy.
3) To the owner’s agreement to the following site development
considerations:
a) No more than one (1) exit/entrance on Bethany Bend Road and
ingress design on Cogburn Road. Curb cut locations and
alignments are subject to the approval of the Milton Traffic
Engineer.
b) Provide pervious materials for parking for the eastern most row of
parking adjacent to activity field.
c) All building entrances shall have a direct connection to the
sidewalk network.
d) The site plan must provide adequate fire truck access to all
buildings on site, in alleys and one-way conditions; as acceptable
to the Milton Public Works Director and Fire Marshal.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 17 of 23
U08-03
4) To the owner’s agreement to abide by the following requirements,
dedication and improvements:
a. Dedicate at no cost to the City of Milton prior to the approval of a
Land Disturbance Permit or Certificate of Occupancy (whichever
comes first), sufficient land as necessary to provide for compliance
with the Transportation Master Plan and the adjacent
developments, according to the definitions in the Right-of-Way
Ordinance or as approved by Milton Public Works Director.
i. Dedicate necessary Right-of-Way for future WB left turn lane
on Bethany Bend at Cogburn Road and provide all widening
on north side of Bethany Bend on subject site.
b. Dedicate at no cost to the City of Milton prior to the approval of a
Land Disturbance Permit or Certificate of Occupancy (whichever
comes first), sufficient land as necessary to provide the Right of Way
for the approved final site plan including the following:
i. Provide the following road improvements as approved by
Milton Public Works Director:
1. EB Left turn lane on Bethany Bend into site driveway
2. WB Right turn lane on Bethany Bend into site driveway
3. SB Left turn lane on Cogburn Road into site driveway
4. NB Right turn lane on Cogburn Road into site driveway
5. Provide overlay and striping for full width of Bethany
Bend and Cogburn Road the length of property lines
plus any additional taper lengths necessary or as
approved by Milton Public Works Director.
ii. Provide at least 16 feet of right-of-way from the back of
curb/edge of pavement of all abutting road improvements,
along the entire property frontage, as well as allow the
necessary construction easements while the rights-of-way are
being improved.
iii. Provide 10-foot wide concrete multi-use path along the entire
Bethany Bend frontage of the property located no more than
1 foot off the Right of Way line and no less than 5 feet behind
the back of curb or as approved by the Director of Public
Works.
iv. Provide 10-foot wide asphalt multi-use path along the entire
Cogburn Road frontage of the property located no more
than 1 foot off the Right of Way line and no less than 5 feet
behind the back of curb or as approved by the Director of
Public Works.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 18 of 23
U08-03
v. Provide a black 4-foot high four-board equestrian style fence
adjacent to the sidewalk/trail along entire length of Bethany
Bend Road and Cogburn Road or as approved by the
Director of Community Development.
c. Any new required entrances shall meet the Community Service
Policies and AASHTO guidelines, or roads be reconstructed to meet
such criteria, at the approval of the Milton Public Works Director.
i. The Cogburn Road driveway shall be a right/left in entrance
only driveway. This one lane section shall extend a minimum
of 100 feet of uninterrupted flow or as approved by the
Director of Public Works.
ii. The Bethany Bend driveway shall be a right/left in, right out,
left out driveway. This 3 lane section shall extend a minimum
of 40 feet or the 95% queue length of uninterrupted flow,
whichever is greater or as approved by the Director of Public
Works.
5) To the owner’s agreement to abide by the following:
a. The developer’s Professional Engineer shall demonstrate to the City
by engineering analysis submitted with the LDP application, that the
discharge rate and velocity of the storm water runoff resulting from
the development is restricted to seventy-five percent (75%) of the
pre-development conditions. Locations shall be as approved by the
Stormwater Engineer.
b. The water quality and detention facilities shall utilize earthen
embankments, where possible. Walled structures are not
encouraged. If walled structures are proposed, they must meet the
acceptable design standards of the Department of Community
Development.
i. Detention facility shall have a 6-foot high, five-board
equestrian style fence with two inch by four inch welded
wire constructed around it as approved by the Stormwater
Engineer.
c. The Developer shall utilize GASWCC limited application controls. All
water quality and detention facilities shall have vegetated surfaces
to be regularly maintained by the owner.
d. Provide a maximum 75 percent impervious, per drainage basin, at
maximum build-out.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 19 of 23
U08-03
e. Provide for maximum slopes of 3:1 and a maximum disturbed area
of sixteen acres open at any time as shown on the LDP phasing
plan, as approved by the Stormwater Engineer.
f. Provide detailed 10% downstream analysis including all existing
cross drain pipes and ditches. Provide any necessary improvements
to existing ditches and pipes as determined by the Milton’s
Stormwater Engineer prior to issuance of LDP.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 20 of 23
U08-03
APPENDIX A
Comments on Public Services and Utilities
Note: Various City and/or County departments that may or may not be
affected by the proposed development provide the following information.
Comments herein are based on the applicant’s conceptual site plan and are
intended as general non-binding information and in no manner suggest a final
finding by the commenter. All projects, if approved are required to complete
the City of Milton Plan Review process prior to the commencement of any
construction activity.
Transportation:
Trip Generation 232 Sunday Peak Hour
Per the ROW Ordinance Article 8 Section 3.2.d “All signalized and all-way stop
controlled intersections shall operate at Level of Service “D” or better. Other
signalized intersections (including unsignalized private accesses) shall operate at
LOS “E” or better for major left turns and Side Street approaches, although LOS
“F” may be allowed if the movement has a relatively low volume-to-capacity
ratio and there are no known safety problems at the intersection.”
Fulton County Health Department:
Comments:
• This department recommends that the applicant be required to connect
the proposed development to public water available to the site.
• Due to the inaccessibility of public sewer to serve the proposed
development, this department recommends that individual onsite
sewage management systems be utilized. However, the “Design Limits for
conventional or chamber Septic Tank Systems” for County Health
Department as defined by Georgia Department of Natural Resource
(DNR) are limited by size and subsurface introduction of effluents. Onsite
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 21 of 23
U08-03
sewage management systems having a septic tank capacity of greater
than ten thousand (10,000) gallons, or where the total length of absorption
trenches required, would exceed three thousand (3000) linear feet, or
where the total absorption trench bottom area required, would exceed
nine thousand (9000) square feet, will be governed and placed under the
statutory authority and jurisdiction of the Department of Natural
Resources.
• Due to the inaccessibility of public sanitary sewer to sewer the proposed
development, this department recommends that individual onsite
sewage management systems be utilized. However, this department will
require all necessary percolation and soil data, required layouts, and
supportive data be submitted for review and determined acceptable
prior to preliminary plat and/or Land Disturbance Permit (LDP) approval.
• Since this proposed development constitutes a premise where people
work, live, or congregate, onsite sanitary facilities will be mandatory, prior
to use or occupancy.
• Since this development utilizes an onsite sewage management system,
the owner must obtain approval from this department prior to issuance of
a building permit and before building construction or renovation.
• This facility must comply with the Fulton County Clean Indoor Air
Ordinance.
• If this proposed development includes a food service facility, the owner
must submit kitchen plans for review and approval by this department
before issuance of a building permit and beginning construction. The
owner must obtain a food service permit prior to opening.
• This department is requiring that all existing structures to be demolished
must be inspected by a certified pest control operator to insure that the
premise is rat free. If evidence of rodent infestation is found, the property
must be baited prior to demotion.
• If this proposed development includes an existing individual onsite
sewage management system(s), and the system(s) will be abandoned, it
shall be abandoned in accordance with Fulton County regulations.
• If this proposed development includes an existing individual onsite water
supply system(s), and the system(s) will be abandoned, it shall be
abandoned in accordance with Fulton County regulations.
Fulton County Tax Assessor:
Property taxes are paid in full through 2007.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 22 of 23
U08-03
Drainage:
Flood Plain: No Flood Plain
City of Milton Fire Marshal:
Comments:
• Increase of traffic in the immediate area of Bethany Bend and Cogburn
during hours of operation
• Water demands could also increase for this general area.
• Calls for service for EMS and Fire calls would also increase.
• The roadway may need to be expanded to help minimize the possible
congestion for the intersection.
City of Milton Pubic Safety:
The proposal will have a minimal impact on police services.
Prepared by the Community Development Department for the
Planning Commission Meeting on June 24, 2008
6/19/2008 Page 23 of 23
U08-03