HomeMy WebLinkAboutAgenda Packet - DRB - 08/03/2021
AGENDA
DESIGN REVIEW BOARD MEETING
Council Chambers
August 3, 2021
6:00pm
1) Call to order / Pledge of allegiance.
2) Introduction of Board Members
3) Approval of Agenda
4) Approval of July meeting minutes
5) Demos
a. 170 Dorris Road Milton, GA 30004
Request(s):
Demolition of existing residence.
b. 14013 Tree Loft Road
Request(s):
Demolition of existing residence due to total loss fire.
c. 3320-3370 Long street Road
Request(s):
Demolition of existing home sites, one home located at 3320 and one
home and garage at 3370.
(The subdivision plat is in the review for this development)
6) Courtesy Reviews
a. V21-16, 14635 Birmingham Highway
Request(s):
• To allow the opaque fence along the exterior street to remain as
built (Section 64-417(a)(4)).
• To allow the fence to be higher than allowed 5 feet height
(Section 64-417 (a)(2)).
b. V21-17, 13902 Tree Loft Road
Request(s):
• To allow the opaque fence along the exterior street to remain as
built (Section 64-417(a)(4)).
• To allow the fence to be higher than allowed 5 feet height
(Section 64-417 (a)(2)).
c. V21-18, 13912 Tree Loft Road
Request(s):
• To allow the opaque fence along the exterior street to remain as
built (Section 64-417(a)(4)).
• To allow the fence to be higher than allowed 5 feet height
(Section 64-417 (a)(2)).
7) Final reviews
8) New Business
a. Announcement that City offers stipend to the board members for
attending DRB meetings. Sign up with HR to start receiving payment.
9) Old business
a. 12595 Crabapple Road: Renovation of 1920’s house into beer and wine
market. Adding KEG cooler to the building that was previously approved
by DRB in May 2021.
10) Adjournment
ACTION REPORT
DESIGN REVIEW BOARD MEETING
Council Chambers
July 6, 2021
6:00pm
1) Call to order / Pledge of allegiance.
Members Present: Laura Wysong, Charlie Roberts, Beniquez Palmer, Jeff Dufresne.
Absent: Reid Casey, Lee Collins
2) Introduction of Board Members
3) Approval of Agenda
Motion to Approve the Agenda: Jeff Dufresne
2nd: Charlie Roberts
Vote: 4-0 (Approved)
4) Approval of June meeting minutes
Motion to Approved the meeting minutes: Charlie Roberts
2nd: Jeff Dufresne
Vote: 4-0 (Approved)
5) Demos
a. 14260 Phillips Circle
Request(s):
Demolition of existing residence, shed, and chicken house.
Motion to Approve: Charlie Roberts
2nd: Jeff Dufresne
Vote: 4-0 (Approved)
6) Courtesy Reviews
a. V21-11, 14779 Wood Road
Request(s):
To allow an accessory structure housing animals to be located less than 100 feet from
the property line. (Sec. 64-415, (a) (4) a.)
Comments:
The DRB recommends approval of the variance.
The DRB recommends getting support letters from neighbors.
b. V21-13, 2255 Dinsmore Road
Request(s):
• To reduce the front yard setback from 60 feet to 23 feet for an existing
house. (Sec. 64-416 (b))
• To reduce the side yard setback (west property line) from25 feet to 17 feet
for the existing house. (Sec. 64-416 (c)(1))
Comments:
The DRB recommends approval of the variances.
c. V21-14, 2275 Dinsmore Road
Request(s):
To reduce the front yard setback from 60 feet to 45 feet for an existing house
(Sec. 64-416 (b)).
Comments:
The DRB recommends approval of the variance.
d. V21-15, 2540 Hopewell Road
Request(s):
• To reduce the setback of building housing animals, from 100 feet to 35
feet along east property line. (Sec. 64-415 (a)(9))
• To reduce the setback of the existing fence (pen/ run), from 200 feet
to 10 feet along east property line. (Sec. 64-415 (a) (9))
• To allow the existing gazebo to remain as shown on the site plan
received by the Community Development Department May 24,2021.
(Sec. 64-1142 (b) (4))
Comments:
The DRB recommends approval of variance for the existing building and existing
fence.
The DRB recommends the removal of gazebo that was built without a permit.
7) Final reviews
a. Townhomes of Lakeside at Crabapple building 3-6.
Building design review
Motion to Approve without angel brackets on porches of building #3: Charlie
Roberts
2nd: Beniquez Palmer
Vote: 4-0 (Approved)
b. 13000 Deerfield Parkway building rebranding.
Paint, fence, and monument sign review
Motion to Approve the proposed monument sign and the fence and defer the
color scheme for next month: Charlie Roberts.
2nd: Beniquez Palmer
Vote: 4-0 (Approved)
8) Old business
a. None
9) Adjournment
H(WEDF'i-i:.
.r1,-,-Pv .
M I
LTC) Nl�
f i.I.A f•1 I!f iI'f7 ?(r•I.,
MEETING DATE: 1 U( -
DESIGN REVIEW BOARD APPLICATION
a r 0i
TYPE OF REVIEW: FINAL COURTESY CASE #
PROJECT INFORMATION_
PROJECT NAME:
PROJECT ADDRESS: /YO/3 rro
OVERLAY/FORM BASED CODE:
HAS LDP/BUILDING PERMIT BEEN SUBMITTED FOR REVIEW? YES
PROJECT TYPE (CHECK ONE): SITE/LANDSCAPE
BUILDING
SALES TRAILER
DEMOLITION_
ZONING/USE PERMIT/VARIANCE
OTHER (EXPLAIN)
• --
AGENDA #:
PROJECT DESCRIPTION: _ �tr+'1Q L� ��o o �I S r �,vtfa
+0f.` los" 4;rc .
APPLICANT/REPRESENTATIVE INFORMATION
CONTACT PERSON NAME: WletAL/ 1y\4 all
COMPANY: �SDy�nee, $ ts�orc- ip�l iOfmc�
ADDRESS: 110 V� u k- `n roo-- 6A 30115-
PHONE:
//SPHONE: 270— ao- 101 1 FAX:
EMAIL: t./N►c1 c, It a Sfla t-.f-^ts4- rei �o � r'on . eo±3
y
APPLICANT'S SIGNATURE: To the best of my knowledge, this application is correct and
complete. I understand that 1, or y epresentative should be in attendance at the Design
Review Board meeting on 1-1/41 1 at 6:00pm, to present this project. To the
best of my knowledge, f have met all applicable Overlay/Form Based Code conditions (Hwy
9/Deerfield, Birmingham, Crabapple, Rural Milton.)
Applicant:_,_ ,� Date l
DESIGN REVIEW BOARD SUBMITTAL REQUIREMENTS
Please see the list below for materials required according to the type of review. All site plans and building plans
shall be drawn to scale. Mounted drawings and sample boards showing materials, colors, etc. may be brought
to the meeting for your presentation. Please fold all large drawings down to 8'/2" by 11 " size, and collate all
materials. 11 xl7 'booklets' are acceptable as well. Incomplete submittals will not be accepted for review.
If you have any questions, please contact Shubha Jangam at 678 242 2539.
SITE PLAN/LANDSCAPE PLAN REVIEW -9 sets
Construction drawings, as required for LDP, including, but not limited to:
❑ Site location map(atlas map)
❑ Aerial map (Google)
❑ Acreage, density, adjacent zonings
❑ Zoning conditions (if any)
❑ Building footprint, square footage
❑ Grading, storm water plan, detention/retention areas
❑ Location of streams, stream buffers
❑ Roadways, parking areas, driveways, sidewalks, bike paths, pedestrian paths
❑ Dumpster enclosure detain/ location
❑ Landscape plan showing location, size and type of specimen and recompense trees, as well as other plantings
❑ Site lighting with photometric drawings, lighting fixture details
❑ Retaining wall(s) location and material details
❑ Fencing location and detail(s)
❑ Bike rack location and detail
❑ Mail kiosk location and detail (If applicable)
BUILDING REVIEW -9 sets
❑ Site location map(atlas map)
❑ Aerial map (Google)
❑ Site plan
❑ Colored renderings of all facades
❑ Line drawings of all elevations with heights, and materials Tabled
❑ Locations of roof top equipment, satellite dishes, antennas,vents,exhausts (as applicable)
❑ Site line study showing that rooftop units are not visible from adjoining roads (if applicable)
❑ Location, details of lighting fixtures
❑ Dumpster enclosure details (If applicable)
❑ Mail kiosk details (If applicable)
❑ Sample board showing materials, colors, etc. (Bring to the meeting)
SALES TRAILER -9 sets
❑ Site location map(atlas map)
❑ Aerial map (Google)
❑ Site plan showing location of sales trailer, setbacks, parking, etc.
❑ Landscape plan
❑ Picture and/or construction details of trailer
DEMO ITION REVIEW -9 sets
>1 Site location map(atlas map)
Aerial map (Google)
Site plan, indicating structure(s) to be demolished and the location of specimen trees, erosion control, tree save
fencing
Pictures of structure(s) to be demolished
VARIANCE/USE PEMIT/REZONING-9 sets
❑ Site location map(atlas map)
❑ Aerial map (Google)
❑ Acreage, density, existing site conditions
❑ Conceptual site plan showing location of buildings, detention areas, streams/stream buffers, specimen trees, roads,
parking, driveways, sidewalks, etc.
❑ For commercial/multifamily/townhome uses: conceptual renderings of buildings, square footages
❑ For sign variance: site line study showing view of signs from adjacent roads
❑ For stream buffer variance: mitigation plan
14013 Tree Loft Road
DEMOLITION REVIEW
Design Review Board Application
Proposed by: Southeast Restoration
vtn
SOUTHEAST
R E S T 0 R A T I O N
E
p
Adif.
0
0
t
6(s
e
. J-1
... . . . . . . . . . . . . . . . . . . . . . . . . . . ...
p
Adif.
0
0
t
0161 M
0
*10 Rwok] firK9
1-
iW7AIL
�4
At -
p
r.
+
AO -i
p
r.
+
AO -i
Pictures ot Frope
�� `{. ` :'y • ^�. r it .fi .N�l
t� .fir -, :3 �'��'f;�'�4�' �,; •K-• "� �•'� �, '�.,•� •`
:►�` 7� � � l: ��r' :lir` . - - '.�,,
• � _�.: � �..f�ry 4. � • � ,..•. � _' lam], •-
- � � - � •+awl,' ' r T -fir � _ � Y� A • , r `91�'r a
4
ilk _
- � �,+�. ;,t.�om:- �� �• �-_ � - _
A E
a► I yr �•, � . r
General
Alarm Time
06:26:13
Enroute
06:28:08
Arrival
06:36:07
Last Unit Cleared
17:47:14
Time Controlled
With PatientEMS Dispatch EMS Enroute EMS ArrivalEMS Unit
Zip Code
30004
Number/Milepost
14013
Apt./Suit/Room
Property ID
14013 Tree Loft Rd Milton
District/Box
MF42
Times
Location Type
1 - Street address
State
GA - Georgia
Exposure
0
Incident #
180006235
Incident Date
05/12/21
FDID
06014
State
GA 21-01210
CAD #
111 Building fire
Incident Type
111
Crossing street
Station
Station 41
Shift
C
Street or Highway
Tree Loft Rd
City
Milton
Milton and Alpharetta fire apparatus were dispatched to a structure fire with information that all occupants were
out of the home and noted visual fire and smoke coming from the garage portion of the home. While en route
additional information from an on-scene Milton Police Department (MPD) confirmed there was a structure
involved in fire reporting fully engulfed in flames". Battalion 4 (B4) asked dispatch for a senior staff notification in
order to receive help and coverage from senior staff on backfilling stations and responding to the incident for
support roles. B4 and Rescue 42 (R42) arrived simultaneously on scene as first units. R42 gave the initial size up
over the radio, then B4 finished the size up assuming command (IC) and announced a 360 walk around as well
as predetermining placement of incoming fire apparatus so that firefighting operations could begin in an effort to
extinguish the fire. The 360 was competed from left to right. Viewing the home from the street, Front side will be
referred to as Alpha (A), Left side will be referred to as Bravo (B), back side will be referred to as Charlie (C), and
right side will be referred to as Delta (D). Heavy smoke and fire was noted upon arrival to the AB corner of the
home, extending a good ways down the A and B sides of the structure as well as the the roof area. There was a
large amount of fire involvement impinging quickly on the other areas of the home including the attic area. The
initial mode of fire operations was determined to be "defensive", this was announced over the radio to all units
responding or already on scene. From all sides of the home during the 360, hazards and conditions were
announced. Utilities were located on the CD corner. Thick, moderate turbulent smoke was found coming from
the eaves of the structure at the roofline. There was also some conditions in the home on the main floor and
second floor. B4 arriving back to the A side assisted 2 personnel from Engine 85 (E85) with 2 handlines
Narrative
Number/Milepost
Event / Call Time
06:25:14
Emergency
Emergency /
Non Emergency
Address
Incident Type Plus One Automatic aid receivedAid Given or Received:
Incident Action
81 81 Incident command
11 11 Extinguishment by fire service personn
12 12 Salvage & overhaul
Page 1 of 16
stretched to the AB corner. The order was given to attempt a blitz attack, softening the fire with extinguishment
efforts from the exterior before attempting an interior fire attack. An additional preconnected attack line was
deployed from E85 and stretched to the front door and crews began the initial interior attack. For accountability of
personnel, B4 announced a mobile command on the Alpha side of the structure and kept a visual of fire crews
operating. B4 advised an offensive attack through the A side front door would be made to try and cut the fire off
from extending into the rest of the home. Due to access and fire conditions reported from interior crews, B 4
decided to go "defensive mode" once again and redirect lines. B4 was updated faced to face from the interior
attack officer that he made it to the seat of the fire on the main level with high heat and not much visibility. The
attack team was advised to attempt entry again to see if access to the roofline from the second story was
possible to cut off the fire. Another quick "offensive mode" attack was made again without success and at this
point until complete extinguishment, the mode of operation was "defensive". A 2nd alarm was struck, and Incident
command roles were assigned to all units on scene and additional responding units throughout the remainder of
the scene. B4 kept the command role as "Incident Commander" (IC) , relocating to the battalion vehicle where
equipment and focus could be used to run the fire scene and keep accountability of personnel intact. An
"Operations" role was assigned to assist with span of control. This continued until the last units were released
from the scene. All unit narratives will outline some of the actions and command assignments that were given.
The utilities companies from electrical and gas providers arrived on scene and secured utilities to the structure.
1-800 BOARDUP was called to the scene as well to assist the homeowner with securing the home and taking
possession of the structure once firefighting operations and fire investigative operations were completed. From
extinguishment of the fire until the following morning, a fire watch" continued every 2 hours to ensure that no
hazards or fire were noted.
Alpharetta Fire Department provided Battalion 8, Engines 81, 82, and 85, Truck 83 and the rehab unit.
AMR provided a dedicated ambulance to the scene in case of injury
Milton and Alpharetta provided police units for traffic control
Milton Public works provided support with heavy equipment for the fire investigation
5/14/2021 12:59 PM, Danny Elliott
Page 2 of 16
Area of Fire Origin
47 Vehicle storage area; garage, carport
Heat Source
13 Electrical arcing
81
Item First Ignition
Electrical wire, cable insulation
Type of Material First Ignited
UU Undetermined
Ignition
881 Model vehicles.
Brand
Jaguar
Model
XF
Serial Number Year
2013
Equipment Power Source
31 Gasoline
Equipment Involved
Total of Buildings Involved 1 Total Acres Burned Less Than One Acre Burned
Age
If Age is a Factor
On Site Material
Human Factors Gender
Fire
MakeProperty Type
StateModelYearLicense Plate VIN
Involvement Type
GA - Georgia
11 Automobile, passenger car, ambulance, race c JE - Jeep
Wrangler 2017 RHJ791B 1C4BJWDG6HL665155
1 - Not involved in ig
Mobile Property Involved
Factor Contributing To Ignition Human Factors Contributing To Ignition
Suppression Factors
Cause of Ignition
2 - Unintentional
Equipment Portability
1 - Portable
34 Unspecified short-circuit arc N - None
Page 3 of 16
Structure Fire
Length Width Square Feet
6827
Floor of Origin
1ORX
Main Floor Size
Stories Above Grade
2
Stories Below Grade
1
Minor
0
Significant
0
Extreme
0
Heavy
3
Stories Flame Damage Building Height
Detector Presence
1 - Present
Detector Type
1 - Smoke
Detector Power Supply
4 - Hardwire with battery backu
Detector Operation
2 - Detector operated
Detector Effectiveness
1 - Detector alerted occupants -
Detector Failure Reason
AES Presence
N - None Present
AES Type AES Operation
AES Failure Reason Number Of Sprinklers
Structure Type
1 - Enclosed building
Structure Status
2 - In normal use
Fire Spread
4 - Confined to building of origin
Arson
Container Ignition/Delay Device
UU - Unknown
Fuel
11- Ordinary combustibles
Property Ownership
1 - Private
Case Status
2 - Investigation closed
Availability Of Material First Ignited
2 - Available at scene
Extentof Fire Involvement on Arrival
4 - Fire through roof
Entry Method
11 - Door – open or unlocked
General Information
Incendiary Device
Suspected Motivation Factors Apparent Group Involvement
Other Information
Initial Observations Laboratories Used
Other Investigative Information
Junvenile Information
Page 4 of 16
Property
Number of Residential Units:1
Property $1,713,000.00
Contents $857,000.00
Property $1,713,000.00
Contents $857,000.00
Property Use
419 419 1 or 2 family dwelling
Mixed Property Use
HazMat Release
Detector Status
1 - Detector alerted occupants
Estimated Dollar Value and Losses
PRE-INCIDENT VALUES
LOSSES
Property Use / HazMat / Detector Status
(If no loss, leave blank)
Is Residential
Mutual Aid
05/12/21 14:05:0905/12/21 11:52:1205/12/21 06:51:46
Custom Department Identifier Mutual Aid Purpose
State
GA
Agency Incident #
Agency Information
FDID
6003
Aid
Fire Apparatus Provided 5
Fire Personnel Provided 15
EMS Apparatus Provided 0
EMS Personnel Provided 0
Rescue Apparatus Provided 0
Rescue Personnel Provided 0
Other Apparatus Provided 1
Other Personnel Provided 3
Fire Department
0
Notify Date/Time Cancel Date/Time Arrival Date/Time Cleared Date/Time
Page 5 of 16
Response
17:43:0908:20:5108:18:4008:18:38
Apparatus Narrative
Deputy Chief Stepehns responded to working structure fire. Assisted on
scene personel and worked with command.
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
1
# of Personnel
402
CAD App ID
Personnel Arrival Time Clear Time Actions Taken
08:20:51 17:43:09 00 - Action taMark Stephens
17:43:1607:05:4607:05:4407:05:43 07:05:43
Apparatus Narrative
On 5-12-21 at approximately 0630 hours I responded to the structure fire
from home, arriving after suppression operations were all under way. Upon
arrival, I supported command, first assigned to the D side of the structure and
then as the Safety Officer. Following suppression operations, I assisted the
Fire Marshal and Captain Gomez with the investigation. Upon conclusion of
the on-scene investigation, I helped with overhaul and supporting the family
in removing salvageable personal effects. I cleared at around 1730 hours.
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
1
# of Personnel
404
CAD App ID
M404
Actions for Apparatus
81 81 - Incident command
Personnel Arrival Time Clear Time Actions Taken
07:05:46 17:43:16 81 - Incident Matthew Marietta
14:20:3507:00:2506:53:0306:46:36 06:46:36
Apparatus Narrative
E44 arrived on the scene after a 2nd alarm. E44 was assigned water supply
and deployed RAN monitor to C side of structure. Crews rotated through
extinguishment and overhaul. Personnel entered the structure to search for
family items. Personnel loaded hose and returned to service.
5/12/2021 10:50 PM, Clay Barnette
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
3
# of Personnel
E44
CAD App ID
E44
Actions for Apparatus
11 11 - Extinguishment by fire service perso
73 73 - Provide manpower
74 74 - Provide apparatus
Personnel Arrival Time Clear Time Actions Taken
07:00:25 14:20:35 11 - Extinguis 74 - Provide a 73 - Provide Clay Barnette
07:00:25 14:20:35 11 - Extinguis 74 - Provide a 73 - Provide Scot Richardson
07:00:25 14:20:35 11 - Extinguis 74 - Provide a 73 - Provide Augustino Mascioli
Page 6 of 16
17:42:0406:37:0206:28:0806:26:13 06:26:13
Apparatus Narrative
Milton and Alpharetta fire apparatus were dispatched to a structure fire with
information that all occupants were out of the home and noted visual fire and
smoke coming from the garage portion of the home. While en route
additional information from an on-scene Milton Police Department (MPD)
confirmed there was a structure involved in fire reporting fully engulfed in
flames". Battalion 4 (B4) asked dispatch for a senior staff notification in order
to receive help and coverage from senior staff on backfilling stations and
responding to the incident for support roles. B4 and Rescue 42 (R42) arrived
simultaneously on scene as first units. R42 gave the initial size up over the
radio, then B4 finished the size up assuming command (IC) and announced a
360 walk around as well as predetermining placement of incoming fire
apparatus so that firefighting operations could begin in an effort to extinguish
the fire. The 360 was competed from left to right. Viewing the home from the
street, Front side will be referred to as Alpha (A), Left side will be referred to
as Bravo (B), back side will be referred to as Charlie (C), and right side will
be referred to as Delta (D). Heavy smoke and fire was noted upon arrival to
the AB corner of the home, extending a good ways down the A and B sides
of the structure as well as the the roof area. There was a large amount of fire
involvement impinging quickly on the other areas of the home including the
attic area. The initial mode of fire operations was determined to be
"defensive", this was announced over the radio to all units responding or
already on scene. From all sides of the home during the 360, hazards and
conditions were announced. Utilities were located on the CD corner. Thick,
moderate turbulent smoke was found coming from the eaves of the structure
at the roofline. There was also some conditions in the home on the main floor
and second floor. B4 arriving back to the A side assisted 2 personnel from
Engine 85 (E85) with 2 handlines stretched to the AB corner. The order was
given to attempt a blitz attack, softening the fire with extinguishment efforts
from the exterior before attempting an interior fire attack. An additional
preconnected attack line was deployed from E85 and stretched to the front
door and crews began the initial interior attack. For accountability of
personnel, B4 announced a mobile command on the Alpha side of the
structure and kept a visual of fire crews operating. B4 advised an offensive
attack through the A side front door would be made to try and cut the fire off
from extending into the rest of the home. Due to access and fire conditions
reported from interior crews, B4 decided to go "defensive mode" once again
and redirect lines. B4 was updated faced to face from the interior attack
officer that he made it to the seat of the fire on the main level with high heat
and not much visibility. The attack team was advised to attempt entry again
to see if access to the roofline from the second story was possible to cut off
the fire. Another quick "offensive mode" attack was made again without
success and at this point until complete extinguishment, the mode of
operation was "defensive". A 2nd alarm was struck, and Incident command
roles were assigned to all units on scene and additional responding units
throughout the remainder of the scene. B4 kept the command role as
"Incident Commander" (IC) , relocating to the battalion vehicle where
equipment and focus could be used to run the fire scene and keep
accountability of personnel intact. An "Operations" role was assigned to
assist with span of control. This continued until the last units were released
from the scene. All unit narratives will outline some of the actions and
command assignments that were given. The utilities companies from
electrical and gas providers arrived on scene and secured utilities to the
structure. 1-800 BOARDUP was called to the scene as well to assist the
homeowner with securing the home and taking possession of the structure
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
1
# of Personnel
B4
CAD App ID
B4
Page 7 of 16
once firefighting operations and fire investigative operations were completed.
From extinguishment of the fire until the following morning, a fire watch"
continued every 2 hours to ensure that no hazards or fire were noted.
Alpharetta Fire Department provided Battalion 8, Engines 81, 82, and 85,
Truck 83 and the rehab unit.
AMR provided a dedicated ambulance to the scene in case of injury
Milton and Alpharetta provided police units for traffic control
Milton Public works provided support with heavy equipment for the fire
investigation
5/14/2021 12:59 PM, Danny Elliott
Personnel Arrival Time Clear Time Actions Taken
06:37:02 17:42:04Danny Elliott
15:05:3206:39:0006:30:2906:26:13 06:26:13
Apparatus Narrative
Engine 41 responded Emergency on a structure fire. E41 was the third unit
to arrive and requested assignment. E41 was assigned to hose lines on the
Alpha Side of the structure to attack heavy fire from the garage. E41 Crew
was exterior while putting water on the fire with a 2.5 smooth bore. Crew
Swap occurred at Rehab. E41 continued assignments and assisted with the
scene and various details that were requested. E41 was put in place of E44
to take over pumping two handlines during overhaul. E41 was released by
command and returned to the station. E41 back in service.
5/12/2021 3:54 PM, Mark Slyman
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
5
# of Personnel
E41
CAD App ID
E41
Actions for Apparatus
10 10 - Fire control Or extinguishment- other
Personnel Arrival Time Clear Time Actions Taken
06:39:00 15:05:32 10 - Fire contrMark Slyman
06:39:00 15:05:32 10 - Fire contrPatrick Turner
06:39:00 15:05:32 10 - Fire contrJoshua Payne
06:39:00 15:05:32 10 - Fire contrTim Farnell
06:39:00 15:05:32 10 - Fire contrDerek Hofmann
Page 8 of 16
17:28:1806:39:5406:30:0106:26:13 06:26:13
Apparatus Narrative
ENG43, second in Engine, arrived after ENG85. Upon arrival ENG43
assisted ENG85 with water supply. ENG43 then pulled a 1 3/4" cross-lay
from ENG85 and made entry through the front door and began extinguishing
fire. ENG43 was then pulled out by command. Later ENG43 crew made
another entry through the front door to the second floor and began
extinguishing fire. ENG43 was then pulled out again by command.
Operations changed to defensive fire attack at this point. ENG43 crew went
to rehab. Personnel exchange was made between CAPT. Brown and (A)
CAPT Carter. ENG43 crew then was assigned to the Bravo Charlie corner of
the structure for defensive fire attack and remained there until released.
5/12/2021 12:33 PM, Gregory Carter
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
4
# of Personnel
E43
CAD App ID
E43
Actions for Apparatus
11 11 - Extinguishment by fire service perso
12 12 - Salvage & overhaul
Personnel Arrival Time Clear Time Actions Taken
06:39:54 17:28:18 11 - ExtinguisMarc Brown
06:39:54 17:28:18 11 - Extinguis 12 - Salvage Daniel Sanders
06:39:54 17:28:18 11 - Extinguis 12 - Salvage Robert Sells
06:39:54 17:28:18 11 - Extinguis 12 - Salvage Gregory Carter
11:06:4006:36:0706:28:4806:26:13 06:26:13
Apparatus Narrative
R-42 dispatched to a structure fire with a full response to accompany. On
arrival, R-42 gave a size up of a large two story residential structure with
heavy fire involvement in the garage. BC-4 assumed command immediately
after R-42 size up, and R-42 made room for the engine companies. R-42 two
personnel stretched the 1-3/4'' #1 crosslay from E-85 and made entry with
captain from E-43 through the front door, which was unlocked. R-42 made a
push through the kitchen into the "mudroom" and made a fire attack. R-42
was pulled out by command and came out to reposition lines. R-42 two
personnel, captain from E-43 and FF from 43 reentered the residents through
the from door and up stairs. Once up stairs crews pulled ceiling and attacked
the fire, which started to run the attic. Once again we were pulled out and
advised the fire attack was going defensive. R-42 two personnel,
repositioned to the Charlie side of the structure and assisted crews with
setting up lines for a defensive fire attack. R-42 two personnel reported to
rehab and was relived by A shift crew. R-42 two personnel cleared the scene.
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
4
# of Personnel
RES42
CAD App ID
R42
Actions for Apparatus
11 11 - Extinguishment by fire service perso
Personnel Arrival Time Clear Time Actions Taken
06:36:07 11:06:40 11 - ExtinguisBrian Murtagh
06:36:07 11:06:40 11 - ExtinguisAnisa Gannon
06:36:07 11:06:40 12 - Salvage Chris Lohmuller
06:36:07 11:06:40 12 - Salvage Mary Glasgow
Page 9 of 16
17:47:1406:40:0006:30:3206:26:13 06:26:13
Apparatus Narrative
T 41 on scene first due truck. Assignment was to setup aerial for defense
operation. One member T 41 crew climb to tip to control the nozzle. E 85
supplied T 41 with one section of 5 in hose, Fire was controlled and fire
personnel was moved to a hand line on the A B corner to hit a hot spot that
had flared back up. T 41 moved to rehab. after rehab T 41 was assigned to
salvage and overhaul in the C side master bath room. After completion of
assignment, clean up and return all equipment to apparatus. T 41 returned to
service.
5/12/2021 5:41 PM, Tyson Blake
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
5
# of Personnel
T41
CAD App ID
T41
Actions for Apparatus
11 11 Extinguishment by fire service personn
12 12 Salvage & overhaul
Personnel Arrival Time Clear Time Actions Taken
06:40:00 17:47:14 11 - Extinguis 12 - Salvage Anthony DelCampo
06:40:00 17:47:14 11 - ExtinguisJamie Campbell
06:40:00 17:47:14 11 - ExtinguisTravis Long
06:40:00 17:47:14 12 - Salvage 11 - ExtinguisCarolyn Edge
06:40:00 17:47:14 11 - Extinguis 12 - Salvage Tyson Blake
16:00:0007:10:0006:49:2306:49:00
Apparatus Narrative
Alpharetta Rehab unit responded to the fire incident for support. Crews
working used the rehab area to rest. Rehab provided snacks and drinks and
filled air cylinders,
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
3
# of Personnel
Rehab (Alphar
CAD App ID
Actions for Apparatus
56 56 - Provide air supply
73 73 - Provide manpower
74 74 - Provide apparatus
Personnel Arrival Time Clear Time Actions Taken
07:10:00 16:00:00 56 - Provide a 73 - Provide 74 - Provide
07:10:00 16:00:00 56 - Provide a 73 - Provide 74 - Provide
07:10:00 16:00:00 56 - Provide a 73 - Provide 74 - Provide
17:47:1406:38:3706:38:3406:38:33 06:38:33
Apparatus Narrative
Fire Chief responded to working structure and assisted in Command
operations as well as assisted in investigation.
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
1
# of Personnel
401
CAD App ID
M401
Personnel Arrival Time Clear Time Actions Taken
06:38:37 17:47:14 81 - Incident Gabe Benmoussa
Page 10 of 16
14:16:3607:11:4306:40:2406:38:35 06:38:35
Apparatus Narrative
On May 12th at approximatley 06:30 I Captain Johnny Gomez was the on call
fire investigator. Was on my way in to work, when recieved a page out from
dispatch advsing of a structure fire at the following address of 14013Tree Loft
road. I advised dispacth via landline that I was responding with delayed
response.
Arrived on scene at approxiamtely 07:11am and reported to command to
assist with firefighting operations. Due to fire intensity and unstable
structure, fire investigation could not start. Once overhaul was completed
and fire completely extinguished myself, 405 Fire Marshal Fortner and 404
Deputy Chief Marietta began our fire investigation.
Investigation was concluded at approxiamtely 14:00 and I was released by
Command and back in service.
5/12/2021 4:56 PM, Johnny Gomez
Apparatus ID Dispatch (DP)Enroute (ER)Arrival (AR)ClearedDispatch (DC)
1
# of Personnel
407
CAD App ID
Actions for Apparatus
86 86 Investigate
Personnel Arrival Time Clear Time Actions Taken
07:11:43 14:16:36Johnny Gomez
Page 11 of 16
Member Making Report
Officer In Charge
Report Completed Date
05/14/21
Authorization
Review
Report Reviewed Date
Member Making Report
Danny Elliott
Officer In Charge
Danny Elliott
Report Reviewed By
Officer In Charge Assignment
B 4
Member Making Assignment
B 4
Phone NumberOwner Full Name Person / EntityOwner / Involved Entity Name
Owner /Involved Person and Entities
Clemmer, Hall 1 - Owner 1 - Person 6159340295
Clemmer , Debbie 2 - Involved 1 - Person 615-210-3085
Contact Type Contact Value
1
Insurance CompanyPolicy Type Policy Number
Insurance Policies
Home and Auto State Farm Insurance 899 8067-F08-11
Home and Auto State Farm
Agent Details
Name SuffixLast NameMiddle NameFirst Name
Page 12 of 16
CAD Details
CAD Notes
{B4} HOME TOT H/O. WE WILL BE DOING FIRE WATCH THROUGH THE NIGHT [05/12/21 17:40:02 ALSMITH] {B4} ALL UNITS CLR
FROM THE FIRE [05/12/21 17:39:27 ALSMITH] {B4} T41 AND E43 WILL ADV INDEPENDENTLY WHEN THEYRE BIS // E41 WILL
REMAIN ONSC WITH B4 FOR A LOT LONGER [05/12/21 15:04:39 JRAMIREZ] [FIRE] {E81} ON MAIN ENR TO STATION 81 FOR
DECON [05/12/21 11:07:33 PSMITH] {R42} CLR OF SNC. BE OUT OF SERVICE FOR A FEW [05/12/21 11:06:38 PSMITH] [FIRE]
{E85} CLR OF SCENE. OS UNTIL FURTHER [05/12/21 11:03:48 PSMITH] COMMAND ADV/ E41 T41 AND E44 AND B4 WILL
REMAIN ON SCENE ON TAC / NO NEED TO MONITOR / WILL COME TO MAIN IF I NEED ANYTHING [05/12/21 11:02:25 LADAMS]
Call Ref#427 Call Transfer Note: {FROM EMS: Cancelled event with disposition []} [05/12/21 11:02:00 TRANSFER] Call Ref#427 Call
Transfer Note: Unit: 8112; Status: AV; Time: 05/12/2021 11:01:55 [05/12/21 11:01:59 TRANSFER] COMMAND ADV / RELEASING R42
E81 AND E85 / THEY WILL ADV INDIVIDUALLY WHEN BIS [05/12/21 11:00:39 LADAMS] E43 RELEASED BY COMMAND / BIS ON
MAIN [05/12/21 10:57:15 LADAMS] dispatch from command / we`re releasing AMR [05/12/21 10:50:41 LADAMS] just temp to get
apparatus by [05/12/21 10:32:02 LADAMS] E44 to command /; about to kill water to move hose / / go ahead [05/12/21 10:31:34
LADAMS] command fro 81 / operations / location? / coming around to your side [05/12/21 10:26:09 LADAMS] 85 CLEAR [05/12/21
10:12:33 LADAMS] COMMAND TO 85 / SHUT DOWN LADDER PIPE [05/12/21 10:12:15 LADAMS] *TOO HIGH [05/12/21 10:11:48
LADAMS] 2 feet to high / youre shooting over the wall [05/12/21 10:01:11 LADAMS] trk 41 raise and to the left / the stream / per 402 / a
little more [05/12/21 10:00:25 LADAMS] LOOKING FOR REAR WALL / [05/12/21 09:59:18 LADAMS] OPERATIONS FROM COMMAND
IS THAT PLACEMENT SUFFICIENT [05/12/21 09:59:00 LADAMS] ALL LINES MOVED [05/12/21 09:57:37 LADAMS] SAFETY FROM
E44 / DO NOT USE B/C ENTRANCE / KNOCKING DOWN WALL [05/12/21 09:57:01 LADAMS] ALL CREWS DO NOT ENTER B/C SIDE
[05/12/21 09:55:18 LADAMS] SAFETY TO 85/43 WE HAVE RELIEF COMING [05/12/21 09:55:06 LADAMS] OPERATIONS SAYS 41
COMING UP [05/12/21 09:51:46 LADAMS] SDAFETY TO OPERATIONS / SEND A CREW TO MOVE THESE LINES AWAY FROM THE
WALL BEFOR OPENING LINES [05/12/21 09:51:33 LADAMS] SAFETY TO ALL CREWS STAY AWAY FROM C-SIDE B/C CORNER
[05/12/21 09:50:52 LADAMS] COMMAND TO OEPRATIONS / 43 MOVING TO REHAB FOR FOOD [05/12/21 09:45:42 LADAMS]
CREWS READY [05/12/21 09:43:28 LADAMS] COMMAND TO OPERATIONS / LET ME KNOIW WHEN YOUR SET [05/12/21 09:43:22
LADAMS] OPERATIONS TO COMMAND / WE`RE GONNA ROTATE CREWS / ADV [05/12/21 09:43:05 LADAMS] B4 SAYS IM
COMING TO YOU OPERATIONS [05/12/21 09:38:35 LADAMS] CORRECTION OPERATIONS IF YOU NEED 401 CALL B4 [05/12/21
09:38:10 LADAMS] OPERATIONS IF YOU NEED OPERATIONS CALL B4 IM WITH HIM [05/12/21 09:37:45 LADAMS] 401 FROM
OPERATIONS/ B4 TO OPERATIONS HOLD ON A MOMENT [05/12/21 09:37:27 LADAMS] 401 FROM COMMAND / NO ANSWER
[05/12/21 09:36:17 LADAMS] OPERATIONS TO COMMAND / 41 CLEAR OF REHAB / READY FOR ASSIGNMENT / COMMAND SAYS
KEEP THEM ON DECK [05/12/21 09:32:20 LADAMS] [05/12/21 09:35:05 LADAMS] [FIRE] OPERATIONS HAVE E85 SWAP W/ E81 / C
SIDE FOR RELIEF [05/12/21 09:26:35 LADAMS] [FIRE] B4 TO E85 SHUT DOWN LADDER PIPE [05/12/21 09:25:52 LADAMS] [FIRE]
T41 FROM B4/ KEEP WATERLINE UP ON THE ROOF BY CHIMNEY [05/12/21 09:23:20 LADAMS] [FIRE] HOLD RIGHT THERE DROP
OPERATOR [05/12/21 09:22:48 LADAMS] SAFETY FROM OPERATIONS / SAFETY GO AHEAD / MEET ME ON DELTA SIDE
[05/12/21 09:21:01 LADAMS] CREWS ON CHARLIE DIV IF SMOKE BANK LAYS DOWN/ BACK OUT [05/12/21 09:15:54 LADAMS] E43
HAVE AIRPACKS / NO SMOKE BACK HERE [05/12/21 09:15:09 LADAMS] HAVE CO43 BACK OUT [05/12/21 09:14:56 LADAMS]
OPERATIONS / GET E43 CREW COVERED IN SMOKE [05/12/21 09:14:45 LADAMS] HAVE AIR BACK THEM UP [05/12/21 09:11:51
LADAMS] SAFETY TO COMMAND / WE HAVE CREWS IN DIRECT LINE OF SMOKE [05/12/21 09:11:38 LADAMS] SHUTTING DOWN
GREEN 2 1/2 LIINE [05/12/21 09:09:59 LADAMS] OPERATIONS TO COMMAND / WE NEED MORE WATER FOR LADDER /
ALPHA/BRAVO SIDE [05/12/21 09:09:36 LADAMS] 41A TO 41B / GO HIGHER [05/12/21 09:08:02 LADAMS] {M402} to all crews / we
are resuming ariel operations / [05/12/21 09:06:34 LADAMS] [FIRE] SAFETY SEE FLA MES COMING FROM PEAK FROM A SIDE OF
STRUCTURE [05/12/21 09:03:44 SCHERUBIN] {B4} RELEASING T83 AND B8 [05/12/21 08:47:50 SCHERUBIN] {M402} HAVE
OPERATIONS [05/12/21 08:46:59 SCHERUBIN] [FIRE] {B8} TRANSFERRED OPERATIONS TO 402 [05/12/21 08:46:47 SCHERUBIN]
{M402} PUTTING HOSE LINE BACK TO CENTER OF STRUCTURE [05/12/21 08:27:25 SCHERUBIN] [FIRE] {B8} REQ FRESH CREW
TO COME OUT ON ALPHA SIDE [05/12/21 08:20:45 SCHERUBIN] [FIRE] {B8} NEED A LINE ON THE ALPHA SIDE [05/12/21 08:19:03
SCHERUBIN] 402 ASSUMING CHARLIE DIVISION [05/12/21 08:18:14 SCHERUBIN] [FIRE] {B8} ELECTRIC CO. ONS [05/12/21
08:17:16 SCHERUBIN] {M401} GETTING A LINE AT THE FRONT DOOR/ POCKET OF FIRE [05/12/21 08:17:03 SCHERUBIN] {E43}
HITTING HOT SPOTS// SOME IN THE ROOF LINE// TRYING TO KNOCK DOWN ALL THE WAY [05/12/21 08:15:27 SCHERUBIN]
UDTS: {B4} ===CANCEL STATUS CHECK=== [05/12/21 08:14:32 SCHERUBIN] {B4} DISCONTINUING PAR AND WORKING ON
VISUAL [05/12/21 08:13:39 SCHERUBIN] {M401} NEED EXIT FOR REHAB [05/12/21 08:09:37 SCHERUBIN] {B4} CHECKING PAR
[05/12/21 08:06:58 SCHERUBIN] [FIRE] {B8} FIRE OUT [05/12/21 08:02:35 SCHERUBIN] [FIRE] {B8} ALL MILTON C SHIFT
RELEASED FROM SCENE [05/12/21 08:00:38 SCHERUBIN] [FIRE] {B8} E44 REPORT TO CHARLIE SIDE [05/12/21 07:59:43
SCHERUBIN] {M401} E81 IN REHAB HAVE E43 E41 E85 [05/12/21 07:57:36 SCHERUBIN] [FIRE] {E81} IN REHAB [05/12/21 07:56:23
SCHERUBIN] [FIRE] {E85} CLEAR FOR REHAB / CLEAR C SIDE [05/12/21 07:56:09 SCHERUBIN] [FIRE] {T83} GOING TO REHAB
[05/12/21 07:55:32 SCHERUBIN] [FIRE] {B8} REQ E44 FOR STRAIGHT STREAM FOR A D COR [05/12/21 07:54:47 SCHERUBIN] {B4}
ELECTRICITY SECURED FOR STRUCTURE [05/12/21 07:53:36 SCHERUBIN] UNABLE TO CUT GAS OFF ON THE EXTERIOR/ A D
COR SECURE [05/12/21 07:49:50 SCHERUBIN] {M401} WATCH OUT FOR CHIMNEY/. LEANING FURTHER [05/12/21 07:49:21
SCHERUBIN] [FIRE] {B8} ATL GAS LIGHT ON AD COR [05/12/21 07:46:34 SCHERUBIN] {B4} CHECKING PAR [05/12/21 07:42:58
SCHERUBIN] {M401} CHIMNEY LEANING ON THE ALPHA SIDE [05/12/21 07:42:08 SCHERUBIN] [FIRE] {B8} SWAPPING
PERSONNEL ON T41 [05/12/21 07:40:15 SCHERUBIN] {E44} REPLACING E85 [05/12/21 07:39:19 SCHERUBIN] {M401} MAKING
GOOD PROGRESS FROM THE C SIDE/ GET THE STREAM TO THE BACK OF THE HOUSE [05/12/21 07:38:59 SCHERUBIN] {M401}
E85 AND PRE ASSIGNED CREW WORKING FOR ME RIGHT NOW [05/12/21 07:37:46 SCHERUBIN] {B4} GAS CO ONS [05/12/21
07:33:57 SCHERUBIN] [FIRE] {B8} PULL STREAM BACK TO ALPHA SIDE [05/12/21 07:33:48 SCHERUBIN] [FIRE] {B8} DIRECTING
STREAM TO BC SIDE/ FIRE IN THAT COR [05/12/21 07:32:39 SCHERUBIN] [FIRE] {B8} MOVED 81 TO B C SIDE [05/12/21 07:32:09
SCHERUBIN] [FIRE] {B8} E85 T41 E44 ON THE ALPHA SIDE [05/12/21 07:30:42 SCHERUBIN] [FIRE] {B8} IF HAND LINES NOT
DOING AGGRESSIVE ATTACK -SHUT IT DOWN [05/12/21 07:26:49 SCHERUBIN] {M401} SEEING SOME FLAMES [05/12/21
07:26:09 SCHERUBIN] {M401} T41 PUSH STREAM HIGHER FURTHER BACK TOWARD THE C SIDE [05/12/21 07:25:45
SCHERUBIN] [LAW] REHAB8 WILL BE USING ALPHARETTA TAC3 FOR THEIR OPERATIONS [05/12/21 07:22:59 PMILLER] {M401}
CONFIRMING E81 T83 [05/12/21 07:22:17 SCHERUBIN] {M401} T83 AND E85 ONLY UNITS WORKING FOR ME [05/12/21 07:21:32
SCHERUBIN] {B4} TO C DIV HAS E81 T83 WORKING ON THE CHARLIE SIDE [05/12/21 07:19:49 SCHERUBIN] [FIRE] {B8}
OPERATIONS RELOCATED TO THE ALPHA SIDE [05/12/21 07:19:17 SCHERUBIN] {M401} ALSO E43 REPORTING TO REHAB
Page 13 of 16
EventDetails: AgencyCode: MFD ReportNumber: 2101210 CadInciNumber: 20210063530 NatureCode: 69E06 NatureDescription:
STRUCTURE -RESIDENCE EventPriorityCode: P PriorityDispatchDeterminant: 69E06 LocationTypeCode: 1 StreetNumber: 14013
StreetDirection: StreetName: TREE LOFT StreetType: RD StreetPostDirection: ApartmentSuite: ApartmentSuiteUnfiltered: Full Address:
14013 TREE LOFT RD CityCode: MILT CityCodeDescription: MILTON State: GA ZipCode: 30004 SiteName: SiteCADKey:
SiteTypeCode: XStreetDirection: XStreetName: XStreetType: XStreetPostDirection: EventLatitude: 34.12283
EventLongitude: -84.32216 SPGeox: 2249528.00 SPGeoy: 1499793.75 DMSLatitude: 34 7 22.19 N DMSLongitude: 84 19 19.78 W
DMMLatitude: 34 7.3698 N DMMLongitude: 84 19.3296 W AdditionalAddressInfo: (S)CRABAPPLE BROOKE (N) EventStartTime:
2021-05-12 06:25:14 FirstDispatchTime: 2021-05-12 06:26:13 FirstEnrouteTime: 2021-05-12 06:28:08 FirstOnSceneTime: 2021-05-12
06:36:07 UnderControlTime: LastUnitClearTime: FirstTransportTime: LastTransportArriveTime: EventCompletedTime: LastExportTime:
2021-05-12 17:47:31 PatientContactTime: EventDistrict: MF42 EventStation: MF41 EventBeat: EventReportingArea: EventGeoProximity:
F41A CadResponsePlan: MFNO CadResponsePlanCategory: FSTR CallerName: CallerAddress: CallerNumber: 6159340295
CallSource: W 911 E911Used: T CallTakerUserId: JRAMIREZ CallTakerName: RAMIREZ, JACQUELINE DispatcherUserId: SCHERUBIN
DispatcherName: CHERUBIN, SANDRA EventDispositionCode: 03 MultipleEventDispositions: 03 FirstAgencyArriveTime: 2021-05-12
06:36:07 CadNotes: {B4} HOME TOT H/O. WE WILL BE DOING FIRE WATCH THROUGH THE NIGHT [05/12/21 17:40:02 ALSMITH]
{B4} ALL UNITS CLR FROM THE FIRE [05/12/21 17:39:27 ALSMITH] {B4} T41 AND E43 WILL ADV INDEPENDENTLY WHEN THEYRE
BIS // E41 WILL REMAIN ONSC WITH B4 FOR A LOT LONGER [05/12/21 15:04:39 JRAMIREZ] [FIRE] {E81} ON MAIN ENR TO
STATION 81 FOR DECON [05/12/21 11:07:33 PSMITH] {R42} CLR OF SNC. BE OUT OF SERVICE FOR A FEW [05/12/21 11:06:38
PSMITH] [FIRE] {E85} CLR OF SCENE. OS UNTIL FURTHER [05/12/21 11:03:48 PSMITH] COMMAND ADV/ E41 T41 AND E44 AND B4
WILL REMAIN ON SCENE ON TAC / NO NEED TO MONITOR / WILL COME TO MAIN IF I NEED ANYTHING [05/12/21 11:02:25
LADAMS] Call Ref#427 Call Transfer Note: {FROM EMS: Cancelled event with disposition []} [05/12/21 11:02:00 TRANSFER] Call Ref#
427 Call Transfer Note: Unit: 8112; Status: AV; Time: 05/12/2021 11:01:55 [05/12/21 11:01:59 TRANSFER] COMMAND ADV /
RELEASING R42 E81 AND E85 / THEY WILL ADV INDIVIDUALLY WHEN BIS [05/12/21 11:00:39 LADAMS] E43 RELEASED BY
COMMAND / BIS ON MAIN [05/12/21 10:57:15 LADAMS] dispatch from command / we`re releasing AMR [05/12/21 10:50:41 LADAMS]
just temp to get apparatus by [05/12/21 10:32:02 LADAMS] E44 to command /; about to kill water to move hose / / go ahead [05/12/21
10:31:34 LADAMS] command fro 81 / operations / location? / coming around to your side [05/12/21 10:26:09 LADAMS] 85 CLEAR
[05/12/21 10:12:33 LADAMS] COMMAND TO 85 / SHUT DOWN LADDER PIPE [05/12/21 10:12:15 LADAMS] *TOO HIGH [05/12/21
10:11:48 LADAMS] 2 feet to high / youre shooting over the wall [05/12/21 10:01:11 LADAMS] trk 41 raise and to the left / the stream / per
402 / a little more [05/12/21 10:00:25 LADAMS] LOOKING FOR REAR WALL / [05/12/21 09:59:18 LADAMS] OPERATIONS FROM
COMMAND IS THAT PLACEMENT SUFFICIENT [05/12/21 09:59:00 LADAMS] ALL LINES MOVED [05/12/21 09:57:37 LADAMS]
SAFETY FROM E44 / DO NOT USE B/C ENTRANCE / KNOCKING DOWN WALL [05/12/21 09:57:01 LADAMS] ALL CREWS DO NOT
ENTER B/C SIDE [05/12/21 09:55:18 LADAMS] SAFETY TO 85/43 WE HAVE RELIEF COMING [05/12/21 09:55:06 LADAMS]
[05/12/21 07:18:59 SCHERUBIN] {M401} R42 ENR TO REHAB WITH E41 [05/12/21 07:18:16 SCHERUBIN] WATER ON THE CHARLIE
DELTA COR RIGHT NOW [05/12/21 07:18:01 SCHERUBIN] B8 ASSIGNED OVER OPERATIONS/ WILL BE ON ALPHA SIDE [05/12/21
07:17:50 SCHERUBIN] {M401} ROOF COLLAPSE AT C D COR [05/12/21 07:17:24 SCHERUBIN] M402 REQ ROS FOR COVERAGE
AT S41 CHER FOR S43 AND ALPH FOR S44 [05/12/21 07:16:45 SCHERUBIN] {M401} REQ TO ESTABLISH 2 1/2 ON THE ALPHA
SIDE/ [05/12/21 07:12:42 SCHERUBIN] {B4} STANDING BY FOR PAR [05/12/21 07:09:23 SCHERUBIN] {M401} FF FROM ENG 5 C
DIVISION OUT OF AIR ENR TO REHAB [05/12/21 07:08:19 SCHERUBIN] {M401} GOT R42 E41 E43 AND 1 PERSON FROM E83
WORKING THE CHARLIE SIDE [05/12/21 07:07:04 SCHERUBIN] {B4} NO ACCESS FOR TRK TO GET UP THERE// [05/12/21
07:05:10 SCHERUBIN] {M401} NEED LADDER SOON [05/12/21 07:04:42 SCHERUBIN] {M401} REPOSITION NEED WATER ON THE
B SIDE [05/12/21 07:04:29 SCHERUBIN] {M401} HEAVY FIRE STILL ON BRAVO SIDE [05/12/21 07:03:36 SCHERUBIN] ** E85 OUT
[05/12/21 07:03:19 SCHERUBIN] [FIRE] {B8} T 41 SHOOTING OVER THE HOUSE [05/12/21 07:02:45 SCHERUBIN] {B4} ALPH ON
BRAVO SIDE 401 CHARLIE DIVISION NEED 2 1/2 LINES/ MORE WATER NEEDED 485 OUT [05/12/21 07:02:25 SCHERUBIN] {B4}
CHECKING PAR [05/12/21 06:57:54 SCHERUBIN] [FIRE] {B8} SHUT THE GREEN SIDE THAT SUPPLYING THE RAMP [05/12/21
06:56:18 SCHERUBIN] {B4} NEXT ARRIVING UNITS GET A PLUG FROM DOWN HILL TO GET SOME MORE WATER [05/12/21
06:54:10 SCHERUBIN] {B4} ALL UNITS OUT IN DEFENSIVE MODE [05/12/21 06:53:46 SCHERUBIN] [FIRE] {B8} HEAVY FIRE FROM
C SIDE [05/12/21 06:53:21 SCHERUBIN] {E44} ENR FOR 5 MINS [05/12/21 06:53:12 SCHERUBIN] {B4} ALL UNITS COME BACK
OUTSIDE TO GO ON THE DEFENCE AGAIN [05/12/21 06:52:59 SCHERUBIN] [LAW] SPOKE WITH JAY FROM SAWNEE POWER
ADV HE WILL HAVE SOMEONE ENR [05/12/21 06:51:25 SPOPE] {B4} E43 MAKING ENTRY TO INTERIOR TO CENTER OF
STRUCTURE [05/12/21 06:50:25 SCHERUBIN] ATLANTA GAS ENROUTE 30-60 ETA [05/12/21 06:49:41 PMILLER] [FIRE] {B8}
HEAVY SMOKE THRUOUT THE ATTIC [05/12/21 06:49:03 SCHERUBIN] [FIRE] REHAB IS AWARE AND ADVISE HE IS ON THE WAY
[05/12/21 06:49:00 SPOPE] {B4} E43 COME OUTSIDE [05/12/21 06:47:27 SCHERUBIN] {B4} EVERYONE OUT OF THE STRUCTURE//
GET THE LADDER UP [05/12/21 06:47:07 SCHERUBIN] PARTIAL COLLAPSE OF ROOF AT THE GARAGE [05/12/21 06:46:45
SCHERUBIN] REQ 2ND ALARM AND UTILITILS [05/12/21 06:45:26 SCHERUBIN] {E43} MAKING INTEROR ATTACK FROM THE
FRONT DOOR TO CUT IT OFF [05/12/21 06:44:14 SCHERUBIN] NO CREWS MAKE ENTRY/ ATT TO KNOCK DOWN FROM THE
EXTERIOR BEFORE MAKING ENTRY TO INTERIOR TO CUT IT OFF [05/12/21 06:43:45 SCHERUBIN] {B4} GOT WATER COMING
[05/12/21 06:41:26 SCHERUBIN] {B4} REQ TANK WATER NOW [05/12/21 06:41:08 SCHERUBIN] TRYING TO SAVE THE
STRUCTURE/ WILL MAKE DETERMINATION IN A MIN/ GET WATER ON GREEN LINE [05/12/21 06:40:37 SCHERUBIN] Call Ref#427
Call Transfer Note: Unit: 8112; Status: A; Time: 05/12/2021 06:40:20 [05/12/21 06:40:25 TRANSFER] {B4} HE4AVY FIRE CONSUMING
HOME/ AB CORNER/ [05/12/21 06:39:48 SCHERUBIN] {B4} out doing a 360 [05/12/21 06:37:41 SCHERUBIN] {R42} large 2 story
structure/ heavy smoke and fire coming from garage// hydrant in front of the house [05/12/21 06:36:46 SCHERUBIN] [FIRE]
EMERGENCY NOTIFIATION HAS BEEN SENT [05/12/21 06:34:42 PSMITH] UDTS: {E41} WORKING STRUCTURE FIRE [05/12/21
06:33:23 PSMITH] [FIRE] send notification [05/12/21 06:32:03 SCHERUBIN] [LAW] {D23} FULLY ENGULFED [05/12/21 06:31:10
ALSMITH] CALLER ADV EVERYONE OUT [05/12/21 06:31:07 JRAMIREZ] rma enr from omp and westside [05/12/21 06:28:29
SCHERUBIN] Call Ref#427 Call Transfer Note: Unit: 8112; Status: E; Time: 05/12/2021 06:28:03 [05/12/21 06:28:06 TRANSFER]
CALLER ADV THEY WOKE UP TO ALARM GOING OFF AND THEN SAW FIRE COMING FROM GARAGE [05/12/21 06:27:49
JRAMIREZ] CALLER SEES FLAMES AND SMOKES FROM GARAGE [05/12/21 06:27:17 JRAMIREZ] [EFD] Questions: 2. Caller not
inside bldg. 3. Multi-story: 3 4. No one trapped. 5. Fire loc: garage 6. Floor: garage 2st floor 7. No inj. [05/12/21 06:26:38
JRAMIREZ] Call Ref#427 Call Transfer Note: Unit: 8112; Status: D; Time: 05/12/2021 06:26:29 [05/12/21 06:26:33 TRANSFER] Call
Ref#427 Call Transfer Note: {FROM GEORGIA: Changed Caller Phone to (000) 000-0000 EXT.} [05/12/21 06:26:20 TRANSFER] Call
Ref#427: {Call created for EMS as Event # 20210063533} [05/12/21 06:25:59 TRANSFER] [EFD] Dispatch Code: 69E06 (Residential
(single)) Response: .ECHO Questions: 1. Residential (single). [05/12/21 06:25:56 JRAMIREZ] [EFD] Caller Statement: REPORTED
BUILDING/STRUCTURE FIRE Chief Complaint: Structure Fire [05/12/21 06:25:50 JRAMIREZ]
Page 14 of 16
OPERATIONS SAYS 41 COMING UP [05/12/21 09:51:46 LADAMS] SDAFETY TO OPERATIONS / SEND A CREW TO MOVE THESE
LINES AWAY FROM THE WALL BEFOR OPENING LINES [05/12/21 09:51:33 LADAMS] SAFETY TO ALL CREWS STAY AWAY FROM
C-SIDE B/C CORNER [05/12/21 09:50:52 LADAMS] COMMAND TO OEPRATIONS / 43 MOVING TO REHAB FOR FOOD [05/12/21
09:45:42 LADAMS] CREWS READY [05/12/21 09:43:28 LADAMS] COMMAND TO OPERATIONS / LET ME KNOIW WHEN YOUR SET
[05/12/21 09:43:22 LADAMS] OPERATIONS TO COMMAND / WE`RE GONNA ROTATE CREWS / ADV [05/12/21 09:43:05 LADAMS] B4
SAYS IM COMING TO YOU OPERATIONS [05/12/21 09:38:35 LADAMS] CORRECTION OPERATIONS IF YOU NEED 401 CALL B4
[05/12/21 09:38:10 LADAMS] OPERATIONS IF YOU NEED OPERATIONS CALL B4 IM WITH HIM [05/12/21 09:37:45 LADAMS] 401
FROM OPERATIONS/ B4 TO OPERATIONS HOLD ON A MOMENT [05/12/21 09:37:27 LADAMS] 401 FROM COMMAND / NO ANSWER
[05/12/21 09:36:17 LADAMS] OPERATIONS TO COMMAND / 41 CLEAR OF REHAB / READY FOR ASSIGNMENT / COMMAND SAYS
KEEP THEM ON DECK [05/12/21 09:32:20 LADAMS] [05/12/21 09:35:05 LADAMS] [FIRE] OPERATIONS HAVE E85 SWAP W/ E81 / C
SIDE FOR RELIEF [05/12/21 09:26:35 LADAMS] [FIRE] B4 TO E85 SHUT DOWN LADDER PIPE [05/12/21 09:25:52 LADAMS] [FIRE]
T41 FROM B4/ KEEP WATERLINE UP ON THE ROOF BY CHIMNEY [05/12/21 09:23:20 LADAMS] [FIRE] HOLD RIGHT THERE DROP
OPERATOR [05/12/21 09:22:48 LADAMS] SAFETY FROM OPERATIONS / SAFETY GO AHEAD / MEET ME ON DELTA SIDE [05/12/21
09:21:01 LADAMS] CREWS ON CHARLIE DIV IF SMOKE BANK LAYS DOWN/ BACK OUT [05/12/21 09:15:54 LADAMS] E43 HAVE
AIRPACKS / NO SMOKE BACK HERE [05/12/21 09:15:09 LADAMS] HAVE CO43 BACK OUT [05/12/21 09:14:56 LADAMS]
OPERATIONS / GET E43 CREW COVERED IN SMOKE [05/12/21 09:14:45 LADAMS] HAVE AIR BACK THEM UP [05/12/21 09:11:51
LADAMS] SAFETY TO COMMAND / WE HAVE CREWS IN DIRECT LINE OF SMOKE [05/12/21 09:11:38 LADAMS] SHUTTING DOWN
GREEN 2 1/2 LIINE [05/12/21 09:09:59 LADAMS] OPERATIONS TO COMMAND / WE NEED MORE WATER FOR LADDER /
ALPHA/BRAVO SIDE [05/12/21 09:09:36 LADAMS] 41A TO 41B / GO HIGHER [05/12/21 09:08:02 LADAMS] {M402} to all crews / we are
resuming ariel operations / [05/12/21 09:06:34 LADAMS] [FIRE] SAFETY SEE FLA MES COMING FROM PEAK FROM A SIDE OF
STRUCTURE [05/12/21 09:03:44 SCHERUBIN] {B4} RELEASING T83 AND B8 [05/12/21 08:47:50 SCHERUBIN] {M402} HAVE
OPERATIONS [05/12/21 08:46:59 SCHERUBIN] [FIRE] {B8} TRANSFERRED OPERATIONS TO 402 [05/12/21 08:46:47 SCHERUBIN]
{M402} PUTTING HOSE LINE BACK TO CENTER OF STRUCTURE [05/12/21 08:27:25 SCHERUBIN] [FIRE] {B8} REQ FRESH CREW
TO COME OUT ON ALPHA SIDE [05/12/21 08:20:45 SCHERUBIN] [FIRE] {B8} NEED A LINE ON THE ALPHA SIDE [05/12/21 08:19:03
SCHERUBIN] 402 ASSUMING CHARLIE DIVISION [05/12/21 08:18:14 SCHERUBIN] [FIRE] {B8} ELECTRIC CO. ONS [05/12/21
08:17:16 SCHERUBIN] {M401} GETTING A LINE AT THE FRONT DOOR/ POCKET OF FIRE [05/12/21 08:17:03 SCHERUBIN] {E43}
HITTING HOT SPOTS// SOME IN THE ROOF LINE// TRYING TO KNOCK DOWN ALL THE WAY [05/12/21 08:15:27 SCHERUBIN]
UDTS: {B4} ===CANCEL STATUS CHECK=== [05/12/21 08:14:32 SCHERUBIN] {B4} DISCONTINUING PAR AND WORKING ON
VISUAL [05/12/21 08:13:39 SCHERUBIN] {M401} NEED EXIT FOR REHAB [05/12/21 08:09:37 SCHERUBIN] {B4} CHECKING PAR
[05/12/21 08:06:58 SCHERUBIN] [FIRE] {B8} FIRE OUT [05/12/21 08:02:35 SCHERUBIN] [FIRE] {B8} ALL MILTON C SHIFT RELEASED
FROM SCENE [05/12/21 08:00:38 SCHERUBIN] [FIRE] {B8} E44 REPORT TO CHARLIE SIDE [05/12/21 07:59:43 SCHERUBIN] {M401}
E81 IN REHAB HAVE E43 E41 E85 [05/12/21 07:57:36 SCHERUBIN] [FIRE] {E81} IN REHAB [05/12/21 07:56:23 SCHERUBIN] [FIRE]
{E85} CLEAR FOR REHAB / CLEAR C SIDE [05/12/21 07:56:09 SCHERUBIN] [FIRE] {T83} GOING TO REHAB [05/12/21 07:55:32
SCHERUBIN] [FIRE] {B8} REQ E44 FOR STRAIGHT STREAM FOR A D COR [05/12/21 07:54:47 SCHERUBIN] {B4} ELECTRICITY
SECURED FOR STRUCTURE [05/12/21 07:53:36 SCHERUBIN] UNABLE TO CUT GAS OFF ON THE EXTERIOR/ A D COR SECURE
[05/12/21 07:49:50 SCHERUBIN] {M401} WATCH OUT FOR CHIMNEY/. LEANING FURTHER [05/12/21 07:49:21 SCHERUBIN] [FIRE]
{B8} ATL GAS LIGHT ON AD COR [05/12/21 07:46:34 SCHERUBIN] {B4} CHECKING PAR [05/12/21 07:42:58 SCHERUBIN] {M401}
CHIMNEY LEANING ON THE ALPHA SIDE [05/12/21 07:42:08 SCHERUBIN] [FIRE] {B8} SWAPPING PERSONNEL ON T41 [05/12/21
07:40:15 SCHERUBIN] {E44} REPLACING E85 [05/12/21 07:39:19 SCHERUBIN] {M401} MAKING GOOD PROGRESS FROM THE C
SIDE/ GET THE STREAM TO THE BACK OF THE HOUSE [05/12/21 07:38:59 SCHERUBIN] {M401} E85 AND PRE ASSIGNED CREW
WORKING FOR ME RIGHT NOW [05/12/21 07:37:46 SCHERUBIN] {B4} GAS CO ONS [05/12/21 07:33:57 SCHERUBIN] [FIRE] {B8}
PULL STREAM BACK TO ALPHA SIDE [05/12/21 07:33:48 SCHERUBIN] [FIRE] {B8} DIRECTING STREAM TO BC SIDE/ FIRE IN THAT
COR [05/12/21 07:32:39 SCHERUBIN] [FIRE] {B8} MOVED 81 TO B C SIDE [05/12/21 07:32:09 SCHERUBIN] [FIRE] {B8} E85 T41 E44
ON THE ALPHA SIDE [05/12/21 07:30:42 SCHERUBIN] [FIRE] {B8} IF HAND LINES NOT DOING AGGRESSIVE ATTACK -SHUT IT
DOWN [05/12/21 07:26:49 SCHERUBIN] {M401} SEEING SOME FLAMES [05/12/21 07:26:09 SCHERUBIN] {M401} T41 PUSH STREAM
HIGHER FURTHER BACK TOWARD THE C SIDE [05/12/21 07:25:45 SCHERUBIN] [LAW] REHAB8 WILL BE USING ALPHARETTA
TAC3 FOR THEIR OPERATIONS [05/12/21 07:22:59 PMILLER] {M401} CONFIRMING E81 T83 [05/12/21 07:22:17 SCHERUBIN] {M401}
T83 AND E85 ONLY UNITS WORKING FOR ME [05/12/21 07:21:32 SCHERUBIN] {B4} TO C DIV HAS E81 T83 WORKING ON THE
CHARLIE SIDE [05/12/21 07:19:49 SCHERUBIN] [FIRE] {B8} OPERATIONS RELOCATED TO THE ALPHA SIDE [05/12/21 07:19:17
SCHERUBIN] {M401} ALSO E43 REPORTING TO REHAB [05/12/21 07:18:59 SCHERUBIN] {M401} R42 ENR TO REHAB WITH E41
[05/12/21 07:18:16 SCHERUBIN] WATER ON THE CHARLIE DELTA COR RIGHT NOW [05/12/21 07:18:01 SCHERUBIN] B8
ASSIGNED OVER OPERATIONS/ WILL BE ON ALPHA SIDE [05/12/21 07:17:50 SCHERUBIN] {M401} ROOF COLLAPSE AT C D COR
[05/12/21 07:17:24 SCHERUBIN] M402 REQ ROS FOR COVERAGE AT S41 CHER FOR S43 AND ALPH FOR S44 [05/12/21 07:16:45
SCHERUBIN] {M401} REQ TO ESTABLISH 2 1/2 ON THE ALPHA SIDE/ [05/12/21 07:12:42 SCHERUBIN] {B4} STANDING BY FOR PAR
[05/12/21 07:09:23 SCHERUBIN] {M401} FF FROM ENG 5 C DIVISION OUT OF AIR ENR TO REHAB [05/12/21 07:08:19 SCHERUBIN]
{M401} GOT R42 E41 E43 AND 1 PERSON FROM E83 WORKING THE CHARLIE SIDE [05/12/21 07:07:04 SCHERUBIN] {B4} NO
ACCESS FOR TRK TO GET UP THERE// [05/12/21 07:05:10 SCHERUBIN] {M401} NEED LADDER SOON [05/12/21 07:04:42
SCHERUBIN] {M401} REPOSITION NEED WATER ON THE B SIDE [05/12/21 07:04:29 SCHERUBIN] {M401} HEAVY FIRE STILL ON
BRAVO SIDE [05/12/21 07:03:36 SCHERUBIN] ** E85 OUT [05/12/21 07:03:19 SCHERUBIN] [FIRE] {B8} T 41 SHOOTING OVER THE
HOUSE [05/12/21 07:02:45 SCHERUBIN] {B4} ALPH ON BRAVO SIDE 401 CHARLIE DIVISION NEED 2 1/2 LINES/ MORE WATER
NEEDED 485 OUT [05/12/21 07:02:25 SCHERUBIN] {B4} CHECKING PAR [05/12/21 06:57:54 SCHERUBIN] [FIRE] {B8} SHUT THE
GREEN SIDE THAT SUPPLYING THE RAMP [05/12/21 06:56:18 SCHERUBIN] {B4} NEXT ARRIVING UNITS GET A PLUG FROM
DOWN HILL TO GET SOME MORE WATER [05/12/21 06:54:10 SCHERUBIN] {B4} ALL UNITS OUT IN DEFENSIVE MODE [05/12/21
06:53:46 SCHERUBIN] [FIRE] {B8} HEAVY FIRE FROM C SIDE [05/12/21 06:53:21 SCHERUBIN] {E44} ENR FOR 5 MINS [05/12/21
06:53:12 SCHERUBIN] {B4} ALL UNITS COME BACK OUTSIDE TO GO ON THE DEFENCE AGAIN [05/12/21 06:52:59 SCHERUBIN]
[LAW] SPOKE WITH JAY FROM SAWNEE POWER ADV HE WILL HAVE SOMEONE ENR [05/12/21 06:51:25 SPOPE] {B4} E43
MAKING ENTRY TO INTERIOR TO CENTER OF STRUCTURE [05/12/21 06:50:25 SCHERUBIN] ATLANTA GAS ENROUTE 30-60 ETA
[05/12/21 06:49:41 PMILLER] [FIRE] {B8} HEAVY SMOKE THRUOUT THE ATTIC [05/12/21 06:49:03 SCHERUBIN] [FIRE] REHAB IS
AWARE AND ADVISE HE IS ON THE WAY [05/12/21 06:49:00 SPOPE] {B4} E43 COME OUTSIDE [05/12/21 06:47:27 SCHERUBIN]
{B4} EVERYONE OUT OF THE STRUCTURE// GET THE LADDER UP [05/12/21 06:47:07 SCHERUBIN] PARTIAL COLLAPSE OF ROOF
AT THE GARAGE [05/12/21 06:46:45 SCHERUBIN] REQ 2ND ALARM AND UTILITILS [05/12/21 06:45:26 SCHERUBIN] {E43} MAKING
INTEROR ATTACK FROM THE FRONT DOOR TO CUT IT OFF [05/12/21 06:44:14 SCHERUBIN] NO CREWS MAKE ENTRY/ ATT TO
KNOCK DOWN FROM THE EXTERIOR BEFORE MAKING ENTRY TO INTERIOR TO CUT IT OFF [05/12/21 06:43:45 SCHERUBIN] {B4}
Page 15 of 16
GOT WATER COMING [05/12/21 06:41:26 SCHERUBIN] {B4} REQ TANK WATER NOW [05/12/21 06:41:08 SCHERUBIN] TRYING TO
SAVE THE STRUCTURE/ WILL MAKE DETERMINATION IN A MIN/ GET WATER ON GREEN LINE [05/12/21 06:40:37 SCHERUBIN]
Call Ref#427 Call Transfer Note: Unit: 8112; Status: A; Time: 05/12/2021 06:40:20 [05/12/21 06:40:25 TRANSFER] {B4} HE4AVY FIRE
CONSUMING HOME/ AB CORNER/ [05/12/21 06:39:48 SCHERUBIN] {B4} out doing a 360 [05/12/21 06:37:41 SCHERUBIN] {R42} large
2 story structure/ heavy smoke and fire coming from garage// hydrant in front of the house [05/12/21 06:36:46 SCHERUBIN] [FIRE]
EMERGENCY NOTIFIATION HAS BEEN SENT [05/12/21 06:34:42 PSMITH] UDTS: {E41} WORKING STRUCTURE FIRE [05/12/21
06:33:23 PSMITH] [FIRE] send notification [05/12/21 06:32:03 SCHERUBIN] [LAW] {D23} FULLY ENGULFED [05/12/21 06:31:10
ALSMITH] CALLER ADV EVERYONE OUT [05/12/21 06:31:07 JRAMIREZ] rma enr from omp and westside [05/12/21 06:28:29
SCHERUBIN] Call Ref#427 Call Transfer Note: Unit: 8112; Status: E; Time: 05/12/2021 06:28:03 [05/12/21 06:28:06 TRANSFER]
CALLER ADV THEY WOKE UP TO ALARM GOING OFF AND THEN SAW FIRE COMING FROM GARAGE [05/12/21 06:27:49
JRAMIREZ] CALLER SEES FLAMES AND SMOKES FROM GARAGE [05/12/21 06:27:17 JRAMIREZ] [EFD] Questions: 2. Caller not
inside bldg. 3. Multi-story: 3 4. No one trapped. 5. Fire loc: garage 6. Floor: garage 2st floor 7. No inj. [05/12/21 06:26:38 JRAMIREZ] Call
Ref#427 Call Transfer Note: Unit: 8112; Status: D; Time: 05/12/2021 06:26:29 [05/12/21 06:26:33 TRANSFER] Call Ref#427 Call Transfer
Note: {FROM GEORGIA: Changed Caller Phone to (000) 000-0000 EXT.} [05/12/21 06:26:20 TRANSFER] Call Ref#427: {Call created for
EMS as Event # 20210063533} [05/12/21 06:25:59 TRANSFER] [EFD] Dispatch Code: 69E06 (Residential (single)) Response: .ECHO
Questions: 1. Residential (single). [05/12/21 06:25:56 JRAMIREZ] [EFD] Caller Statement: REPORTED BUILDING/STRUCTURE FIRE
Chief Complaint: Structure Fire [05/12/21 06:25:50 JRAMIREZ] PrimaryUnit: T41 LinkedEvents: ReclassifiedNatureCode:
ReclassifiedNatureDescription:
Page 16 of 16
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
I
lk I
Ilk I
m-,
NO I1 . •,� pp
4 � !'fix � s ��• � ' � � I ._ I � �' • µ �
11 ih�
LE
LN
k Ik.r•: -�•� I i r. t � r a
- l =•ate _
�t.
�r
M •
*y w�
No Text
No Text
4
MY.
COIL:
1726
-Riti�l W.Y.
t
41
LC
pe
_Ire
= I
qiw4k,
Ili
Vvy
y L 5
M1 Ir 1
1� '
IAAr
_ —'�Lk' r
`�:■ it �`
17.
4r r
L L'
r 3 fit • ., � r
l+ •'• ti
y M1 k � a LL � _ .M1k �. .�-•}M1 L�- �a+L.� �a M1',+'+' - }.
le
� �� _.mow-- :' • '
Manor Estates - Structure Removal
3320 - 3370 Longstreet Road
Demolition & Disposal of existing home sites
1 Home located at 3320 & 1 Home & Garage located at 3370
Jacob Dylan
Mack Development Group
6715 Chelsea Gardens Way, Cumming GA 30040
770-851-7663 404-393-8873
Jacob@MackDevelopmentGroup.com
07/20/2021
July 20th 2021
Milton City Hall – Planning & Development
Ms. Shuba Jangam
2006 Heritage Walk
Milton, Georgia 30004
(678) 242-2590
Design Review Board - Submittal
3320 – 3370 Longstreet Road. Alpharetta, GA 30004
Ms. Jangam,
Thank you for your guidance through this process to submit our Design Review Board Submittal for the
demolition of structures on our property located at 3320 – 3370 Longstreet Road.
As we discussed on Monday, this application for Design Review Board consideration is only for the
demolition of the existing home-site structures on site. We will not be removing any trees or disturbing
any other areas.
Please note that these structures which we are asking to be demolished are documented on our Minor
Plat as well as our LDP Drawing Packages as “To Be Demolished”, so there is documentation in both sets
of drawings.
All tree removal / conservation, grading, etc. will be documented and captured in our LDP Packages for
our community. First of which you will see for the Roadway conveyance package, and then we will
subsequently have the individual lot packages as well.
We greatly appreciate your time, and thank you for your consideration.
Kindest Regards,
Jacob Dylan
President / Owner
Mack Development Group
(770) 851-7663
Scope of Work for Consideration
3320 Longstreet Road
1. Demolition & Disposal of existing single-level home & Driveway
3370 Longstreet Road
1. Demolition & Disposal of existing two-level home, garage, driveway, gate, and fence
Site Location Map
Aerial Map
Site Plan & Existing Conditions
Please Note: Area of Disturbance is defined by yellow hi-lights on the existing home-structures on our
property.
We will not be disturbing any other areas or modifying any other existing conditions.
Pictures of Structures (To Be Demolished)
3320 Longstreet Road
Pictures of Structures (To Be Demolished)
3370 Longstreet Road (Home & Garage Structure)
Pictures of Structures (To Be Demolished)
3370 Longstreet Road (Fence & Gate)
Pictures of Structures (To Be Demolished)
3370 Longstreet Road (Fence Along Side Gate Pictures)
Page is too large to OCR.
HQMEOF• AGENDA #:
t1 ! T(\�...
r
F STA IS 1,15 H E T) 2W,, L1�
DESIGN REVIEW BOARD APPLICATION
MEETING DATE: u�r�
TYPE OF REVIEW: FINAL, COURTESY -i,� CASE #
PROJECT INFORMATION
PROJECT NAME: n Yt-V' �& ke ti S' 3 6 Ck W. 61 [
PROJECT ADDRESS:
OVERLAY/FORM BASED CODE:
HAS LDP/BUILDING PERMIT BEEN SUBMITTED FOR REVIEW? YES NO
PROJECT TYPE (CHECK ONE): SITE/LANDSCAPE
BUILDING
SALES TRAILER
DEMOLITION
ZCNINGNSE PERMITIVARIANCE
OTHER (EXPLAIN)
PROJECT DESCRIPTION:. 6A' 1 � czr Ct6. ; �, o"I o;r v,n, � - Ok, vz
APPLICA NTIREPRESENTA TI VI
CONTACT PERSON NAME:
COMPANY:
ADDRESS
PHONE:
EMAIL:
APPLICANT'S SIGNATURE: To the best of my knowledge, this application is correct and
complete. I understand that 1, or my representative should be in attendance at the Design
Review Board meeting on at 6:00pm, to present this project. To the
best of my knowledge, l have met all applicable Overlay/Form Based Code conditions (Hwy
9/Deerfield, Birmingham, Crabapple, Rural Milton.)
Applicant: Date
Dear City of Milton Council & Board Members,
My name is Leang Heng. My wife Trang and my son Mason moved to Mi€ton 2..% years ago from
Cumming, GA. We fell in love with Milton and. purchased a property at 1463513irm1ngham Highway. We
li►ied in.a subdivision for many years and wanted a piece -of property that does not have. any HOA
restrictions. As we understand the importance of keeping. Milton beautiful,since the day we have
moved in, we have clone a number of home improvements, interior, exteriors,. arid. major landscape
renovations to give a nice %a.ppeal as people drive. by. We hired a landscape maintenance company that
constantly maintain our property.. My son Mason has ASD (Autism Spectrum Disorder) and he has a hard.
time registering and understanding people and noises. He does not respond to car horns or people
ye [ling at him. He doesn't even respond when we call his name. He's been seeking therapy at
Cobblestone Therapy Group 4 times a week to help with his autistic behavior and learning.disorder.
After analyzing the situation, we have decided to put up a six feet privacy fence a few weeks after we
moved in so that he can run around freely without any distractions. The privacy fence we put up 2.y� yrs.
ago served many purposes.
1. Keeps thy .so6 from running to the street when he hears a car come by
2. Area where my son can run freely without.distractions
3. Helps minimize traffic noise as cars comes flying through the corners
4: Help prevent vehicles:from losing control and running into the playarea
5. Create some privacy as people can see directly to the swimming pool in the, backyard without.
the.fence.
On a Winter afternoon in February of 2019, a vehicle slid on frozen ice and last control and slammed
into and took out 2 of o.ur Southern Magnolia trees in the area where we put up the privacy fence.
Fortunately, no one was hurt. Living on 6irmingham Highway is a bit dangerous and especially the road
in front of our home. People come speeding around the corner like they are at a racetrack. 1 stopped by
the Milton Police Department priorto purchasing the house to get a record of how many traffic
incidents occurred. in front of the house. The report showed that this particular section on Birmingham
Highway shows a high in.cident.rate. of speeding tickets.
The privacy fence we put up is for preventative measures to stop a bad accident from happening. We
value the City of Milton, but most. importa ntly we have to look after the safety of our family. Our
decision to put up the fence was pelm arily based on the factor of providing safety for rri.yson whos.
behavior is not like a normal 3 yr. old, Please understand our hardship in this. situation.
We have hired a landscape company to plant additional Southern Magnolia trees, Leyland cypress and
shrubs to block off as much fence visibility from the road. Please see attached photoswith rendering of
adding trees and shrubs along the fence. line.
Thank you for your time and. understanding: Please feel free to:contact me for any questions or concern.
I can be reached at 770-695-8839.
Sincerely,
i
t ll:
PIP
ft I
# "AI,4404
x
x�x
-k
�k
MILs
D
O
F.C•
x x x x �►
x---�
x
Cr
Z m x
x
u'
�o
T 7C
m
m !
No Text
No Text
No Text
4Vr a r. �a _� __ __ -_
dk{_Im
f
t
�
�!*
r
r
f` �1•
1.4
dk{_Im
f
--W
Polo
v
IV
FIE
4 �
rr
In.•�
or
f -
■
M A
r.
Li��.e:�
r,�"E •'t
G
R
�
HOME OF '
DESIGN REVIEW BOARD APPLICATION
MEETING DATE:
TYPE OF REVIEW: FINAL COURTESY
PROJECT INFORMATION
PROJECT NAME: �CAY;C�V1 [ r
PRO ECT ADDRESS-
---L )z
OVERLAY/FORM BASED CODE:
CASE #
HAS LDP/BUILDING PERMIT BEEN SUBMITTED FOR REVIEW?
PROJECT TYPE (CHECK ONE):
PROJECT DESCRIPTION:
YES NO X
SITE/LANDSCAPE
BUILDING
SALES TRAILER
DEMOLITION
ZONINGNSE PERMITARIANCE
OTHER (EXPLAIN)
(VIt
APPLICANTIREPRESENTATIVE INFORMATION
CONTACT PERSON NAME: Y Gk r, zzr, � .�
COMPANY:
ADDRESS: -)) r' q
PHONE: d y:�-1 FAX:
EMAIL: 'N
s0 -Lo rr
AGENDA #:
Y's bA C }c
I
APPLICANT'S SIGNATURE: To the best of my ntt
Knowledge, this application is correct and
complete. f understand that 1, or MY representative should be in attendance at the Desi
Review Board meeting on g
best of my knowledge, 1 have met all applicable O� rlcrylForm Basat 6:00pm, to ed Code'conditionsproject.
i t. To the
91Deerfield, Birmingham, Crabapple, Rural Milton.) Hwy
Dote r;,L 3L-
Ol 0
I
I
f� vk
e �$
gjf�!
C :r V _W
co M ILZ
LZ
irl a
AN �
�LL� SAD {sD'
Rte} -
SOL ' C
L
% \ sf� I�t_
-N3n,SV8 Him
lwyd[ ail' JL3w
aa%s ay:
mord
pp
a°
� N
Q C7t
W EA ❑sOl1
.!WOW
1�>-LA
=zr�
02
ac
—
z�
togC�
m
I
N� v E MH
n qI.-
II.- R
$
h
rn �
S��
F+�¢�=
jogs
vN
C2
mo
m_
P.
Me92
'
mmma
X5
SA
m Gv a
g � o
zrmn
I) m
C :r V _W
co M ILZ
LZ
irl a
AN �
�LL� SAD {sD'
Rte} -
SOL ' C
L
% \ sf� I�t_
-N3n,SV8 Him
lwyd[ ail' JL3w
aa%s ay:
mord
I
9 y s
awnwa ism
pp
a°
wn;Da
Q C7t
W EA ❑sOl1
.!WOW
1�>-LA
=zr�
02
ac
—
z�
m
rn �
y C m
vN
C2
mo
,,,n m
mmma
m Gv a
zrmn
I) m
I
9 y s
awnwa ism
Shubhangi Jangam
Fro.rrr: Brandy Lazzara rbrandylazzara.@yahoo;com�-
.5ent:. Wednesday; lune 30, 2021 9:25 AV
To: Shubhangi Jangam
S111f]jECt:
Grievance letter for fence
CAUTION: This email originated from outside your organization: E=xercise caution when opening attachments or clicking links;
especially from unknown senders.
Hi there; f wanted to give the board some insight why we put up that wood fence on aur property and Crabapple
Brook. We have. Iived in the neighborhood for eight years. Each year the traffic Street noise has progressively gotten.
worse. To the point u it being a constant background noise in our home and even waking us. up even with the use of
sound machines in our bedrooms.
When the new neighbors bought their home they wanted to remove the existing unsightly chain link fence and was also
concerned about the road noise. They did not have as much landscape as I so thought if webat
connected to each other that would help alleviate a littlh did a wood fence that
e }pit of the problem. We were hoping the wood would act fi
sound barrier. Our fence is constructed abut 25 feet from the back of our pool in our yard. it is extremel far ke a
Free marnville'and not seen from the road, The pictures that were first sent to us for the violation was our.nei hbors
entire fence fine that is obvious from the road. We have heavy landscaping both in front and back of aur fen:e. With it
being so close to aur pool and home it is not noticeable. We still !lave our original approved pool fence that: is
very close up on. our property line towards the Freemanville side. metal and
Our neighborhood NDA approved this fence and agreed with the increasing traffic noise. Out lot are:the only two that
have Frontage on freemanville so that is why they allowed us to da it especially since it was replacing a black chain -fink
fence on our neighbor's property, l do have recordings. of the street noise throughout different times of the da
anyone is 'interested in hearing It. Hopefullywith how landscaped our. fence is and the inability to see it from the road
will allow it to stay. We have news from that property, one of the reasons he sold was because of the street noise: we
could no longer take how loud it had gotten and in the long run for resale it would not be good.
Our buyers are well aware of what happens with the voting. on this fence and they'will be resp
They have pfans.to paint it Mack per the HOA request. onsible maintaining It.
We are asking the board for this fence to please stay. It is used for a sound barrier due to the unbearable increasing
sounds from the street. Please note by the pictures l sent from the Back of FreemanvifJe that if is not seen and one
painted black it.wili be camouflaged more into the landscape. We had no idea that we needed a permit for something
is
that is so close in on our property. Otherwise we would have gone through the proper channels to et it a g
fence company did not think we needed approval either because of where. it was on ourproperty,g ppraved. Our
Thank_you so much and we hope that we can come to: an agreement forthis fence to stay for both us and our neigh b
r? . ors.
Sent from myMaif for Android.
Y_
Ap �� y ■ ■ -
?1� r er-4
T le
x `
Ol
jit
a � �,. X r •. I f
�* • n't. ti.
WIN
We
0 AL
e
op
AL IL
R� h ti
AGENDA k
M I LTO N
111ArLi•111 if,:,
DESIGN REVIEW BOARD APPLICATION
MEETING DATE: A Vt y o. ,k 3'' ``
'T'Y'PE OF REVIEW: FINAL J COURTESY1� CASE #
PROJECT ,INFORMATION
PROJECT NAME:
PROJECT ADDRESS: __---
OVERLAYIFORM EASED CODE:
HAS LDPIBUILIDfNG PERMIT BEENT SUBMITTE?D FOR REVIEW? YES NO
PROJECT TYPE (CHECK ONE): SITEILANDSCAPE
BUILDING
SALES TRAILER
PROJECT DESCRIPTION:
DEMOLITION
ION
ZONLNGfUSE PERivffTNARIANCE
OTHER (EXPLAIN) ark
1,1
S t�
APPL7CAA 71REPRESENTATI VE INFORMATION l�d�
CONTACT PERSPN NAME � rf
COMPANY: D,,.►ytit�.
ADDRESS:
PHONE; FAX:
EMAIL:
APPLICANT'S SIGN TIRE: To rhe best of my knowledge. !his applicarior• is come pttCl complete. 1
and` r t t�. yra'present should be in attendance al rhe Design Review Board ;meeting or,
aPPIicable Uverldy.4,orm Based Code conditions (NNy 9IDeerfreld, Eirnringkart, Crabapple, RitralMikon.)
Applicant: �M Date
DE5IGIN REVIEW BOARD SUBMITTALREQUIREMEN'I'S
Please see the list below for materials required accar[ding Lo 'he tY;pe of review. Ail site plans and building plans shall bo drawn to
scale. Mounted drawings and sample boards showing material-.:, c0, m; etc. mai be brpught to the meeting fo your p;esenlalion.
l IK17 `boak;ets' arc a�ceptabic es well. Inrompletc
aubm1 t 16 widl ttot be accepted for rmien. If you have any questions, please oontaot Shubhu Jangam at GUS 242 2539,
SITE PLAt,,ML4NNASCAPE PL4A' REVlE1V 9 sets
Construction drawings, as required for LDP, including, bul not limited to:
3 Site location map(etlas map)
Aerial map (Google)
❑ Acreage, density, adjacent zonittgs
❑ Zoning amditioas (if any)
❑ Building footprint, square footage
❑ Grading, storm water plan, detendotdrnteatioa areas
❑ Location of streams, stream buffets
❑ Roadways, parking arras, dnvcwaya, sidewalks, bil:c paths, pedestrian paibs
❑ Dumpster enclosure detain/ loeatiest
❑ Landscape plan showing location, size and type of specimen and recamPer] sc trees, as well as other plantings
❑ Site lighting with photometric drawings .lighting fixture details
❑ Retain img wedl(s) location and material details
Fencing location and detail(s)
❑ HiLc rack location and detail
❑ IvlaiI kiosk location and detail (If applicable)
BUILDING REWEW--9 sets'
❑ Si to Iocahon map(atlas map)
❑ Atria] map (Google)
r1 Sire pl an
Date: June 25, 2021
To: City of Milton Permitting office.
From: Bob and Marshay Robers, owners of 13912 Tree Loft Road, Milton, GA
Re: Letter of Appeal — Variance Application for Fence Replacement
My wife and .l purchased 13912 Tree loft Road in Novernber 2024 and occupied: shortly.the.reafter. The
house needed work done, but the real estate market was hat, so we opted to do the.work ourselves
instead of ask ingthe sellers to address the myriad of issues before closing.
One of the issues was the condition of the original chain link fence at the rear of the property that was
installed many years ago. The fence was in disrepair, as trees had fallen over it on several occasions.
We consulted with the. Crabapple Brook HCA regarding replacement. The only conditionwas that it had
to be at least 6 feet tali to maintain the neighborhood's security; and painted black. to be. consistent with
the neighborhood. During that time, we also noticed the lack of privacy into our back yard. We have
small child.re.n and felt uncomfortable with them swim rning in the pool with exposure to Free manville
Road.
Therefore, we got a quote. from Accurate Fence company for a wooden privacy fence to replace the old
broken-down chain link. fence along our western perimeter that €aces. FreernanviIle Road. The fence vias
installed in January 2021.but could not be:painted far a period of 8 weeks: We received°a courtesy
notice from the city of Milton dated -February 5, 2021 stating that the fence construction required a
permit. I was surprised that fence replacement required a permit and even more disappointed that a
large reputable. company like Accurate Fence diel not make us aware of the. requirement, We have
prepared the accompanying materials to show the.location and views of the fence that has. since been
painted.
As you can see from the pictures take from across. Freemanville Road, it is important to note -that most
of the fence is not visible due to the following, reasons.
Height from the road — The. fence is not directly onthe property line but rather sits on the peak
of a ridge at the rear of our lot, which ranges fro.rn .12-24 feet above the street level.
Distance from the road The fence is positioned on the ridge., so the..distance from the .road
ranges. from 25 — 65 feet.
Cur land and the adjacent right of way along. the steep slope is heavily wooded, which makes
the fence vinuaIly invisible to anyone: driving on Freemanville Road.
My wife an.d 1 respectfully request a va ria n ce. that will allow us to keep this replacement fence in place
for the safety and security of our home and the: neighborhood:
Thank you for your consideration.
Sincerely,
Bob.Robers
0
L
�
Q�
0
U
1 n�
v +
7
•N 4
ai
rt;
N
❑:
`4—
❑ (U N
G C
a
o
Q)
0)
ry
W
L
p
�_
W
N
M LL-
N
Y
U
❑
}'
c
m
w
U
❑
A❑
m
N
vi
Q)
N
-0
as
Ll.
�
> a)
�
c�
U
o
�
� q}
w
�
°�',�
Lr�:,
�� a
-0
o°ani
m
❑
�
Q)
.�
Liz r
" ❑
Z
maT
-,
w
N
LL1
LL
>
m
=I
°C
-0
o ro U
.x
cr
L.L.
■
.m
U
. U vim,
0
I
C7
N
)tn ce
4
r
c
DEMOTES GvnER
EP
DENOM EDGE OF PAWHG:
TO
DENOTM TOP OF WALL
ONMan
Sarm or WALL
--
u —
DENOTES FENCE
RCP
DDMDiES REIHFORC£O CONCRETE PIPE
CLIP
DENpTfS COpRUG7£j] HEYAL PoPE
PA
DENOTES POWF]N POLE
LP
DENOTES LIGMT PGCE
!N
A
DENOTES cur VME
P ---
.P—P—
P —
DENDTES 9OMFlt LW NE
Pat
d
DFHOT6 POYrtA fiETER
M
it
pEtiOTFS fOv1ER 5101E
q
E1
DENOTf3 7E CaNDLnoN
REMDIC+ lEii DDN
pl
e
META
OEINDLES CJLS f.11W
gy
�
pElicTE:S S9V.5 YAI.Vi
dal
O�NRTES S L#aE H m-
wV
�t
o-triurrs xvr7ER lefTFR
RE
fN
FLs'0 M[r
W
ODOM AIOWTORING WFJ L
OE7 kiFA V L
Dow= WWnON Box
Df•
c-15 DRIP
—s—s—
Downs
F�OUs WER WDE
w,"
•n
GacriS
+ l
- o• I !
,"AR ,
JJ F70 I S
I
I + b� Q V'� >• 1
SURVEY N(
t. SR7Ra! SEIVEIL.:Si1YrARl' S(WF71 AHO OLHEft BIAEFD U@ftg5
WPAYE WF PAK.D OR COYfAFD WADI. Ti IE LOC N, A
ill. Uf1ERIFT AS SNOM'H HEAE'p!T AIA£ aim OR
AOL GROW Sa�CT;RE'g AHD RECORp DRAN7rw9
PRYAOM TO Tii[ SOIGR1Dq, L6C1119 OF SWR
` 1111LITg.a Wy PART PROw1 NA6 nMOE
5110iTa NFRED?L
i\/) n amwo sMIA.
0 HOES
ANC t✓CgAa, PEEASE CNl A1.E IAG1L LAMB' PPIONOEA6,
o„ c�+P�"""R'a o►alEs�aM. � AK.
cuAwENI >+� scvL�l HAr o
` 3. TMLi: THAF MAS PAEPAREp FVR INE �IGJgIY[ LKi OP F12
PEASW. 7':%VHS OR ENTITY HWEO HLREOM. INl9 PLM WER
L Has PxniW m " uMMAAp� pf p. P OR varm
\\\\ M1Tl101if TME EkPlf[.S N[CF7¢TfrygATIDPi DF TME SVIhv=
lNfABND SLICk PDI9OD{ PF3gOH5 OR FriILTY.
4, ne PIEl.O OtITA woM nceca nfs PIAT f& EEISID IY.tS cADLLrim
8Y AHD -,D4 TIpVyE�[ 7H6 PIAT AVS OlkT'a PJLSts w R
L7.O911RE ANE7 l5 rWNR h7 ASE >17TLNfl OR
OW F= W
AAL:dIG IOYCOM fiLL 51A� fWE
a eTwHw sMwrM r wuruTm Twcu i "mm vio n
FkNI R s11gLE AIRf57EPC 069MYRIioM,
� 46�id�1R1L91LMro1GitllWmlF iOwlc
gg �, FHs MAI IS HOT WKNOM EDR PECg y,40,
IT1�
R
r3 � goy
sg.
REFERENCE MATERIAL
1. WARYLVOY O® IM EAYOR OF
COMSfOPMER KIM AMD F mmum KIRK
DIM BOOK 67257 PAGE 64
FVETOk COL1NTr, OEDROTA RECORDS
80B.79' TO S.W. I i
R OFt BASNEI7
D (50� INGRM I
EGRESS AND tM `
W(PRNATE
m' 15' Or 30• �.
SC" W POU
7Aia pr,gi,�• IS Aloe A.COIW
A� o Fidslui £And Ana as
FKRLM
H"Wd Ma�—
Na PMT k o Gcoepfa HLS �?ed6
�or+aoTlan al lAa dfem8er 54AaS0O
land Plolfed. JOBNR3942B
TOTAL AREI1- 1.657* ACRES
OR 46,=* SOST.
13912 M LOFT ROAD
LAT 14. PPASE H
CRASAPPL.E BRD0K
LAND Lor a13
DISTRICT 2140. SCUON No
FULTOH COi1MLh'
GEORGL4
itr ;
•!tj; .
tIti/,ate
�f
r3 � goy
sg.
REFERENCE MATERIAL
1. WARYLVOY O® IM EAYOR OF
COMSfOPMER KIM AMD F mmum KIRK
DIM BOOK 67257 PAGE 64
FVETOk COL1NTr, OEDROTA RECORDS
80B.79' TO S.W. I i
R OFt BASNEI7
D (50� INGRM I
EGRESS AND tM `
W(PRNATE
m' 15' Or 30• �.
SC" W POU
7Aia pr,gi,�• IS Aloe A.COIW
A� o Fidslui £And Ana as
FKRLM
H"Wd Ma�—
Na PMT k o Gcoepfa HLS �?ed6
�or+aoTlan al lAa dfem8er 54AaS0O
land Plolfed. JOBNR3942B
TOTAL AREI1- 1.657* ACRES
OR 46,=* SOST.
13912 M LOFT ROAD
LAT 14. PPASE H
CRASAPPL.E BRD0K
LAND Lor a13
DISTRICT 2140. SCUON No
FULTOH COi1MLh'
GEORGL4
DESIGN REVIEW BOARD APPLICATION
MEETING DATE: _____August 3rd___________________________________________________
TYPE OF REVIEW: FINAL _____ COURTESY _____ CASE # _________________________
PROJECT INFORMATION
PROJECT NAME:____Crabapple Beer & Wine Market____________________________________
PROJECT ADDRESS: ____12595 Crabapple Road_____________________________
OVERLAY/FORM BASED CODE: ___Crabapple T4_______________________________
HAS LDP/BUILDING PERMIT BEEN SUBMITTED FOR REVIEW? YES ____ NO______
PROJECT TYPE (CHECK ONE): SITE/LANDSCAPE __X_________
BUILDING __Reno_________
SALES TRAILER _________
DEMOLITION ________
ZONING/USE PERMIT/VARIANCE ___________
OTHER (EXPLAIN) _________________________
PROJECT DESCRIPTION: __Renovation of 1920’s house into beer & wine market___
___________________________________________________________________________________
APPLICANT/REPRESENTATIVE INFORMATION
CONTACT PERSON NAME: ___Robert Forrest_______
COMPANY:___Crabapple Stone House LLC___________________________
ADDRESS: ___12595 Crabapple Road, Milton, GA 30004____________________
PHONE: ___404-514-8575___ FAX: _________________________________
EMAIL: _____rob@stonewalkco.com_________________________________________
APPLICANT’S SIGNATURE: To the best of my knowledge, this application is correct and
complete. I understand that I, or my representative should be in attendance at the Design
Review Board meeting on ________________________, at 6:00pm, to present this project. To the
best of my knowledge, I have met all applicable Overlay/Form Based Code conditions (Hwy
9/Deerfield, Birmingham, Crabapple, Rural Milton.)
Applicant: __ __ Date 6/15/21
AGENDA #:
DESIGN REVIEW BOARD SUBMITTAL REQUIREMENTS
Please see the list below for materials required according to the type of review. All site plans and building plans
shall be drawn to scale. Mounted drawings and sample boards showing materials, colors, etc. may be brought
to the meeting for your presentation. Please fold all large drawings down to 8 ½” by 11” size, and collate all
materials. 11x17 ‘booklets’ are acceptable as well. Incomplete submittals will not be accepted for review.
If you have any questions, please contact Shubha Jangam at 678 242 2539.
SITE PLAN/LANDSCAPE PLAN REVIEW—9 sets
Construction drawings, as required for LDP, including, but not limited to:
Site location map(atlas map)
Aerial map (Google)
Acreage, density, adjacent zonings
Zoning conditions (if any)
Building footprint, square footage
Grading, storm water plan, detention/retention areas
Location of streams, stream buffers
Roadways, parking areas, driveways, sidewalks, bike paths, pedestrian paths
Dumpster enclosure detain/ location
Landscape plan showing location, size and type of specimen and recompense trees, as well as other plantings
Site lighting with photometric drawings , lighting fixture details
Retaining wall(s) location and material details
Fencing location and detail(s)
Bike rack location and detail
Mail kiosk location and detail (If applicable)
BUILDING REVIEW—9 sets
Site location map(atlas map)
Aerial map (Google)
Site plan
Colored renderings of all facades
Line drawings of all elevations with heights, and materials labled
Locations of roof top equipment, satellite dishes, antennas,vents,exhausts (as applicable)
Site line study showing that rooftop units are not visible from adjoining roads (if applicable)
Location, details of lighting fixtures
Dumpster enclosure details (If applicable)
Mail kiosk details (If applicable)
Sample board showing materials, colors, etc. (Bring to the meeting)
SALES TRAILER—9 sets
Site location map(atlas map)
Aerial map (Google)
Site plan showing location of sales trailer, setbacks, parking, etc.
Landscape plan
Picture and/or construction details of trailer
DEMOLITION REVIEW—9 sets
Site location map(atlas map)
Aerial map (Google)
Site plan, indicating structure(s) to be demolished and the location of specimen trees, erosion control, tree save
fencing
Pictures of structure(s) to be demolished
VARIANCE/USE PEMIT/REZONING—9 sets
Site location map(atlas map)
Aerial map (Google)
Acreage, density, existing site conditions
Conceptual site plan showing location of buildings, detention areas, streams/stream buffers, specimen trees, roads,
parking, driveways, sidewalks, etc.
For commercial/multifamily/townhome uses: conceptual renderings of buildings, square footages
For sign variance: site line study showing view of signs from adjacent roads
For stream buffer variance: mitigation plan
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.