HomeMy WebLinkAboutPacket - PC - 02-24-2009 City of Milton
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 C Milton, GA 30004
**Meeting Codes: CZIM-Community Zoning Information Meeting; DRB-Design Review Board;
PC-Planning Commission; MCC-Mayor and City Council
1
PLANNING COMMISSION AGENDA
Tuesday February 24, 2009, 7:00 pm
Agenda Item Description Meeting
Dates**
Staff
Recommendation
PC
Recommendation
I. INVOCATION
II. CALL TO ORDER
III. PLEDGE OF
ALLEGIANCE
IV. PUBLIC
COMMENT
V. APPROVAL OF
MINUTES
Minutes from the
December 18, 2008
Planning Commission
Meeting
APPROVAL
VI. NEW REZONINGS
U09-01/VC09-01 To obtain a use permit for
a landscaping business
on 1.74 acres at a density
of 3,908.04 square feet
per acre (Article 19.4.27).
Applicant is also
requesting 3-part
concurrent variance:
1) To delete the 50’
buffer and 10’
improvement setback
along the west property
line from the right-of-way
for a distance of 140’
(12H.3.1 Section C.1).
2) To delete the 50’
buffer and 10’
improvement setback
along the east property
line from the right-of-way
for a distance of 140’
(12H.3.1 Section C.1).
3) To allow a sign located
less than 10’ from the
right-of-way (Article 33
Section 21.C).
CZIM—
1/28/09,
DRB—
2/4/09,
PC—
2/24/09,
MCC—
3/16/09
DENIAL—U09-01
DENIAL—Part 1 of
VC09-01
DENIAL—Part 2 of
VC09-01
DENIAL—Part 3 of
VC09-01
VII. ADJOURN
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 1 of 17
U09-01/VC09-01
PETITION NUMBER(S):
U09-01
VC09-01
PROJECT NAME
The Landscape Group
PROPERTY INFORMATION
ADDRESS 13120 Arnold Mill Road
DISTRICT, LAND LOT 2/2, 1018
OVERLAY DISTRICT Northwest Fulton Overlay
EXISTING ZONING AG-1
ACRES 1.74
EXISTING USE Landscaping Business
PROPOSED USE Use Permit for Landscaping Business (Article 19.4.27)
OWNER Frank Schaffer
ADDRESS 13120 Arnold Mill Road
Milton, Georgia 30075
COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION
U09-01 – DENIAL
Part 1 of VC09-01 – DENIAL
Part 2 of VC09-01 – DENIAL
Part 3 of VC09-01 – DENIAL
INTENT
To obtain a use permit for a landscaping business on 1.74 acres at a density of
3,908.04 square feet per acre (Article 19.4.27). Applicant is also requesting 3-part
concurrent variance:
1) To delete the 50’ buffer and 10’ improvement setback along the west
property line from the right-of-way for a distance of 140’ (12H.3.1 Section C.1).
2) To delete the 50’ buffer and 10’ improvement setback along the east
property line from the right-of-way for a distance of 140’ (12H.3.1 Section C.1).
3) To allow a sign located less than 10’ from the right-of-way (Article 33 Section
21.C).
A.
~£CitYof Milton
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 2 of 17
U09-01/VC09-01
LOCATION MAP
'-"i.:.,s City of Milton
g,~M
UlJ9-000NC09-<lO'l
--S'lJ;eel.
--S'lJ;eilll1ilS
~~,-Site_ll109~O[]1o2007TalCDigest
E!5
...
_.........-...';<.~IA1J
----
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 3 of 17
U09-01/VC09-01
ZONING MAP
-
-;,''''\s City of M ilto n
~~
llCl.HlIH
.....
-street 0 R-2
-S1Jreoams 0 R-2A
IZLl SUbjecCSite_U09JJ01 _R-3o2O[l7 Tax:DigesI._R-3A
C]AG-1 _R-4
.~2 _R-4A
D~'1 _R-5
_0-1 _R-M
DM-1 _R-8oCUP_A
C]NUP _rn
1M _water
DR-1 DR-O-W
lakes
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 4 of 17
U09-01/VC09-01
SITE PLAN – January 8, 2009
'.:;>
-
ECEIV
JAN 8 2009
UUl -()I
Vt.-O((01
rJ4:
ifI
2.5'BLDG>SE'"r PAcK..J
.J
J
\l~.eA.'
(§
Ac,,-I
()
,'1
"
FF'::'lF\C:\:)\C ~~~I ,~:£'Z.r:""
:Ol.IFt/:N·USE;''::'':0 TO-'_51.\"'0.
":._~
,,~.,
:;II ....,"-ot-.
F I"t::f~PN ~I.NC
F-;::F-NCE :0 'l:R
:<.]<~:.FFtlCE
"',,,e
O::tIC
P.r.\'
~.
p.
~
lP
rAH-........SS
(;C
B
.1-".
A~-r .:t.,.
A~-L IiC~
SSE iT
De
rH
I'l..
p
SI.~lJ'!"'''r:,---....,
Vf:....,.
_.i,.I'.,I ""'~'I
...r I •~
I ••J ..it,to,I -
"..,...'...
'0.,"'.,.''..:..>•.,
It.map or pl~I 1,1":It!t'li 1.:1:I1"L11:I1tt1.I
far do!"e a,-od h.ru"nd It>h COoI"l:l C
W LJ,"<I'H'00:,n /ZI;S7C.fect.
, ,•••~.~1i5 Ie t.1 A'FI~:F!r.;\1 tt nnn IhU,\RC :~!(<<HIO(!(:ar;c 1~~
nol 3PPlIol(10 :)!Ir a"ana h ,'"a ~p!I:ul 'lied 31oS,
.~(rlOC 1~~)~W.llr."r.~~Pl.'1 ho'~.ll~••II~III":...···n n:'.'F..Of \It.l'~I.-=1-a~I"t.l'P:o 'A 1 ,"
IOCoHQh fj Tl1'lrr,r.1.I11:ftCc ~'C 1.1'";-4.~~~,VIW.\toR (.'IIf'Ff~ll';ll'::.00:(""'.1 I C~;I.l'"
S Q.(;Iif..··'r"U·R wnqa O4o\tL INf:.lftlAATO':.:-=J A IoIfA I )...·tt·~°J.hl';':1 "'',~IIJ "~-s r~"A:
WI(1'[(FP;';1 I~G ~~.~'R ....~R:;(,-y;pc;,~~~".~P:ft4 iiF
'Ht"PlArWA9 "RPARED l:l SHOW THE ~J'PAOXI"A-'E LOCAI\ONOF THf P~O~EMEHrs A
15 IIOT IIec:ll'lO"'LE FBICES SMOlA.D l """'CEO USING SlOE 01 H50 ·.11 H f
"LL ....n eRe OF WLE ANe XC""UD.'H'8 f>LAl.6 SU~LCT T;)ALL U:C"L t"_IEMErtre ..."1>
IO~F.W.TS."1J1II1 II':O.YAT£.
.....I..~I.....,...._T ,~...CC FECT AfPRFl;FN'U'ION O'THE lAHD "LATTEO .
•J/'../•
I (-..c f .,:.-,...-J
__"'::;=;--~-:-'~_"":"'''''''':''=-'-=-':'''''-...::'''''-~,"'..u--<_~:..c::.-="':::"~:::::""'=-_
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 5 of 17
U09-01/VC09-01
TOPOGRAPHY
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 6 of 17
U09-01/VC09-01
SOUTHEAST VIEW OF SITE
SOUTHWEST VIEW OF SITE
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 7 of 17
U09-01/VC09-01
MAIN OFFICE BUILDING ON SUBJECT SITE
SUBJECT SITE
The subject site is a 1.74 acre tract of agriculturally zoned land, located on the
southern side of Arnold Mill Road. The subject site is developed with an 800 sq.
ft. house which is used as an office and a 3,000 sq. ft. warehouse. It is located
within the Agricultural, Forestry and Mining Land Use designation on the Focus
Fulton 2025 Comprehensive Land Use Plan.
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 8 of 17
U09-01/VC09-01
SITE PLAN ANALYSIS
Based on the applicant’s site plan submitted to the Community Development
Department on January 8, 2009, Staff offers the following considerations:
Northwest Fulton Overlay District
BUILDING SETBACKS
Article 12H.3.5 Section C.2 of the Northwest Overlay District requires a maximum
30-feet building setback from the edge of the required landscape strip and/or
easements for all properties and lots located adjacent to public rights-of-way
and from 0 to 400 feet from an intersection. In Staff’s opinion, it appears that the
applicant has met this requirement. There are no additional structures proposed
on the site.
Article 5.1.3.C of the Milton Zoning Ordinance requires a minimum front yard of
60 feet, a minimum side yard of 25 feet, and a minimum rear yard of 50 feet.
Staff notes that if this petition is approved, the existing house which is used as an
office will be an approved non-conforming structure. Currently, the existing
house encroaches into the 25 feet setback on the western side of the property.
BUILDING HEIGHT
Article 12H.3.5 Section D.1 of the Northwest Fulton Overlay District requires a
maximum height limit of two stories with the maximum height 30 feet from
average-finished grade to the bottom of the roof eave. It appears that the
applicant meets this requirement.
LANDSCAPE STRIPS AND BUFFERS
Article 12H.3.1 Section A.1 states that all properties shall provide a minimum 10
foot-wide landscape strip along all public streets. It appears that the applicant
has met this requirement.
Furthermore, Article 12H.3.1 Section C.1 of the Northwest Overlay District requires
a fifty (50) foot-wide undisturbed buffer and a 10’ improvement setback which
shall be located adjacent to all AG-1 zoning districts and all property zoned,
used, or developed for residential uses. Staff notes that the applicant is
applying for two concurrent variances to delete the 50’ buffer and 10’
landscape strip on the east and west property lines. It is Staff’s opinion that the
site plan could be reconfigured in a manner to reduce the impact on required
landscape buffers. Therefore, Staff finds that the use as proposed on the site
plan is too intensive for the site and recommends Denial of Parts One and Two
VC09-01.
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 9 of 17
U09-01/VC09-01
The Public Works Department requires that the applicant relocate the property
entrance to the western side of the property. The relocation of this entrance
would allow for a portion of the concrete pad to be removed on the eastern
side of the property. If council desires to approve this use permit then staff
recommends that Part 1 of VC09-01 be approved along the west property line,
subject to the applicant removing portions of the concrete pad within the 50’
buffer and replanting the eastern side of the property to buffer standards.
PARKING REQUIREMENTS
The following chart illustrates the parking required by Article 18 of the City of
Milton Zoning Ordinance for the proposed use:
Proposed Use Minimum Requirement Spaces Provided
General Office
(800 sq. ft.)
Warehouse (3,000 sq. ft.)
Total
3 spaces per 1,000 sq. ft. of
building area (3 spaces)
1 space per 2,000 sq. ft. of
building area (2 spaces)
5 spaces required
6 spaces
6 spaces provided
Staff notes that the applicant is providing six (6) parking spaces, which meets
the required three (5) parking spaces required per Article 18 of the City of Milton
Zoning Ordinance. It also appears that the site plan is in compliance with the
landscape and layout requirements of Article 12H(2).4. Section B.6.
USE PERMIT CONSIDERATIONS
In the interest of the public health, safety and welfare, the Mayor and City
Council may exercise limited discretion in evaluating the site proposed for a use
that requires a Use Permit. In exercising such discretion pertaining to the subject
use, the Mayor and City Council shall consider each of the following as outlined
in Article 19.2.4 of the Zoning Ordinance; Use Permit Considerations. Staff has
reviewed said items pertaining to the subject use, and, offers the following
comments:
A. Whether the proposed use is consistent with the land use or economic
development plans adopted by the Mayor and City Council:
Provided the applicant complies with the Recommended Conditions of
this petition and the Use Permit requirements of Article 19.4.27 of the
Zoning Ordinance, the proposed development is consistent with the intent
and following policies of the Comprehensive Plan:
•
•
•
•
•
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 10 of 17
U09-01/VC09-01
Encourage development consistent with the surrounding scale,
transition of densities and uses, and Comprehensive Plan policies,
where appropriate.
B. Compatibility with land uses and zoning districts in the vicinity of the
property for which the use permit is proposed;
If developed in accordance with Staff’s Recommended Conditions and
the provisions of the Zoning Ordinance, the proposed landscape business
may be compatible with other land uses in the surrounding area. Staff
notes that on November 17, 2008, Milton City Council approved a use
permit for a landscaping business at 13365 Arnold Mill Road (U08-06).
Location Parcel /
Zoning
Petition
Zoning / Name Approved
Density/Min.
Heated Floor
Area
West 1 (AG-1) Agricultural
Undeveloped
1-2 u/a
Northwest 2 (AG-1) Agricultural
Single-family home
1-2 u/a
Northwest 3 (AG-1) Agricultural
Single-family home
1-2 u/a
North 4 (AG-1) Agricultural
Single-family home
1-2 u/a
Northeast 5 (AG-1 Agricultural
Undeveloped
1-2 u/a
Further East 6 (AG-1) Agricultural
Sweet Apple Animal Hospital
1-2 u/a
East 7 (AG-1) Agricultural
Single-family home
1-2 u/a
•
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 11 of 17
U09-01/VC09-01
.-"{:.,s City of Milton
g,~M
UlJ9-000NC09-<lO'l
--S'lJ;eel.
--S'lJ;eilll1ilS
~smjecl,-Site_ll109~mHo2007TalCDigest
E!5
...
......--.-~......'==s -==5:.'==-
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 12 of 17
U09-01/VC09-01
C. Whether the proposed use may violate local, state and/or federal statutes,
ordinances or regulations governing land development;
The proposed use violates the City of Milton Zoning Ordinance because of
inadequate buffers on the eastern and western property lines.
D. The effect of the proposed use on traffic flow, vehicular and pedestrian,
along adjoining streets;
The proposed use will not generate a significant increase in traffic, but
Staff recommends that only one entrance be utilized at the western side
of the property based on site distance requirements along Arnold Mill
Road.
E. The location and number of off-street parking spaces;
Article 18.2.1 requires the applicant to provide a minimum of 3 parking
spaces per 1,000 square feet of office space. Additionally, Article 18.2.1
requires the applicant to provide 1 parking space per 2,000 square feet of
warehouse space. Article 19.4.10 requires the applicant to locate parking
outside of the minimum 60-foot front yard building setback. The
applicant’s site plan indicates six parking spaces which meets the
requirements set out by Article 18.2.1 and is located outside the 60-foot
front yard building setback.
F. The amount and location of open space;
The applicant’s site plan indicates that approximately one half of the
subject site is undeveloped. Staff notes that this open space is located
behind the stream which bisects the property approximately in the
middle. Staff is of the opinion that the proposed development will provide
adequate open space on the south side of the property, but with the
requested deletion of both 50’ buffers along the east and west property
lines, there is not sufficient open space.
G. Protective screening;
If developed in accordance with the requirements of the Zoning
Ordinance and the Northwest Fulton Overlay Zone, the buffer and
landscape strip requirements and the existing screening around the
structures will provide adequate screening for the proposed
development. As proposed by the applicant, the front half of the
property where the structures and parking are located do not provide the
required buffers as discussed in site plan considerations. It is Staff’s opinion
that there is too much development on the front half of the property
based on the required buffers and is inconsistent with nearby uses.
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 13 of 17
U09-01/VC09-01
H. Hours and manner of operation;
The applicant states that the hours of operation are from 7:30am to
6:00pm. The business is a full landscape, maintenance, and design
company. Equipment consists of mowers, leaf blowers, edgers, and
trimmers, which are stored in boxed trucks. This business has two box
trucks for lawn maintenance, two landscape trucks, two midsize pick up
trucks for sales and service, one bobcat, and one box trailer.
I. Streetscape lighting;
At the time of Land Disturbance Permit the site shall be in compliance with
Article 12H.3.4 of the Northwest Fulton Overlay District regarding outdoor
lighting. Staff notes that the subject site’s required buffers, and existing
screening, will help mitigate the impact of any possible lights on the
adjacent properties. Staff notes that the applicant does not have any
plans for additional lighting on the property.
J. Ingress and egress to the property.
The applicant’s site plan indicates one curb cut on Arnold Mill Road. Staff
notes that there are two existing entrances to the property. The applicant
proposes to close one of these entrances due to the high volume of traffic
on Arnold Mill Road. Staff will require that the entrance on the east be
closed to provide ingress and egress on the most western portion of the
property.
SIGNAGE
Article 33 Section 21.C of the Milton Zoning Ordinance states, “Unless a more
restrictive setback is specified in conditions of zoning or otherwise in this Article,
all signs shall set back the greater of 10 feet from the right-of-way or 20 feet from
the edge of pavement if a private street and no sign shall project over the right-
of-way.” The applicant states that office and driveway placement along with
topography issues justify the sign variance request. Staff recommends DENIAL of
Part Three of VC09-01 due to the denial of the use permit.
ARBORIST
Site appears too small to meet the buffers required by zoning. Vegetation within
the western buffer was removed prior to submission as well as vegetation within
the 75’ non-impervious setback. Eastern portion of property was previously void
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 14 of 17
U09-01/VC09-01
of trees and is being used for parking and storage. Area of disturbance around
specimen pine tree appears to have been done so previously. Arborist does not
support the deletion of the buffers which would very much limit the uses of this
site.
PUBLIC INVOLVEMENT
On January 28, 2009 the applicant was present at the Community Zoning
Information Meeting held at the Milton City Hall. There was one person at the
meeting.
Public Comments – Staff has received no phone calls or e-mails regarding this
request.
City of Milton Design Review Board Meeting – February 4, 2009
Front, and all side landscape strips shall be heavily planted with a mix of
evergreens, per the approval of the City of Arborist,
The privacy fence shall be screened,
Any fence visible from Arnold Mill Rd should be decorative (with brick or
stone columns.
Public Participation Plan and Report
The applicant has met the requirements of the Public Participation Plan. The
applicant will be required to submit the public participation report 7 business
days prior to the Planning Commission meeting and an update 7 business days
prior to the Mayor and City Council meeting.
•
•
•
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 15 of 17
U09-01/VC09-01
SPECIMEN TREE LOCATION MAP
---------.."
"LEGENO"'
RON"'!»
RON'Itl
=ENO:O
rri jC=
"'000
00'JCIl
Rlror-OI
;'Rr.
RI«lIU5
~
.~_~r
S£R\IIO:
L.At.'PPO
IAMl
So'.Nr.M
Cl<TC~e
JUNellO
ooJP o,
HS/ID ,",'
CCoaIl.'Jl
~I:JN"f"Al
SANITAA
ORi\~'.
AFU'[
p~CI'e;'
POR--
~a.nt>Y.
IPS
01'
rc
):-)l.-X-
"',••'0
CCN"
RiW
i\
It
c
PP
F
l!
IH
~
CD
.B
DI
1"1/0
Cl,~
A~-l ~
O~
H
F1..
P
_9~
iJo(,/-Ol /
V~oC1-ol
RECEIVED
JAN 08 l009
CIIY oC MIIlXln
C<Jmm~1ty DIMlllpnenI
J~.
A G.-I
H ::~~~o~.s '.'~
Pc·fiNe-~
-,,'-:;:',',"'-....:,...-
:....-."....~':,
,.:.,..=-..)~,....•v~.--Jll__~...."!""'....._.:...~......_-~..:-:~=~._--~).,'.,.',,~L,.y "~",;d
"..,,~,:,.:J...;'_.,"-I~•••••••1,(
(._,...."-on/
I \d""",."'---"
~.'.
A(,-I
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 16 of 17
U09-01/VC09-01
CONCLUSION
Staff finds that the proposed landscape business use might be compatible with
other uses in the surrounding area if all the buffer standards were met. However,
it is Staff’s opinion that the site plan could be reconfigured in a manner to
reduce the impact on required landscape buffers. Therefore, Staff finds that the
use as proposed on the site plan is too intensive for the site and recommends
DENIAL of U09-01 and DENIAL of Parts 1-3 of VC09-01.
The Public Works Department requires that the applicant relocate the property
entrance to the western side of the property. The relocation of this entrance
would allow for a portion of the concrete pad to be removed on the eastern
side of the property. If council desires to approve this use permit then staff
recommends that Part 1 of VC09-01 be approved along the west property line,
subject to the applicant removing portions of the concrete pad within the 50’
buffer and replanting the eastern side of the property to buffer standards.
Prepared by the Community Development Department for the
Planning Commission Meeting on February 24, 2009
2/19/2009 Page 17 of 17
U09-01/VC09-01
RECOMMENDED CONDITIONS
If this petition is approved by the Mayor and City Council, it should be approved
USE PERMIT for a landscape business (Article 19.4.27.) CONDITIONAL subject to
the owner’s agreement to the following enumerated conditions. Where these
conditions conflict with the stipulations and offerings contained in the Letter of
Intent, these conditions shall supersede unless specifically stipulated by the
Mayor and City Council.
1) To the owner’s agreement to restrict the use of the subject property as
follows:
a) Landscape business within the existing house and warehouse at a
density of 2,246 square feet per acre or 3908.04 square feet which
ever is less.
2) To the owner’s agreement to abide by the following:
b) To the site plan received by the Milton Community Development
Department on January 8, 2009. Said site plan is conceptual only
and must meet or exceed the requirements of the Zoning
Ordinance and these conditions prior to the approval of a Land
Disturbance Permit. Unless otherwise noted herein, compliance
with all conditions shall be in place prior to the issuance of the first
Certificate of Occupancy.
3) To the owner’s agreement to abide by the following requirements,
dedication and improvements:
a) Provide any turn lanes as may be required by GDOT.
b) Provide only one driveway location at the northwest end of the
property based upon best sight distance as approved by the
Director of Public Works and GDOT.
i. Entrance shall meet the Community Service Policies and
AASHTO guidelines, or be reconstructed to meet such
criteria, at the approval of the Transportation Engineer for
Milton and GDOT.
c) Close additional driveway and remove concrete within the Right of
Way located at the southeast end of the property.