HomeMy WebLinkAboutAgenda - PC - 10-26-2010 City of Milton
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 C Milton, GA 30004
1
PLANNING COMMISSION AGENDA
Tuesday, October 26, 2010, 7:00 pm
1. Invocation
2. Pledge of Allegiance
3. Call to Order
4. Public Comment
5. Approval of Action Minutes – September 28, 2010 Planning Commission Meeting
6. RZ10-05/U10-01/VC10-03 – By Alpharetta Land Partners, Deerfield Parkway along the
west side for a distance of approximately 1,048 feet (12.87 acres) to rezone from C-1
(Community Business) and O-I (Office-Institutional) to C-1 (Community Business) with a
Use Permit to construct a Special School for a transitions vocational school for students
shall be adults at least eighteen years old in age with autism and an assisted living facility
for autistic adults with 72 studios. The applicant is also requesting a concurrent variance
to:
1) Allow the exterior wall materials of all non-residential buildings and townhouse,
duplex and multifamily buildings to consist of a minimum of 65 percent in lieu of
75 percent (per vertical wall plane) of the following: brick or natural stone
[Section 64-1095(p)] for the assisted living facility;
2) Allow accent building materials for all non-residential buildings and also
townhouse, duplex and multifamily units to be limited to a maximum of 35
percent in lieu of 25 percent brick, tile, non-reflective glass, natural stone and
weathered, polished or fluted face, with fluted, split-face, broken face finish,
Portland cement plaster and lath systems, architectural (either precast or tilt-up)
concrete (fluted or with exposed finish) or Hardi-Plank [Section 64-1095(q)] for
the assisted living facility;
3) Allow the following exterior siding colors as produced by Cabot Solid
stains to be permitted: Napa Vine, Newport Blue, Brickstone, Colonial
Yellow, [Section 64-1095(t)] for the assisted living facility.
7. U10-02/VC10-04 – By The Landscape Group, Frank Schaffer, 13120 Arnold Mill Road to
request a Use Permit for a Landscaping Business (Sec 64-1820) and a 4-part concurrent
variance in the existing buildings consisting of an 800 square foot office and 6,600 square
foot warehouse for a total of 7,400 square feet at an overall density of 4,327 square feet
per acre:
1) To reduce a portion of the 50-foot buffer and 10-foot improvement setback to 0
feet beginning at a point on the west property line at the northwestern property
corner for a total distance of 126 feet to a point on the west property line located
126 feet south of the northwestern property corner (Sec 64-1141.3.a),
2) To reduce a portion of the 50-foot buffer and 10-foot improvement setback be
reduced to a 30-foot undisturbed buffer with a 10-foot improvement setback for a
City of Milton
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 C Milton, GA 30004
2
total distance of 98 feet to a point on the east property line located 138 feet south
of the northeastern property corner (Section 64-1141.3.a).
3) To reduce the the 50-foot building setback to a 44.09-foot setback for the
warehouse along the east property line (Sec 64-1820(b)3),
4) To reduce the 50-foot building setback to a 47.58-foot setback for the warehouse
and a 28.25-foot setback for the steps to the office deck along the west property
line (Sec 74-1820(b)3).
8. RZ10-06 - Text Amendment to Section 64-1820 - Use Permit for Landscaping, business,
plant nursery or garden center with indoor retail component.
9. Old Business – 1) Update on Mayor and City Council Actions
10. Adjourn