HomeMy WebLinkAboutAgenda Packet - DRB - 02/01/2022AGENDA
DESIGN REVIEW BOARD MEETING
Council Chambers
February 1, 2022
6:00pm
1)Call to order / Pledge of Allegiance
2)Introduction of Board Members
3)Approve / Amend the Agenda
4)Approval of Meeting Minutes
•January 4, 2022
5)Demolition of Structures
a.Location: 16175 Birmingham Hwy
Applicant: Kevin Finn
Request(s):
•Demolish the existing house
b.Location:15650 Birmingham Highway
Applicant: Scott Reece
Request(s):
•Demolish existing residence, shed, metal building, block building.
c.Location: 465 Hickory Flat Road
Applicant: Scott Reece
Request(s):
•Demolish existing residence, asphalt driveway.
d.Location: 2550 Mountain Road
Applicant: Scott Reece
Request(s):
•Demolish existing residence, barn, sheds, gazebo, concrete pads
asphalt and gravel driveway.
6)Courtesy Reviews
a.V22-02, 14225 Birmingham Highway
Applicant: Kassam Shafik
Request(s):
•To allow a proposed guesthouse to be located in the side-yard
(Sec. 64-1598(b)(1)).
b.V22-03, 355 Cox Road
Applicant: Marc Rosenfeld, Bullseye Properties
Request(s):
•To allow the existing accessory structure in AG-1 zoned property to
remain 4 feet inside the side-yard setback (Section 64-416 (c)(1)).
c.U22-01/VC22-01, 13275 Cogburn Road
Applicant: FH Schindler, Inc. d/b/a Mayfield Oaks Senior Living
Request(s):
•Use Permit for “Alternative Senior Housing”, Sec. 64-1844 and a
three-part concurrent variance to:
1.To allow 4 handicapped spaces to be in the front of the
house (Sec. 64-1844 (2)(f)(1);
2.To reduce a 50’ undisturbed buffer & 10’ improvement
setback on northern line to 25’ (Article 20, Sec. 2.3.2.a); and
3.To reduce a 50’ undisturbed rear buffer to 30’ (Article 20, Sec.
2.3.2.a).
7)Final reviews
a.Town Center East, 850 Mayfield Road
Request(s):
•Phase 2 of project, building to match phase 1 (Reviewed earlier in
December 2021 DRB meeting)
8)New Business
a.Reminder February 15 training at 5 pm to 6 pm
9)Old business
10)Adjournment
ACTION REPORT
DESIGN REVIEW BOARD MEETING
Council Chambers
January 4, 2022
6:00pm
1) Call to order / Pledge of Allegiance
Members Present: Reid Casey, Lee Collins, Charlie Roberts, Ken Warlick, Doug
Hene, Casey Robinson
2) Introduction of Board Members and Election of officers
a. Elect a Chair for the Design Review Board
Nominate Charlie Roberts to the Chair: Reid Casey
2nd: Lee Collins
Vote: 6-0 (Approved)
b. Elect a Vice Chair for the Design Review Board
Nominate Reid Casey to the Vice Chair: Lee Collins
2nd: Charlie Roberts
Vote: 6-0 (Approved)
3) Approve / Amend the Agenda
Motion to Approve the Agenda: Lee Collins
2nd: Reid Casey
Vote: 6-0 (Approved)
4) Approval of Meeting Minutes
Motion to Approve December 7, 2021, meeting minutes: Reid Casey
2nd: Lee Collins
Vote: 6-0 (Approved)
5) Demolition of structures
a. Location: 1240 Mayfield Road – Heatherton Subdivision
Applicant: David Edwards, NPC-English, LLC
Request(s):
• Demolish a house and accessory structures on the property.
Motion to Approve: Reid Casey
2nd: Doug Hene
Vote: 6-0 (Approved)
b.Location:14985 Freemanville Road – The Meadows Parkside
Applicant: Greg Amico, Southern Homes & Restoration Group
Request(s):
•Demolish existing structures on the site.
Motion to Approve: Ken Warlick
2nd: Reid Casey
Vote: 6-0 (Approved)
c.Location: 13400 Providence Road
Applicant: Brad Collins
•Demolish existing house and barn on the site.
Motion to Approve: Ken Warlick
2nd: Reid Casey
Vote: 6-0 (Approved)
6) Courtesy Reviews
a.V22-01, 505 Dorris Road
Applicant: Denise Brown
Request(s):
•To allow the existing accessory structure in R-2 zone property to
remain 2 feet inside the side-yard setback and allow interior
improvements (Sec. 64-462(c)(1)).
Comments:
Recommends approval.
b.V22-02, 14225 Birmingham Highway
Applicant: Kassam Shafik
Request(s):
•To allow a proposed guesthouse to be located in the side-yard
(Sec. 64-1598(b)(1)).
Comments:
Hold for 30 days to revise the elevations of the accessory building.
Improve architecture and landscape plan
Motion to Hold for 30 days: Charlie Roberts
2nd: Lee Collins
Vote: 6-0 (Approved)
c.V22-03, 355 Cox Road
Applicant: Marc Rosenfeld, Bullseye Properties
Request(s):
• To allow the existing accessory structure in AG-1 zoned property to
remain 4 feet inside the side-yard setback (Section 64-416 (c)(1)).
Comments:
Hold for 30 days to provide updated elevation of the building.
Motion to Hold for 30 days: Lee Collins
2nd: Doug Hene
Vote: 6-0 (Approved)
d. V22-04, 1310 Rolling Links Drive
Applicant: Rick McDermott, Aqua Blue Pools
Request(s):
• To allow the lot coverage for an AG-1 zoned property that fronts a
private street to go from 25 percent to 28 percent. (Sec. 64-
1141(d)(1)(a)).
Comments:
Recommends approval.
e. V22-05, 560 Glen Hampton Drive
Applicant: Rick McDermott, Aqua Blue Pools
Request(s):
• To allow a pool, pool deck and a fire pit to encroach into 75-foot
impervious setback (Section 20-426(2)).
Comments:
Recommends approval.
7) Final reviews
a. Building #2 of Milton Point at Broadwell Boulevard
i. Original DRB approval April 2019 (see attached Documents)
ii. Revised DRB approval for Building #1 (November 2021)
iii. Revised DRB submittal for Building #2 (see bookmark)
Motion to Approve: Charlie Roberts
2nd: Casey Robinson
Vote: 6-0 (Approved)
8) New Business
a. Reminder that stipend is available for Board members
b. Training to be provided to the Board members
9) Old business
a. Site visit discussion continued
10)Adjournment
DESIGN REVIEW BOARD APPLICATION
MEETING DATE: ________________________________________________________________
TYPE OF REVIEW: FINAL _____ COURTESY _____ CASE # _________________________
PROJECT INFORMATION
PROJECT
NAME:___________________________________________________________________
PROJECT ADDRESS:
_______________________________________________________________
OVERLAY/FORM BASED CODE: ____________________________________________________
HAS LDP/BUILDING PERMIT BEEN SUBMITTED FOR REVIEW? YES ____ NO______
PROJECT TYPE (CHECK ONE): SITE/LANDSCAPE ___________
BUILDING ___________
SALES TRAILER _________
DEMOLITION ________
ZONING/USE PERMIT/VARIANCE ___________
OTHER (EXPLAIN) _________________________
PROJECT DESCRIPTION:
___________________________________________________________
________________________________________________________________________________
___
APPLICANT/REPRESENTATIVE INFORMATION
CONTACT PERSON NAME:
_________________________________________________________
COMPANY:_______________________________________________________________________
_
ADDRESS:
________________________________________________________________________
PHONE: ___________________________________ FAX:
_________________________________
EMAIL:
___________________________________________________________________________
APPLICANT’S SIGNATURE: To the best of my knowledge, this application is correct and complete.
I understand that I, or my representative should be in attendance at the Design Review Board
meeting on ________________________, at 6:00pm, to present this project. To the best of my
AGENDA #:
Febuary 1,2022
Kevin Finn
16175 Birmingham Hwy, Alpharetta, GA 30004
Need to Demo this house so we can build a new one
Kevin Finn
N/A
11620 folia circle alpharetta ga 30005
(770)402-3559
Kevinmfinn@gmail.com
Febuary 1,2022
knowledge, I have met all applicable Overlay/Form Based Code conditions (Hwy 9/Deerfield,
Birmingham, Crabapple, Rural Milton.)
Applicant:__ __ Date 1/18/22
DESIGN REVIEW BOARD SUBMITTAL REQUIREMENTS
Please see the list below for materials required according to the type of review. All site plans and building plans shall be
drawn to scale. Mounted drawings and sample boards showing materials, colors, etc. may be brought to the meeting for
your presentation. Please fold all large drawings down to 8 ½” by 11” size, and collate all materials. 11x17 ‘booklets’ are
acceptable as well. Incomplete submittals will not be accepted for review. If you have any questions, please
contact Shubha Jangam at 678 242 2539.
SITE PLAN/LANDSCAPE PLAN REVIEW—9 sets +$350 fee
Construction drawings, as required for LDP, including, but not limited to:
Site location map(atlas map)
Aerial map (Google)
Acreage, density, adjacent zonings
Zoning conditions (if any)
Building footprint, square footage
Grading, storm water plan, detention/retention areas
Location of streams, stream buffers
Roadways, parking areas, driveways, sidewalks, bike paths, pedestrian paths
Dumpster enclosure detain/ location
Landscape plan showing location, size and type of specimen and recompense trees, as well as other plantings
Site lighting with photometric drawings , lighting fixture details
Retaining wall(s) location and material details
Fencing location and detail(s)
Bike rack location and detail
Mail kiosk location and detail (If applicable)
BUILDING REVIEW—9 sets + $350 fee
Site location map(atlas map)
Aerial map (Google)
Site plan
Colored renderings of all facades
Line drawings of all elevations with heights, and materials labled
Locations of roof top equipment, satellite dishes, antennas,vents,exhausts (as applicable)
Site line study showing that rooftop units are not visible from adjoining roads (if applicable)
Location, details of lighting fixtures
Dumpster enclosure details (If applicable)
Mail kiosk details (If applicable)
Sample board showing materials, colors, etc. (Bring to the meeting)
SALES TRAILER—9 sets
Site location map(atlas map)
Aerial map (Google)
Site plan showing location of sales trailer, setbacks, parking, etc.
Landscape plan
Picture and/or construction details of trailer
DEMOLITION REVIEW—9 sets
Site location map(atlas map)
Aerial map (Google)
Site plan, indicating structure(s) to be demolished and the location of specimen trees, erosion control, tree save fencing
Pictures of structure(s) to be demolished
VARIANCE/USE PEMIT/REZONING—9 sets
Site location map(atlas map)
Aerial map (Google)
Site pictures, Acreage, density, existing site conditions
Variance Appeal letter copy
Conceptual site plan showing location of buildings, detention areas, streams/stream buffers, specimen trees, roads, parking,
driveways, sidewalks, etc.
For commercial/multifamily/townhome uses: conceptual renderings of buildings, square footages
For sign variance: site line study showing view of signs from adjacent roads
For stream buffer variance: mitigation plan
Page is too large to OCR.
Page is too large to OCR.
AGENDA #
MEETING DATE:
TYPE OF REVIEW: ❑FINAL ❑COURTESY
Project Name: Clarence Riley
Project Address: #15650 Birmingham Highway
Overlay/form Based Code: Rural Milton
Has LDP/Building Permit been submitted for review? Yes ❑ No �
Project Type (Check One):
❑ Site/landscape ❑ Building ❑ Sales Trailer ® Demolition
❑ Rezoning/Use Permit/Variance CASE #
❑ Other (Explain)
Project Description: Demolition of existing residence, shed, metal building, block building,
and gravel driveway.
Contact Person Name: Scott D. Reece
Company: Brumbelow- Reese
And Associates
Address: 13685 Highway 9, Milt n, GA 30004
Phone:
770-475-6817
Fax:
Email: brassinc@comcast.net
770-569-4948
Applicant's Signature: To the best of my knowledge, this application is correct and complete.
understand that I, or my representative should be in attendance at the Design Review Board
meeting on , at 6:00 p.m. to present this project. To the best of my
knowledge, I have met all applicable Overlay/Form Based Code conditions (Hwy 9/Deerfield,
Birmingham, Crabapple, Rural Milton.)
Applicant
Date
Page 1 -DRB Submittal Application WWW.cityofmiltonga.US
Revision Date: 09.2018
Page 2 – DRB Submittal Application
DESIGN REVIEW BOARD SUBMITTAL REQUIREMENTS
Please see the list below for items required according to the type of review. All site plans
and building plans shall be drawn to scale. Mounted drawings and sample boards showing
materials, colors, etc. should be brought to the meeting for your presentation. Please fold
all large drawings down to 8.5 x11 size, and collate all materials. 11x17 ‘booklets’ are accept-
able as well. Incomplete submittals will not be accepted for review. If you have any questions,
please contact Angela Rambeau at 678.242.2539. Please deliver the application and packets
to Community Development, located at Milton City Hall, 2006 Heritage Walk, Milton, GA 30004.
SITE PLAN/LANDSCAPE PLAN REVIEW—9 sets
Construction drawings, as required for LDP, including, but not limited to:
Site location map (atlas map)
Aerial map (Google)
Acreage, density, adjacent zonings
Zoning conditions (if any)
Site plan showing building footprint, square footage
Grading, storm water plan, detention/retention areas
Location of streams, stream buffers
Roadways, parking areas, driveways, sidewalks, bike paths, pedestrian paths
Dumpster enclosure location and detail
Landscape plan showing location, size and type of specimen and recompense trees,
as well as other plantings
Site lighting with photometric drawings , lighting fixture details
Retaining wall(s) location, material details, and height
Fencing location and detail(s)
Bike rack location and detail
Mail kiosk location and detail (if applicable)
BUILDING REVIEW—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan
Colored renderings of all facades
Line drawings of all elevations with heights, and materials labled
Locations of roof top equipment, satellite dishes, antennas, vents, exhausts (as applicable)
Site line study showing that rooftop units are not visible from adjoining roads (if applicable)
Location, details of lighting fixtures
Dumpster enclosure details (If applicable)
Mail kiosk details (If applicable)
Sample board showing materials, colors, etc. (Bring to the meeting)
www.cityofmiltonga.us
Revision Date: 09.2018
Page 3 – DRB Submittal Application
SALES TRAILER—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan showing location of sales trailer, setbacks, parking, etc.
Landscape plan
Picture and/or construction details of trailer
DEMOLITION REVIEW—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan, indicating structure(s) to be demolished and the location of specimen trees,
erosion control, tree save fencing
Pictures of structure(s) to be demolished
VARIANCE/USE PEMIT/REZONING—9 sets
Site location map (atlas map)
Aerial map (Google)
Acreage, density, existing site conditions
Conceptual site plan showing location of buildings, detention areas,
streams/stream buffers, specimen trees, roads, parking, driveways, sidewalks, etc.
For commercial/multifamily/townhome uses: conceptual renderings of buildings,
square footages
For sign variance: site line study showing view of signs from adjacent roads
For stream buffer variance: mitigation plan
www.cityofmiltonga.us
Revision Date: 09.2018
BIRMINGHAM HIGHWAY
Atlanta Metropolitan Series October 2021 to October 2022
Copyright 2021 Aero Surveys of Ga., Inc.
Reproduced by Permission
LOCATION MAP - 1"=1000'±
SITE
;i
to&A Mf9MOON NU. 1Wl fA°C KUKT.
44.
I✓oL AQ6fi�1^ W►ur�o.J
A
r
SCALE: APPROVED BY: DRAWN BY vy.
DATE. 1+,+�t REVISED
DRAWING NUMBF3t
1007
q - a�r
Al
J
3
GENERAL NOTES'
!U . m —rce c�m'mm ate— i so
(11 u'a io wrui m[ ren Wp ws oma w5w-Mm oenwac mrutt
lll r� r ms ®.' ua'tium ma aw.m.w w m» v s.w.wre nna ar rmr
lY ou[ w us au. moos nc n i-vo.'mr_ar�� rce
ln) �mxa� nrmrtmor a ttauewm rae zww.w ssimc.e rmmcrs rm ns mr.
N n2
;R smHr emmna's m s..na. uvn amps
i
LEGEND
/PS- LA1V PW SEi 'MR REHM14)
IPF (l/P" REB1R) PIN KK, a,)
OOF WAY
PP POWER - µ£R NLE
WI - OKFHGO {NHES
FEN
L. L --- UNp LOT
CACP -- CMRM EO META TF
RCP --- FEINFOAVN CMCRElE PIPE
CB --- ROP Hp SIN
s pFM W�
551tl1 ---51MTAFY MANHOLE
c.A.o. --- AL50 KNOWN
AS
WN As
p.0. i. --- OIDARTMFM OF iRWSPMIAIRM
FP __- FUC POIE
AS -BUILT SURVEY PREPARED FDR:
EE: ice=
NO.: 2096
NOW OR fORNERLY
/FAH L N aA PPil MEDRIM
GEFG 9O. p( 28991. PAGhE X3
30 0 30 80 83
GRAI'MC SCALE
N41KE RAWLINGS
Prepared B/
REGISTERED LAND SURVEYORS, INC
580 West CrasaHlLe Rood
Suite 204
Roswell, Georgio 30075
(770) 998-7676
OPRAEx r. rx`wo aims rmewm
OEEO BJm( ].R92 PH£ Rf
PWo-eCT ITME/NO.
355 COX ROAD
BEING IN LAND LOT 1142 of the 2nd 0157INCT, 2nd SECTION
FULTON COUNTY. GEORO(A
REVISIONS
NOW ON {CPIIERLY
WLW !9N!&E fl4n/19f GIXMJ(
a
NO.
S®1
OF i SHEET
Page is too large to OCR.
Page is too large to OCR.
AGENDA #
MEETING DATE: TYPE OF REVIEW: ❑FINAL ❑COURTESY
Project Name: H. Smith Holdings, LLC_
Project Address: #465 Hickory Flat Road
Overlay/form Based Code:
Rural Milton
Has LDP/Building Permit been submitted for review? Yes ❑ No Q
Project Type (Check One):
❑ Site/landscape ❑ Building ❑ Sales Trailer ® Demolition
❑ Rezoning/Use Permit/Variance
❑ Other (Explain) _
Project Description: Demolition of existing residence, and asphalt driveway.
Contact Person Name: SCOtt ®. Reece
Company:
Brumbelow- Reese And Associates
- ----- - - - - ---- ---- --- -------- ---------- ------------
Address: 13685 Highway 9, Milton, GA 30004
Phone: 770-475-6817
Fax: 770
Email: brassinc@comcast. net
-569-4948
Applicant's Signature: To the best of my knowledge, this application is correct and complete.
understand that I, or my representative should be in attendance at the Design Review Board
meeting on at 6:00 p.m. to present this project. To the best of my
knowledge, I have met all applicable Overlay/Form Based Code conditions (Hwy 9/Deerfield,
Birmingham, Crabapple, Rural Milton.)
Applican
Page 1 -DRB Submittal Application WWW.cityofmiltonga.US
Revision Date: 09.2018
Page 2 – DRB Submittal Application
DESIGN REVIEW BOARD SUBMITTAL REQUIREMENTS
Please see the list below for items required according to the type of review. All site plans
and building plans shall be drawn to scale. Mounted drawings and sample boards showing
materials, colors, etc. should be brought to the meeting for your presentation. Please fold
all large drawings down to 8.5 x11 size, and collate all materials. 11x17 ‘booklets’ are accept-
able as well. Incomplete submittals will not be accepted for review. If you have any questions,
please contact Angela Rambeau at 678.242.2539. Please deliver the application and packets
to Community Development, located at Milton City Hall, 2006 Heritage Walk, Milton, GA 30004.
SITE PLAN/LANDSCAPE PLAN REVIEW—9 sets
Construction drawings, as required for LDP, including, but not limited to:
Site location map (atlas map)
Aerial map (Google)
Acreage, density, adjacent zonings
Zoning conditions (if any)
Site plan showing building footprint, square footage
Grading, storm water plan, detention/retention areas
Location of streams, stream buffers
Roadways, parking areas, driveways, sidewalks, bike paths, pedestrian paths
Dumpster enclosure location and detail
Landscape plan showing location, size and type of specimen and recompense trees,
as well as other plantings
Site lighting with photometric drawings , lighting fixture details
Retaining wall(s) location, material details, and height
Fencing location and detail(s)
Bike rack location and detail
Mail kiosk location and detail (if applicable)
BUILDING REVIEW—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan
Colored renderings of all facades
Line drawings of all elevations with heights, and materials labled
Locations of roof top equipment, satellite dishes, antennas, vents, exhausts (as applicable)
Site line study showing that rooftop units are not visible from adjoining roads (if applicable)
Location, details of lighting fixtures
Dumpster enclosure details (If applicable)
Mail kiosk details (If applicable)
Sample board showing materials, colors, etc. (Bring to the meeting)
www.cityofmiltonga.us
Revision Date: 09.2018
Page 3 – DRB Submittal Application
SALES TRAILER—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan showing location of sales trailer, setbacks, parking, etc.
Landscape plan
Picture and/or construction details of trailer
DEMOLITION REVIEW—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan, indicating structure(s) to be demolished and the location of specimen trees,
erosion control, tree save fencing
Pictures of structure(s) to be demolished
VARIANCE/USE PEMIT/REZONING—9 sets
Site location map (atlas map)
Aerial map (Google)
Acreage, density, existing site conditions
Conceptual site plan showing location of buildings, detention areas,
streams/stream buffers, specimen trees, roads, parking, driveways, sidewalks, etc.
For commercial/multifamily/townhome uses: conceptual renderings of buildings,
square footages
For sign variance: site line study showing view of signs from adjacent roads
For stream buffer variance: mitigation plan
www.cityofmiltonga.us
Revision Date: 09.2018
HICKORY FLAT ROAD
Atlanta Metropolitan Series October 2021 to October 2022
Copyright 2021 Aero Surveys of Ga., Inc.
Reproduced by Permission
LOCATION MAP - 1"=1000'±
SI
T
E
"per`
,F
t 'Fei
i ` �
•� rte,.
.� . a
n�
Page is too large to OCR.
Page is too large to OCR.
AGENDA #
MEETING DATE:
TYPE OF REVIEW: ❑FINAL ❑COURTESY
Project Name:
#2550 Mt
Christopher D. Jann &Lauren E. Jann
Project Address: .ounain Road
Overlay/form Based Code: Rural Milton
Has LDP/Building Permit been submitted for review? Yes ❑ No
Project Type (Check One):
❑ Site/landscape El Building El SalesTrailer ® Demolition
❑ Rezoning/Use Permit
/Variance CASE #
❑ Other (Explain)
Project Description: Demolition of existing residence, barn, sheds, gazebo, concrete pads,
asphalt & gravel driveways.
Contact Person Name: Scott D. Reece
Company: Brumbelow- Reese And Associates
Address: 13685 Highway 9, Milton, GA 30004
Phone: 770-475-6817
Email: brassinc@comcast.net
Applicant's Signature: To the best of my knowledge, this application is correct and complete.
understand that I, or my representative should be in attendance at the Design Review Board
meeting on , at 6:00 p.m. to present this project. To the best of my
knowledge, I have met all applicable Overlay/Form Based Code conditions (Hwy 9/Deerfield,
Birmingham, Cripple, Rural Milton.)
Applicant:
Page 1 -DRB Submittal Application
Date
www.cityofmiltonga.us
Revision Date: 09.2018
Page 2 – DRB Submittal Application
DESIGN REVIEW BOARD SUBMITTAL REQUIREMENTS
Please see the list below for items required according to the type of review. All site plans
and building plans shall be drawn to scale. Mounted drawings and sample boards showing
materials, colors, etc. should be brought to the meeting for your presentation. Please fold
all large drawings down to 8.5 x11 size, and collate all materials. 11x17 ‘booklets’ are accept-
able as well. Incomplete submittals will not be accepted for review. If you have any questions,
please contact Angela Rambeau at 678.242.2539. Please deliver the application and packets
to Community Development, located at Milton City Hall, 2006 Heritage Walk, Milton, GA 30004.
SITE PLAN/LANDSCAPE PLAN REVIEW—9 sets
Construction drawings, as required for LDP, including, but not limited to:
Site location map (atlas map)
Aerial map (Google)
Acreage, density, adjacent zonings
Zoning conditions (if any)
Site plan showing building footprint, square footage
Grading, storm water plan, detention/retention areas
Location of streams, stream buffers
Roadways, parking areas, driveways, sidewalks, bike paths, pedestrian paths
Dumpster enclosure location and detail
Landscape plan showing location, size and type of specimen and recompense trees,
as well as other plantings
Site lighting with photometric drawings , lighting fixture details
Retaining wall(s) location, material details, and height
Fencing location and detail(s)
Bike rack location and detail
Mail kiosk location and detail (if applicable)
BUILDING REVIEW—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan
Colored renderings of all facades
Line drawings of all elevations with heights, and materials labled
Locations of roof top equipment, satellite dishes, antennas, vents, exhausts (as applicable)
Site line study showing that rooftop units are not visible from adjoining roads (if applicable)
Location, details of lighting fixtures
Dumpster enclosure details (If applicable)
Mail kiosk details (If applicable)
Sample board showing materials, colors, etc. (Bring to the meeting)
www.cityofmiltonga.us
Revision Date: 09.2018
Page 3 – DRB Submittal Application
SALES TRAILER—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan showing location of sales trailer, setbacks, parking, etc.
Landscape plan
Picture and/or construction details of trailer
DEMOLITION REVIEW—9 sets
Site location map (atlas map)
Aerial map (Google)
Site plan, indicating structure(s) to be demolished and the location of specimen trees,
erosion control, tree save fencing
Pictures of structure(s) to be demolished
VARIANCE/USE PEMIT/REZONING—9 sets
Site location map (atlas map)
Aerial map (Google)
Acreage, density, existing site conditions
Conceptual site plan showing location of buildings, detention areas,
streams/stream buffers, specimen trees, roads, parking, driveways, sidewalks, etc.
For commercial/multifamily/townhome uses: conceptual renderings of buildings,
square footages
For sign variance: site line study showing view of signs from adjacent roads
For stream buffer variance: mitigation plan
www.cityofmiltonga.us
Revision Date: 09.2018
MOUNTAIN ROADWESTBROOK ROAD
Atlanta Metropolitan Series October 2021 to October 2022
Copyright 2021 Aero Surveys of Ga., Inc.
Reproduced by Permission
LOCATION MAP - 1"=2000'±
SI
T
E
HOVEOF AGENDA #:
S1;islFliID2M,
DESIGN REVIEW BOARD APPLICATION
MEETING DATE: 2/11/2022
TYPE OF REVIEW: FINAL _X.__,.. COURTESY CASE # V22-02
PROJECT INFORMATION
PROJECT NAME: 14225 Birmingham Hwy
PROJECT ADDRESS: 14225 Birmingham Hwy Milton GA 30004
OVERLAY/FORM BASED CODE: Birmingham
HAS LDP/BUILDING PERMIT BEEN SUBMITTED FOR REVIEW? YES NO_X
PROJECT TYPE (CHECK ONE): SITE/LANDSCAPE
BUILDING
SALES TRAILER
DEMOLITION
ZONING/USE PERMIT/VARIANCE X
OTHER (EXPLAIN)
PROJECT DESCRIPTION: _Proposed guest house to be located in the side yard-
APPLICANT/REPRESENTATIVE INFORMATION
CONTACT PERSON NAME: Kassam Shafk
COMPANY:
ADDRESS: _1422.5 Birmingham Hwy Milton GA 30004
PHONE: 770 655 3147 FAX:
EMAIL: tonykassam3l @gmail.com
APPLICANT'S SIGNATURE: To the best of my knowledge, this application is correct and
complete. 1 understand that 1, or my representative should be in attendance at the Design
Review Board meeting on --2/l/2022 . at 6:00pm, to present this
project. To the best of my knowledge, I have met all applicable OverlaylForm Based Code
conditions (Hwy 9/Deerfield, Birmin,gPayCZn3 rat Milton.) /
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
December 3rd, 2021
Re: 14225 Birmingham Hwy
Milton GA, 30004
Fulton County
City of Milton, Community Development Department (Zoning)
2006 Heritage Walk
Milton, GA 30004
To Whom it may Concern,
Please accept this letter of appeal to request a variance for the proposed guest house to be located in
the side yard of the property in question.
According to the Ordinance Code of the City of Milton GA Section 64-1598. (b)(5) - Guesthouse
(Zone AG-1) “the location shall be limited to the rear yard”.
The property owner’s intent is to build the new residential construction in the side yard with 3 car garage
on the first floor (728 sqft) and the apartment area on the second floor (795 sqft).
The existing house will be connected with the proposed residential structure by a roofed, open-sided
passageway (breezeway).
The rear of the property is highly restricted due to existence of the 100-floodplain limit, 75 feet
impervious setback and 50 feet undisturbed stream buffer combined.
The property owner believes that the improvement cannot jeopardize nor harm the adjacent properties.
Also, the public safety, health and welfare won’t be affected in any way or level with this proposed
construction in question.
My client, Mr. Kassam Shafik (Tony) appreciates your consideration of this variance request.
Please feel free to contact me with any question or concern regarding this request.
Respectfully,
Maya Radovic (applicant’s representative)
Radovic Permits, LLC.
404-717-4795
36
Fill
0-5%
Hard La
b
o
r
0-5%
Appling
0-5%
ESTIMATED SOIL PROPERTIES*
SOIL UNIT
SLOPE
RANGE
(%)
DEPTH TO
BEDROCK
(in)
DEPTH TO
WATER TABLE
INDIC. (in)
OPTIM. TRENCH
DEPTH (in)
SUITABILITY
CODES**
ESTIMATED PERC. RATE
Depth (in) Rate(min/in)
MAX. HYD.
LOAD. RATE
(gpd/s.f.)
*All depth references are with respect to the original grade at the time of this inspection.
** Areas with slopes greater than 25% are considered marginal for OSMS construction. DPH may require site modification or deeper installation to overcome this limitation.
APPLING >72 >72 480-25 GE1 0.10@8-12"48-60
36-47
60
70
FILL ------N/R0-25 GE5 ----N/R
N/R
N/R
N/R
HARD LABOR >48 30-48 N/R0-25 GE3 0.10@8-12"N/R
N/R
N/R
N/R
SUITABILITY CODES DESCRIPTION
GE5- These soils/areas are considered unsuitable for septic system construction due to unsuitable fill.
GE1- These soils should have the capacity to function as suitable media for a conventional septic system absorption field provided that the system is properly
designed, installed and maintained.
NOTES
·The recommendations set forth in this report are based on site/soil conditions at the time of this study and professional judgement of the soil scientist/classifier. They are
merely professional opinions and imply no guarantee or warrantee of performance of any particular system installed.
·All drainage features such as gullies, ephemeral, perennial and intermittent streams are considered unsuitable for septic system construction. All existing road cuts, trails,
building sites/pads and other existing structures are considered unsuitable for septic system construction until further investigation.
·We did not see evidence of any well on the subject property. However, because wells require 100 feet set back, it shall be the responsibility of buyer/owner/agent to make sure
there is no well on the subject property or the neighboring properties that would have a negative impact on this site.
·This study was conducted in a manner consistent with that level of care and skills ordinarily exercised by members of the profession currently practicing under similar
conditions. No other warranties or guarantees, either expressed or implied, are given.
·The areas proposed for a drain field should not be disturbed. If such areas are cut and or filled by more than a foot this soil evaluation should be considered null and void
requiring further investigation.
·A Trimble Geo-7X GPS was used to locate all borings. The property boundaries and topographic information (if shown) are the compilation of the County GIS online maps
and/or a property plat provided by client or project engineer. Either way, such information should be considered approximate, prudent to ground check before any excavation.
GE3 - Due to seasonal high water table, flooding and/or poor internal drainage, these soils are considered marginal/unsuitable for conventional septic system construction. An
alternative system should be considered for these soils.
Legend
Wet Weather Draw
xx Depth to Rock (in)
Hand Auger Boring
Stream/Creek
xx Depth to Water Table Indic. (in)
gilbertoretis@gmail.com
678-559-4090
OWNER/SPONSOR
Gilberto Retis
AMIGOS SEPTIC JOB 14225 BIRMINGGHAM HW 30004
OMAR SOTO
(8]81201-9542
2030 LeungW Ln
Cumin9 GA 30040
NO 5411,„,
6Nuotw
wHo TM4K
E•istlus
24 ILOfL
Rai
41
No Text
No Text
46
•
r t� •. K .•,� K 77y :rf
.t,'� 17 t
* .• iiHNlHI .�� : ..
r
�• ilil�Nlll�k. ��_
11
t
.'
hdh*OF AGENDA #:
V4b
i,i7i•;i• l:I� ....,
DESIGN REVIEW BOARD APPLICATION
MEETING DATE: _February 1, 2022
TYPE OF REVIEW: FINAL COURTESY X CASE #
PROJECT INFORMATION
PROJECT NAME:
PROJECT ADDRESS: _355 Cox Rd, Roswell, GA 30075
OVERLAY/FORM BASED CODE:
HAS LDP/BUILDING PERMIT BEEN SUBMITTED FOR REVIEW? YES _X_ NO.
PROJECT TYPE (CHECK ONE): SITE/LANDSCAPE
BUILDING X
1 It Submittal for Interior Finish only.
2nd submittal includes required City of Milton DRB
Exterior finishes to fit the "Milton Brand".
SALES TRAILER
DEMOLITION
ZONING/USE PERMIT/VARIANCE
OTHER (EXPLAIN)
PROJECT DESCRIPTION:
Interior finishes of existing detached garage(owner approved) and required City of Milton
DRB exterior finishes to fit the "Milton Brand".
APPLICANT/REPRESENTATIVE INFORMATION
CONTACT PERSON NAME: Marc Rosenfeld
COMPANY: Bullseye Properties, LLC.
ADDRE55: _7215 Wyngate Dr, Cumming, GA 30040
PHONE: _(770)894-1982 FAX: _N/A
EMAIL: marc@bullseyebuilds.com
APPLICANT'S SIGNATURE: To the best of my knowledge, this application is correct and
complete. I understand that/, or my representative should be in attendance at the Design
Review Board meeting on _February 1, 2022, at 6:00pm, to present this project. To the best
of my knowledge, I have met all applicable Overlay/form Based Code conditions (Hwy
9/Deerfield, Birmingham, Crabapple, Rural Mien.)
Date
l-STABmHm 200(,
DESIGN REVIEW BOARD APPLICATION
AGENDA#:
MEETING DATE: 02.01.2022 (DRB Final Review)
TYPE OF REVIEW: FINAL X COURTESY CASE # ________ _
PROJECT INFORMATION
PROJECT NAME:_Town Cenler Easl - Phase II (Missing Middle) _______ _
PROJECT ADDRESS: _850 Mayfield Rd, Alpharella GA 30009 ________ _
OVERLAY /FORM BASED CODE: _THE CODE OF THE CITY OF MILTON, GEORGIA ARTICLE XIX. -
CRABAPPLE FORM-BASED CODE. _______________ _
HAS LOP/BUILDING PERMIT BEEN SUBMITTED FOR REVIEW? YES_ NO_X_
PROJECT TYPE (CHECK ONE): SITE/LANDSCAPE ___ _
BUILDING _(YES) __ _
SALES TRAILER __ _
DEMOLITION. __ _
ZONING/USE PERMIT /VARIANCE ___ _
PROJECT DESCRIPTION: 3 Story, 20,350 SF. Mixed Use Development. Retail on Ground Floor,
Commercial (office) on 2nd floor, & Residential (4 units) on 3rd floor. Garage on sub grade
level.
APPLICANT /REPRESENTATIVE INFORMATION
CONTACT PERSON NAME: John Gaston (Own er / Clienl)
COMPANY:_Crabbapple Ventures LLC. ______________ _
ADDRESS:_ 2175 Dinsmore Rd, ALPHARETTA, GA, 30004. _________ _
PHONE: _404-401-5780 . _______ FAX: ___________ _
EMAIL: tCTS£/t/ll;/Lv?;//A Q,lf1<1P. Ce/U--
ARCHITECT: Andrew Telker, RA (Sizemore Group Architecls)
342 Marietta SI. NW, Uni! 3, Atlanta GA 30313 (F: 404.605.0890 C: 850-819-5285)
andrewl@sizemoregroup.com
APPLICANT'S SIGNATURE: To the best of my knowledge, this application is correct and
complete. I understand that I, or my representative should be in attendance at the Design
Review Board meeting on 12.07.21 AND 01.04.2022, at 6:00pm, to present this project. To the
best of my knowledge, I have met all applicable Overlay/Form Based Code conditions (Hwy
9/Deerfield, Birming_ am, ra apple, Rural Milton.)
Applicanl:7'-='"'7--;�-�----------- Date 01.14.2022
DESIGN REVIEW BOARD SUBMITTAL REQUIREMENTS
Please see the list below for materials required according to the type of review. A11 site plans arra buElding plans
small be drawn to scale_ Mounted drawings and sample boards showing materials, colors, etc. moy be brought
to the meeting for your presentation_ Please fold alt Iorge drawing s clown to 8'l2" by I I" size, and collate all
rr'rater-to ls_ 11 xt l 'boo k leis' are acceptable as well. Incomplete sub m ttals will not be accepted for review.
It your have any questions, please contact Shubho Jangarn of 678 242 2539_
SITE PLA NILANDSCAPP PLAN REVIEW -9 sets +$330 fee
onslruction drawings, as required for LDP, inGlvding, bvt not lirnifed to.
❑ Site location rnap{otlos mop)
❑ Aerial map (Google)
❑ Acreage, density, adjacent zonings
❑ Zoning conditions [ii any)
❑ Building footprint, square footage
❑ Grading, storm water plan, detention/retention areas
❑ Location of streams, stream buffers
❑ R0C1d ays, parking areas, driveways. side olks, bike paths, pedestrian paths
❑ Dumpster enclosure detain{ location
C1 Landscape plan showing location, size and type of specirnen and recompense trees, as well as other planings
❑ bite lighting with photometric drawings , lighting fixture details
❑ Retaining woll(s) locotion acrd material details
❑ Fencing locafion and details)
❑ Bike rack locafion and detail
❑ Maii kiosk location and detail (If aopliCable)
13UILDIN REVIEW -9 sets + 3360 fee
• Site location map(atlas map}
■ Aerial map (Google)
Site orlon
* Colored renderings of oll facades
■ Line drawings of all elev4tlons with heights. cnd r alerials la bled
Locations of roof top egUipment, satellite dishes, ontennos,vents,exhausts (as applicable)
* Site line study showing that rooftop units are not visible from odjoining roads of applicable)
■ Location, details of lighting fixtt res
Dumpster enclosure detaRs QEF opplicabte)
* moil kiosk details �If appliccblej
* Sample board showing materials, colors, etc_ (13ring to the rneetingl
SALES TRAILER -9 sets
U Site location rnap(atlas reap)
❑ Aerial map (Google)
Q Site pion showing location of s❑les trailer, setbacks, parking, etc,
LJ Landscape plain
❑ Picture ondlor construction details of trailer
DEMGLMON REVIEW -9 sets
❑ Site location map;oilras map)
❑ Aeriol mop (Google}
M Site plcrn, indicdf ng structure(3) to be demolished and the location of specimen trees, erosion control, tree save
fencing
❑ Pictures of structvre(s) to be demolished
ARIAN EIUSI: PEMfF/REIONING-9 sets
❑ Site location mop(otlos mapJ
❑ Aerial map [Google)
Cl Site pictures
0 Ar-reoge. density, existing site conditions
Q Conceptual site plan shoaling location of buildings, delenlion oreos, streams/stream buffers, specimen trees, roads,
parking. driveways, sidewalks, etc_
❑ For co mrnerclallmVltifamilyJto nhome uses: conceptual renderings of bultdIngs, square footoges
❑ For sign variance; Site Cine study showing view of signs from adjacent roads
171 For stream buffer voriQnce: mifigation plan
12/30/2021 11:32:33 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-00COVERSHEETCONCEPTUAL DESIGN
12/30/2021 11:32:34 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-01VICINITY MAP ANDARIEL MAPVICINTY MAP ARIEL MAP OF SITE
20' DEMAIL KIOSKSTEPPINGSTONESGRASSED AREAGRASSEDAREAGRASSEDAREAHVAC
UNITS R/WFDCEETWWEEETWWWSSS(1.) EXISTING BUILDING30,773 SFEXISTING PARKING(2A.) 98 SPACES7 COMPACT PK SPACES9 COMPACT PKING SPACES(7B.) NEW PARKING16 SPACES(8.) DUMPSTEROFF SITE PARKING(2C.) 4 SPACESGARAGE PARKING(2B.) 10 SPACES(9.) EXISTING CURB CUT510 SPACES(7A.) NEW PARKING1 SPACES575'-3"102'-11"151'-8"30'-5"8'-8"5(7C.) NEW PARKING [11 SPACES]1131115151117PERMENANT CONSTRUCTION EASEMENTACCESS 10' B/LACCESS 10' B/LACCESS 10' B/LACCESS 10' B/L42 SPACES(7D.) NEW PARKING2 SPACES1ROOF TOP EQUIPMENTROOF TERRACE (1)ROOF TERRACE (2)ROOF TERRACE (3)ROOF TERRACE (4)(3.) NEW BUILDING20,350 SFSITE SUMMARY OF REQUIREMENTS / LIMITSEXISTING CONDITIONS1. EXISTING OFFICE / RETAIL30,773 SF2. EXISTING PARKING:A. ON SITE98 SPACESB. GARAGE10 SPACESC. OFF SITE 4 SPACES TOTAL112 SPACES2A. EXISTING PARKING REQUIRED PKING (30,773 SF x 3.5 RATIO = 107 PK SPACE)(107 -(10% OF 107) = 97 PK SPACES)PROVIDED = 112 SPACES (+15 EXTRA)EXISTING CONDITIONS1. EXISTING OFFICE / RETAIL30,773 SF2. EXISTING PARKING:A. ON SITE98 SPACESB. GARAGE10 SPACESC. OFF SITE 4 SPACES TOTAL112 SPACES2A. EXISTING PARKING REQUIRED PKING (30,773 SF x 3.5 RATIO = 107 PK SPACE)(107 -(10% OF 107) = 97 PK SPACES)PROVIDED = 112 SPACES (+15 EXTRA)PROPOSED EXPANSION 3. NEW BUILDING SIZE ALLOWABLE:2.7 ACRES(T-4 OPEN) 9 UNITS / 1 ACRE = 24 UNITS2.7 ACRES x 24 UNITS/ACRE = 64 UNITS 60,750 SF ALLOWED-30,774 SF EXISTING29,976 SF AVAILABLE4. NEW RETAIL(GROUND FLOOR):5,400 SF5. NEW BUSINESS (OFFICE, LEVEL 2) ( 1 FLOORS)(75'X102' = 7,215SF X 1 FLOORS) = 7,215 SF6. TOTAL PROPOSED BUILDINGS ON SITEPROPOSED RETAIL SF = 5,920 (1ST)PROPOSED BUSINESS SF= 7,215 (2ND)PROPOSED RESIDENTIAL SF= 7,215 (3RD)TOTAL PROPOSED =20,350 SF7A. NEW PARKING (ON SITE) = 1 SPACES7B NEW PARKING (ON SITE) =16 COMPACT 7C NEW PARKING (ON SITE) =11 SPACES7D. NEW PARKING (ON SITE) =2 SPACES7E. NEW PARKING (GARAGE) =18 SPACES NEW PROVIDED (TOTAL) = 48 SPACES8. TRASH / DUMPSTER9.EXISTING CURB CUTSREQUIREMENTS / LIMITS OF SITE (ZONING) EXISTING BUILDING SF= 30,773PROPOSED TOTAL SF= 20,350TOTAL BUILDING FOOTPRINTS= 51,123EXISTING PARKING = 112 SPACESNEW PARKING = 48 SPACESTOTAL PARKING=160 SPACES REQUIRED PARKING = 177 SPACES(RETAIL/OFFICE 3.5/1000 45,958/1000 X 3.5) = 161 SPACES(2 PER RESIDENTIAL UNIT=4X2=8) 16 SPACES (MINUS 10%, DENSITY BONUS, 18 LESS) = 159 SPACESTOTAL PARKING PROVIDED= 160 SPACESPROGRAM:SUBLEVEL -GARAGELEVEL 1 -RETAILLEVEL 2 -OFFICELEVEL 3 -RESIDENTIAL12/30/2021 11:32:37 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-02SITE PLAN -(CONCEPTUAL)1" = 50'-0"A-021ARCHITECTURAL SITE PLANN0100'150'200'50'Graphic Scale: 1 inch = 50 feetAT ROOF LEVEL
1110
112111201118111611141112111611141 1 1 21108
1130111011121114111611181122112410' FRONT SETBACK1591517hc hc hc11518hc hcFUTURE CHARLOTTE DRIVE EXTENSIONMAYFIELD ROAD48' SIDEWALK6' SIDEWALKUPSTAIRS20' DEMAIL KIOSKSTEPPINGSTONESSTEPPINGSTONESGRASSED AREAGRASSEDAREAGRASSEDAREAHVAC
UNITS FDCEGETTWWEEETWWWSSSSSEXISTING BUILDINGGARAGE LEVELNEW BUILDINGGARAGE LEVEL18 PK SPACES(7,665 SF)7E.30'-9"2A-03Sim74'-6"151'-8"102'-11"9'-1"EXISTING PARKING(2A.) 98 SPACES7 COMPACT PK SPACES9 COMPACT PKING SPACES(7B.) NEW PARKING16 SPACES(8.) DUMPSTEROFF SITE PARKING(2C.) 4 SPACES5(7A.) NEW PARKING1 SPACES55(7C.) NEW PARKING [11 SPACES]1131115151117PERMENANT CONSTRUCTION EASEMENTACCESS 10' B/LACCESS 10' B/L4(7D.) NEW PARKING2 SPACES1BUSINESS -(Option A, Stick Frame)*YES -NFPA 13 sprinkler system *BUILDING TYPE: Type VA construction. *OCCUPANCY: B -Business*HEIGHT: 70' / *NO STORIES: 4 w/ Spnklr*ALLOWABLE AREA: 54,000 SF (w/ Spnklr)2 STORY CONCRETE PODIUM-RETAIL (Restaurant at Street Level)*NO -NFPA 13 sprinkler -(Per 903.2.7) *BUILDING TYPE: Type IA construction.*OCCUPANCY: M -Retail *HEIGHT: UL / *NO STORIES: UL*ALLOWABLE AREA: Unlimited (UL) BUSINESS -(Option B, Mass Timber w/ Stick)*YES -NFPA 13 sprinkler system *BUILDING TYPE: Type IV const (Mass Timber) *OCCUPANCY: B -Business*HEIGHT: 85' / *NO STORIES: 6 w/ Sprinkler*ALLOWABLE AREA: 72,000 SF (w/ Spnklr)PARKING (SubGrade Level, Rear entry only)*YES -NFPA 13 sprinkler system *BUILDING TYPE: Type IA construction*OCCUPANCY: S2 -Parking*HEIGHT: UL / *NO STORIES: UL*ALLOWABLE AREA: Unlimited (UL)*IBC Section 510.2 Separated by a 3-hour fire res*All elevator and stair shafts through the horizontal building separation must be 2-hour ratedCODE : 2018 IBC (w/ GA Admendments)OCCUPANCY USE / ALLOWABLE SIZE/SFBUSINESS -(Option A, Stick Frame)*YES -NFPA 13 sprinkler system *BUILDING TYPE: Type VA construction. *OCCUPANCY: B -Business*HEIGHT: 70' / *NO STORIES: 4 w/ Spnklr*ALLOWABLE AREA: 54,000 SF (w/ Spnklr)2 STORY CONCRETE PODIUM-RETAIL (Restaurant at Street Level)*NO -NFPA 13 sprinkler -(Per 903.2.7) *BUILDING TYPE: Type IA construction.*OCCUPANCY: M -Retail *HEIGHT: UL / *NO STORIES: UL*ALLOWABLE AREA: Unlimited (UL) BUSINESS -(Option B, Mass Timber w/ Stick)*YES -NFPA 13 sprinkler system *BUILDING TYPE: Type IV const (Mass Timber) *OCCUPANCY: B -Business*HEIGHT: 85' / *NO STORIES: 6 w/ Sprinkler*ALLOWABLE AREA: 72,000 SF (w/ Spnklr)PARKING (SubGrade Level, Rear entry only)*YES -NFPA 13 sprinkler system *BUILDING TYPE: Type IA construction*OCCUPANCY: S2 -Parking*HEIGHT: UL / *NO STORIES: UL*ALLOWABLE AREA: Unlimited (UL)*IBC Section 510.2 Separated by a 3-hour fire res*All elevator and stair shafts through the horizontal building separation must be 2-hour ratedCODE : 2018 IBC (w/ GA Admendments)OCCUPANCY USE / ALLOWABLE SIZE/SFCONCRETE PODIUM(A.) STICK FRAMESTREETGARAGERETAIL / REST.OFFICERESIDENTIAL(B.) MASS TIMBER w/ STICK INFILLOR3 HR 2 HR 1 HR 1 HR 75'-0"54'-7"62'-6 1/2"8'-0"14'-0"14'-0"16'-0"10'-0"63'-10"75'-0"35'-7"147'-0"6'-0"12/30/2021 11:32:46 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-03FLOOR PLAN -GARAGE1" = 50'-0"A-031ARCHITECTURAL SITE PLAN1" = 50'-0"A-032BLDG SECTION1" = 50'-0"A-033SOUTH ELEVATIONAT STREET LEVEL
20' DEMAIL KIOSKSTEPPINGSTONESGRASSED AREAGRASSEDAREAGRASSEDAREAHVAC
UNITS R/WFDCEETWWEEETWWWSSSSSUPEXISTING BUILDINGSTREET LEVELUPNEW BUILDINGSTREET LEVELRETAIL / REST(5,920 SF)75'-3"103'-1"30'-5"OUTDOORDINING (1200 SF)151'-8"8'-8"EXISTING PARKING(2A.) 98 SPACES7 COMPACT PK SPACES9 COMPACT PKING SPACES(7B.) NEW PARKING16 SPACES(8.) DUMPSTEROFF SITE PARKING(2C.) 4 SPACES(9.) EXISTING CURB CUT5(7A.) NEW PARKING1 SPACES55(7C.) NEW PARKING [11 SPACES]1131115151117PERMENANT CONSTRUCTION EASEMENTACCESS 10' B/LACCESS 10' B/L4(7D.) NEW PARKING2 SPACES18' clear8'-0"20'-0"RETAIL5,400 SF(LEVEL 1 -STREET LEVEL)BUSINESS 7,688 SF (LEVEL 2)BUSINESS7,688 SF (LEVEL 3)PROGRAM LAYOUTSUBLEVEL -GARAGELEVEL 1 -RETAILLEVEL 2 -OFFICELEVEL 3 -RESIDENTIALRETAIL5,920 SF(LEVEL 1 -STREET LEVEL)BUSINESS 7,215 SF (LEVEL 2)RESIDENTIAL7,215 SF (LEVEL 3)PROGRAM LAYOUTSUBLEVEL -GARAGELEVEL 1 -RETAILLEVEL 2 -OFFICELEVEL 3 -RESIDENTIALOFFICE 1OFFICE 2OFFICE 3OFFICE 412/30/2021 11:32:51 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-04FLOOR PLAN -RESTAURNT &RESIDENTIAL UNITS1" = 50'-0"A-041ARCHITECTURAL SITE PLANAT STREET LEVELSIMILAR:RESIDENTIAL FLOOR PLAN ABOVE (4 UNITS PER LEVEL)1" = 20'-0"A-042FLOOR PLAN - OFFICE
14'-0"SECOND FLOOR28'-0"THIRD FLOOR42'-0"TOP OF BRICK WALL-2'-0"FIRST FLOOR -NEW BLDG14'-0"14'-0"16'-0"10'-0"3'-0"PROPERTY LINEWOOD PORCHCAST STONE BASECEDAR SHAKE SHINGLESCAST STONE HEADERBAHAMA SHUTTERSSTANDING SEAM METAL ROOFWOOD RAILINGTONGUE AND GROOVEUNDER COLLONADECAST STONE ACCENTWOOD FASCIALIGHT FIXTUREWOOD HEADER TRIMWOOD SILL TRIMWOOD BRACKET 62'-3"STANDING SEAM METAL ROOFWOOD PORCHBRICKINSULATED LOW E GLAZINGCAST STONE HEADERCAST STONE SILLBAHAMA SHUTTERSWOOD BRACKETSSTANDING SEAM METAL ROOFVINYL FRAME WINDOWWOOD STOREFRONT FRAMEWOOD RAILINGTONGUE AND GROOVEUNDER COLLONADEWOOD HEADER TRIMBRICK RETAINING WALLMETAL RAILINGFENCED ROOF TOP TERRACE(RESIDENTIAL) -BEYONDEXTERIOR MATERIAL FINISHESBAHAMA SHUTTERSCEDAR SHAKE SHINGLESMETAIL COPINGCAST STONE HEADER/SILL/ACCENTALUMINUM STOREFRONTCAST STONE BASEPVC DARK BRONZEMOSS GREENTO MATCH CAST STONE SANDSTONESANDSTONEIRON ORESANDSTONEGFRP CORNICE TRIMTO MATCH CAST STONE SANDSTONEBRICKCHEROKEE MELROSE QUEEN SIZELIGHT FIXTURESSOMERSET WALL MOUNT COPPERDOWNSPOUT/SCUPPERTO MATCH CAST STONE SANDSTONEFIXED SHUTTERPVC DARK BRONZEINSULATED LOW-E GLAZINGSUNGUARD AG-50FIBER CEMENT PANELSTANDING SEAM METAL ROOFWOOD BRACKETWOOD COLUMNWOOD RAILINGVINYL WINDOW FRAMETONGUE AND GROOVE CEILINGWOOD STOREFRONT FRAMESWOOD BARN GARAGE DOORRAW GALVANIZED METALBEHR DRIFT GRAY STAIN SEMI TRANSLUCENTDARK BRONZEWOOD FASCIABEHR DRIFT GRAY STAIN SEMI TRANSLUCENTBEHR DRIFT GRAY STAIN SEMI TRANSLUCENTBEHR DRIFT GRAY STAIN SEMI TRANSLUCENTBEHR DRIFT GRAY STAIN SEMI TRANSLUCENTBEHR DRIFT GRAY STAIN SEMI TRANSLUCENTBEHR DRIFT GRAY SEMI TRANSLUCENTMETAIL RAILINGSHERWIN WILLIAMS URBAN BRONZEWOOD HEADERBEHR DRIFT GRAY STAIN SEMI TRANSLUCENTWOOD TRIMBEHR DRIFT GRAY STAIN SEMI TRANSLUCENTMETAIL DOORDARK BRONZE (FRAME COLOR)METAIL STAIRSSHERWIN WILLIAMS URBAN BRONZE12/30/2021 11:32:53 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-05SOUTH ELEVATION -(FRONT)3/32" = 1'-0"A-051SOUTH ELEVATION
14'-0"SECOND FLOOR28'-0"THIRD FLOOR42'-0"TOP OF BRICK WALL-2'-0"FIRST FLOOR -NEW BLDGWOODEN BARN STYLE GARAGE DOORWOOD PORCHINSULATED LOW E GLAZINGCAST STONE HEADERCAST STONE SILLWOODEN BRACKETSTANDING SEAM METAL ROOFWOOD RAILINGMETAL RAILINGCAST STONE BASEGFRP CORNICE -SEE 7/A706VINYL FRAME WINDOWFIBER CEMENT PANELMETAL DOORWOOD HEADER TRIM10'-0"16'-0"14'-0"14'-0"62'-3"MAIL KIOSKSTANDING SEAM METAL ROOFWOOD PORCHBRICKCEDAR SHAKE SHINGLESCAST STONE HEADERSTANDING SEAM METAL ROOFWOOD BRACKETVINYL FRAME WINDOWWOOD RAILINGFIBER CEMENT PANELMETAL DOORWOOD HEADER TRIMMETAL COPINGMAIL KIOSKSTEPPING STONES (ON HILL)12/30/2021 11:32:56 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-06NORTHELEVATIONS (REAR)3/32" = 1'-0"A-061NORTH ELEVATION - (REAR)
14'-0"SECOND FLOOR28'-0"THIRD FLOOR-12'-0"GARAGE FLOOR 342'-0"MECH ROOF-2'-0"FIRST FLOOR -NEW BLDGSTANDING SEAM METAL ROOFSTAINED WOOD PORCHBRICKCAST STONE BASECEDAR SHAKE SHINGLESCAST STONE HEADERCAST STONE SILLBAHAMA SHUTTERSWOODEN BRACKETSTANDING SEAM METAL ROOFWOOD BRACKETVINYL FRAME WINDOWSTAINED WOOD RAILINGWOOD FASCIALIGHT FIXTUREGFRP CORNICEMETAL COPINGSTANDING SEAM METAL ROOF14'-0"14'-0"16'-0"10'-0"METAL RAILINGSTREET(MAYFIELD RD)SIDEWALKFAUX BRICK WINDOW (INFILL)12/30/2021 11:32:57 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-07EAST ELEVATION -(SIDE)3/32" = 1'-0"A-071EAST ELEVATION - (SIDE)
14'-0"SECOND FLOOR28'-0"THIRD FLOOR-12'-0"GARAGE FLOOR 3-17'-0"ELEVATOR PIT42'-0"TOP OF BRICK WALL-2'-0"FIRST FLOOR -NEW BLDGSTAINED WOOD PORCHBRICKCAST STONE SILLBAHAMA SHUTTERSVINYL FRAME WINDOWSTAINED WOOD RAILINGSTANDING SEAM METAL ROOF14'-0"14'-0"16'-0"10'-0"STANDING SEAM METAL ROOFCAST STONE BASECEDAR SHAKE SHINGLESCAST STONE HEADERBAHAMA SHUTTERSWOODEN BRACKETSTANDING SEAM METAL ROOFWOOD BRACKETWOOD FASCIALIGHT FIXTUREGFRP CORNICEMETAL COPINGSTANDING SEAM METAL ROOFELEVATOR BEYONDFAUX WINDOW (W/ SHUTTERS)MAIL KIOSKSTEPPING STONES (ON THE HILLSIDE)STREET(MAYFIELD RD)12/30/2021 11:32:59 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-08WEST ELEVATION -(SIDE)3/32" = 1'-0"A-081MM - ELEVATION - WEST
UPBOLBOLMAIL KIOSKGRASSED AREAEWWSUPUPUP1/2" / 12"1/2" / 12"1'-0"1'-0"9523 SFFUTURETENANT100A5005SimSTEEPING STONES STAIR (ON HILL)FSP10' SET BACKPROPERTY LINE5119 SFRESTAURANT325ZOYSIA GRASSALIGN WITH EXISTINGEXISTING BUILDING(PHASE I)PROPOSED BUILDING(PHASE II)PLAZASTAIR DOWN TO SIDEWALK(AT MAYFIELD ROAD)(+10' HIGH)(+0' HIGH)SLOPED HILLHARDSCAPE (CONCRETE)12/30/2021 11:33:02 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-09PLAZA LEVEL
12/30/2021 11:33:17 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-10PLAZA - 3D VIEWS3D VIEW -PLAZA VIEW FROM FRONT (MAYFIELD ROAD)3D VIEW -PLAZA VIEW FROM REAR (PARKING LOT)3D VIEW -PLAZA VIEW FROM REAR (PARKING LOT)3D VIEW -PLAZA VIEW FROM FRONT
5'-0"MAYFIELD RDROOFTOP UNITS89'-5"41'-0"NOTE: ROOFTOP UNITS ARE SCREENED AND NOT VISIBLE FROM ANY NEARBY ROAD, NOR INTERSECTION CHARLOTTE DRROOFTOP UNITSROOFTOP UNITSCURVE AT NEW ADJACENT ROAD227'-1 15/16"5'-0"12/30/2021 11:33:25 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-11ROOFTOPSCREENINGDIAGRAM13D - ROOF TOP UNITS1" = 30'-0"2SECTION (SOUTH TO NORTH)1" = 30'-0"3SECTION (EAST TO WEST)ROOFTOP UNITS
TOWN CENTER PHASE I -EXISTING BUILDING (LOOKING WEST ON MAYFIELD) TOWN CENTER PHASE I -EXISTING BUILDING (LOOKING EAST ON MAYFIELD) TOWN CENTER PHASE II -PROPOSED SITE (LOOKING AT SITE FROM MAYFIELD) BRICK SAMPLE: MELROSE (CHEROKEE BRICK)12/30/2021 11:33:25 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-12MATERIALS / SITEVIEWS
N
0 100'150'200'50'
Graphic Scale: 1 inch = 50 feet
12/30/2021 11:33:26 AM SIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBIN
A-13COLORED - SITEPLAN2
8
67
351
9
EXISTING TREES TO
REMAIN (TYP)
4
EXISTING CURB CUTS
1
2
3
5
4
6
7
8
9
EXISTING OFFICE / RETAIL (30,773 SF)
EXISTING PARKING: (112 SPACES)
NEW BUILDING (20,350 SF) RETAIL 5,400 SF
OFFICE 7,215 SF RESIDENTIAL 7,215 SF
MAIL KIOSK
PLAZA (HARDSCAPE, & GRASSY HILL)
NEW DRIVE
NEW PARKING (48 SPACES)
TRASH / DUMPSTER
N
0 100'150'200'50'
Graphic Scale: 1 inch = 50 feet
12/30/2021 11:33:26 AM SIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBIN
A-13COLORED - SITEPLANEXISTING TREES TO
REMAIN (TYP)
1
SEE ENLARGEMENT A-15
EXISTING BUILDING
LANDSCAPE PLAN4
WILLOW OAK/QUERCUS PHELLOS1
PLANT # COMMON NAME/LATIN NAME
2
MISS SCARLET ANISE/ ILLICIUM
FLORIDANUM MISS SCARLET3
FRINGE TREE/ CHIONANTHUS VIRGINICUS
4 BOTTLEBRUSH BUCKEYE/ AESCULUS
PARVIFLORA
5 FOTHERGILLA ‘MOUNT AIRY’/
FOTHERGILLA MAJOR
6 DWARF OAKLEAF HYDRANGEA/
HYDRANGEA QUERCIFOLIA
7 ITEA VIRGINICA ‘MERLOT’/ITEA MERLOT
8 ILEX GLABRA/INKBERRY HOLLY
9 DWARF WAX MYRTLE/MYRICA
CERIFERA ‘DONS DWARF’BLABUSCH LANDSCAPE ARCHITECTURENOTE: ALL PLANTS ARE NORTH AMERICAN NATIVE
N
0 100'150'200'50'
Graphic Scale: 1 inch = 50 feet
12/30/2021 11:33:26 AM SIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBIN
A-13COLORED - SITEPLANWILLOW OAK/QUERCUS PHELLOS1
PLANT # COMMON NAME/LATIN NAME
PROPOSED BUILDING
2
MISS SCARLET ANISE/ ILLICIUM
FLORIDANUM MISS SCARLET
3
3
FRINGE TREE/ CHIONANTHUS VIRGINICUS
N
0 100'150'200'50'
Graphic Scale: 1 inch = 50 feet
12/30/2021 11:33:26 AM SIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBIN
A-13COLORED - SITEPLAN0 20 40
SCALE 1” = 20’
EXISTING BUILDING TURF 4
4 BOTTLEBRUSH BUCKEYE/ AESCULUS
PARVIFLORA
4
5
5
5 FOTHERGILLA ‘MOUNT AIRY’/
FOTHERGILLA MAJOR
6 DWARF OAKLEAF HYDRANGEA/
HYDRANGEA QUERCIFOLIA
6
7
2
7 ITEA VIRGINICA ‘MERLOT’/ITEA MERLOT
EXISTING PLANTS 8 8 8
8 ILEX GLABRA/INKBERRY HOLLY
99
9 DWARF WAX MYRTLE/MYRICA
CERIFERA ‘DONS DWARF’
4
LANDSCAPE PLAN5BLA BUSCH LANDSCAPE ARCHITECTURENOTE: ALL PLANTS ARE NORTH AMERICAN NATIVE
PARKING
STEPPING STONES
SIDEWALK
2
TURF
N
0 100'150'200'50'
Graphic Scale: 1 inch = 50 feet
12/30/2021 11:33:26 AM SIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBIN
A-13COLORED - SITEPLANWILLOW OAK/QUERCUS PHELLOS1
PLANT # COMMON NAME/LATIN NAME
2
MISS SCARLET ANISE/ ILLICIUM
FLORIDANUM MISS SCARLET3
FRINGE TREE/ CHIONANTHUS VIRGINICUS
4 BOTTLEBRUSH BUCKEYE/ AESCULUS
PARVIFLORA
5 FOTHERGILLA ‘MOUNT AIRY’/
FOTHERGILLA MAJOR
6 DWARF OAKLEAF HYDRANGEA/
HYDRANGEA QUERCIFOLIA
7 ITEA VIRGINICA ‘MERLOT’/ITEA MERLOT
8 ILEX GLABRA/INKBERRY HOLLY
9 DWARF WAX MYRTLE/MYRICA
CERIFERA ‘DONS DWARF’
5
1 2 3 4
5 6 7 8 9
6BLA BUSCH LANDSCAPE ARCHITECTURELANDSCAPE PLANTS
1/21/2022 9:54:17 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-17COLORED - SOUTHELEVATION
1/21/2022 9:54:20 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-18COLORED - NOTHELEVATION
1/21/2022 9:54:21 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-19COLORED - EASTELEVATION
1/21/2022 9:54:22 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-20COLORED - WESTELEVATION
504.2 Mixed OccupancyIn a building containing mixed occupancies in accordance with Section 508, no individual occupancy shall exceed the height and number of story limits specified in this section for the applicable occupancies504.3 Height in FeetThe maximum height, in feet, of a building shall not exceed the limits specified in Table 504.3.The maximum height, in feet, of a building shall not exceed the limits specified in Table 504.3.Type V‐A1 HOURStructural Frame 1 HrExterior Bearing Walls 1 HrExterior Non‐Bearing Depends of distance to PLInterior Bearing Walls 1 HrInterior Non‐Bearing 0Floor Construction 1 HrRoof Construction 1 HrShafts 2 Hr when 4 stories or moreFire Walls 2 HrType III‐A1 HOURStructural Frame 1 HrExterior Bearing Walls 2 HrExterior Non‐Bearing Depends of distance to PLInterior Bearing Walls 1 HrInterior Non‐Bearing 0Floor Construction 1 HrRoof Construction 1 HrShafts 2 Hr when 4 stories or moreFire Walls 3 Hr510.2 Horizontal Building Separation AllowanceA building shall be considered as separate and distinct buildings for the purpose of determining area limitations, continuity of fire walls, limitation of number of stories and type of construction where all of the following conditions are met:1. The buildings are separated with a horizontal assembly having a fire-resistance rating of not less than 3 hours.2. Where vertical offsets are provided as part of a horizontal assembly, the vertical offset and the structure supporting the vertical offset shall have a fire-resistance rating of not less than 3 hours.3. The building below, including the horizontal assembly, is of Type IA construction.Shaft, stairway, ramp and escalatorenclosures through the horizontal assembly shall have not less than a2-hourfire-resistance rating with opening protectives in accordance with Section 716.Exception: Where the enclosure walls below the horizontal assembly have not less than a 3-hour fire-resistance rating with opening protectives in accordance with Section 716, the enclosure walls extending above the horizontal assembly shall be permitted to have a 1-hour fire-resistance rating, provided:The building above the horizontal assembly is not required to be of Type I construction;The enclosure connects fewer than four stories; andThe enclosure opening protectives above the horizontal assembly have a fire protection rating of not less than 1 hour.510.4 Parking Beneath Group RWhere a maximum one story above grade plane Group S-2 parking garage,enclosed or open, or combination thereof, of Type I construction or open of Type IV construction, with grade entrance, is provided under a building of Group R, the number of stories to be used in determining the minimum type of construction shall be measured from the floor above such a parking area. The floor assembly between the parking garage and the Group R above shall comply with the type of construction required for the parking garage and shall also provide a fire-resistance rating not less than the mixed occupancy separation required in Section 508.4.510.5 Group R-1 and R-2 Buildings of Type IIIA ConstructionThe height limitationfor buildings ofType IIIA construction in Groups R-1 and R-2 shall be increased to six stories and 75 feet (22 860 mm) where the first floor assembly above the basement has a fire-resistance rating of not less than 3 hours and the floor area is subdivided by 2-hour fire-resistance-rated fire walls into areas of not more than 3,000 square feet (279 m2).304.1 Business Group BBusiness Group B occupancy includes, among others, the use of a building or structure, or a portion thereof, for office, professional or service-type transactions, including storage of records and accounts. Business occupancies shall include, but not be limited to, the following:Airport traffic control towersAmbulatory care facilitiesAnimal hospitals, kennels and poundsBanksBarber and beauty shopsCar washCivic administrationClinic, outpatientDry cleaning and laundries: pick-up and delivery stations and self-serviceEducational occupancies for students above the 12th gradeElectronic data processingFood processing establishments and commercial kitchens not associated with restaurants, cafeterias and similar dining facilities not more than 2,500 square feet (232 m2) in area.Laboratories: testing and researchMotor vehicle showroomsPost officesPrint shopsProfessional services (architects, attorneys, dentists, physicians, engineers, etc.)Radio and television stationsTelephone exchangesTraining and skill development not in a school or academic program (this shall include, but not be limited to, tutoring centers, martial arts studios, gymnastics and similar uses regardless of the ages served, and where not classified as a Group A occupancy).311.3 Low-Hazard Storage, Group S-2Storage Group S-2 occupancies include, among others, buildings used for the storage of noncombustible materials such as products on wood pallets or in paper cartons with or without single thickness divisions; or in paper wrappings. Such products are permitted to have a negligible amount of plastic trim, such as knobs, handles or film wrapping. Group S-2 storage uses shall include, but not be limited to, storage of the following:AsbestosBeverages up to and including 16-percent alcohol in metal, glass or ceramic containersCement in bagsChalk and crayonsDairy products in nonwaxed coated paper containersDry cell batteriesElectrical coilsElectrical motorsEmpty cansFood productsFoods in noncombustible containersFresh fruits and vegetables in nonplastic trays or containersFrozen foodsGlassGlass bottles, empty or filled with noncombustible liquidsGypsum boardInert pigmentsIvoryMeatsMetal cabinetsMetal desks with plastic tops and trimMetal partsMetalsMirrorsOil-filled and other types of distribution transformersParking garages, open or enclosedPorcelain and potteryStovesTalc and soapstonesWashers and dryers309.1 Mercantile Group MMercantile Group M occupancy includes, among others, the use of a building or structure or a portion thereof for the display and sale of merchandise, and involves stocks of goods, wares or merchandise incidental to such purposes and accessible to the public. Mercantile occupancies shall include, but not be limited to, the following:Department storesDrug storesMarketsGreenhouses for display and sale of plants that provide public access.Motor fuel-dispensing facilitiesRetail or wholesale storesSales rooms[F] 903.2.8 Group RAn automatic sprinkler system installed in accordance with Section 903.3 shall be provided throughout all buildings with a Group R fire area. Exception: Group R-1 and R-2 occupancies which meet the exceptions allowed by the Rules and Regulations of the Safety Fire Commissioner Chapter 120-3-3 'Rules and Regulations for the State Minimum Fire Safety Standards' are exempt from this requirement.[F] 903.2.7 Group MAn automatic sprinkler system shall be providedthroughout buildings containing a Group M occupancy where one of the following conditions exists:A Group M fire area exceeds 12,000 square feet (1115 m2).A Group M fire area is located more than three stories above grade plane.The combined area of all Group M fire areas on all floors, including any mezzanines, exceeds 24,000 square feet (2230 m2).A Group M occupancy used for the display and sale of upholstered furniture or mattresses exceeds 5,000 square feet (464 m2).[F] 903.2.11.3 Buildings 55 Feet or More in HeightAn automatic sprinkler system shall be installed throughout buildings that have one or more stories with an occupant load of 30 or more located 55 feet (16 764 mm) or more above the lowest level of fire department vehicle access, measured to the finished floor. Exceptions:Open parking structures.Occupancies in Group F-2.1/21/2022 9:54:22 AMSIZEMORE GROUPMISSING MIDDLE AT TOWN CENTER EASTMISSING MIDDLE12/29/2021A.TELKERB. ST. AUBINA-22CODE / ZONING
IUMINAIII >ms s
BRACKET s >
dPOLE >+;
SMART LUMINAIRE
OPTIONS
Dom us 55 allows you many options in order to get
different smart functionalities.
DMG (available with QfeLED and LEDgine )
Driver is compatible with dimmer from 0 to 10 volts.
CDMG (available with LifeLED and LEDgine )
Dynadimmer standard dimming functionalities including pre-programmed
scenarios to suit many applications and needs from safety to maximum
energy savings.. (see Dynadimmer brochure for more information on pre-programmed scenarios)
CDMGP (available with LifeLED and LEDgine')
Dynadimmer custom dimming scenario allowing the user to program
up to 5 time periods and multiple dimming levels from 100% to 10%
of total wattage.
OVR (available with LEDgine' only)
Dynadimmer override function offering the possibility to go back
to full power at any time via an electrical signal of 120VACto 277VAC
from a motion sensor, a switch, a relay or else.
CLO (available with LEDgine' only)
Pre-set driver to manage the lumen depreciation by adjusting the power
given to the LEDs offering the same lighting intensity during the entire
lifespan of the lamp.
AST (available with LEDgine' only)
Pre-set driver for progressive start-up ofthe lamp to optimize energy
management and enhance user visual comfort at start-up.
OTL (available with LEDgine' only)
Pre-set driver to signal end of life of the lamp for better fixture management.
DALI (available with LEDgine' only)
Pre-set driver compatible with the DALI control system.
' Not available with 347 and 480 volt.
I
(Consult the Pole Guide for details. and the complete line ofmountings)
IF LM NM PC
CRMO VR4
CRM6 VR6
CRM8 VR8
SAAART SYSTEM
OPTIONS
Different options are available according to your needs.
Please contact us for more information.
AMPLIGHT (available with LEDgine' only)
Amplight is the intelligent monitoring and control, automated management system
that delivers up to 35% streetlight energy savings and makes it easyto monitor and
manage the entire system, in real time. Please contact us for more information.
Not available with 347 and 480 volt.
Other options are also available according to your needs. Please contact us formore information.
POLS AND
E
POLE OPTIONS
(Consult the Pole Guide for details and the complete line of poles)
R5805 RTA906/907 SSW RTA927
Philips Lumec reserves the right to substitute materials or change the manufacturing process ofits products without prior notification. PHILIPS
For the latest updates go to www. PHI LIPs,coM/LuMEc.. `u M E C
ISH
(Consult Philips Lumeci Cotor Chartfor complete specifications)
The specially formulated LumitaI powder coat finish is available in a range of many standard colors.
LUMINAIRE
LAMP
OPTICAL SYSTEM
-VOLTAGE,
ADAPTOR,
- OPTIONS- t
MOUNTING&CONFIGURATION
POLE
FINISH
DMS55
25OPSMH
SG3
120
SMD
PH8
LM -1A
SSM8-24
GNTX.
MAINTENANCE wr
Philips4umec reserves the right to substitute materials or change the manufacturing process of its products without prior notification. PHILIPS
for the latest updates go to www. PH u.i PS.00M1LUm EC. L U M E C
LUMINAIRE ) DMS55-SG
BRACKET 7 If-2
PoLE> SPR4
n�� 1
1r�
� Vit,
LEDGINE
^PAS55-S&RNA D'VIS»',G"-LIM DNIS55-SG-NM DIMS `i -S( SM -UNM
DOMUS 55
Simplicity. Refinement. Elegance./ The Domus
Series of products — Domus, Domus 55, and Domus Small — are all
designed to complement each other and bring balance to any
environment. Their charm is undeniable. Simplicity, refinement,
and elegance, all fuset'ogetherto create harmonious beauty
through designed equilibrium. >>
BENEFITS
> Integrated ballast up to 400 watts in separate ballast compartment.
> SmartsealTM optical systems (1P66) virtually eliminate Luminaire Dirt Depreciation (LDD).
> Toolfree access for ease of maintenance.
> Dark -sky friendly SG optics provide full cut-off lighting.
> Can be powered by the LifeLED TM, Philips Lumec's state-of-the-art, energy-efficient LED light engine.
LUMINAIRES
Conform to the UL1598 and CSA C22.2 No. 250.0-08 standards
9 1/4' (235 mm)
I I
J
E E
a E
rn �
N
O
N
I I
271/2" (698 mm)
DMS55
EPAJ64sq.ft
Weight: 49 lbs (22.2 kg)
L LED
11 3/4"(296 mm)
�LE
a E
rn E
V r
I I
271/2" (698 mm)
DMS55-SMD
E PA:1.64:sq, ft
Weight: 49 lbs (22.2 kg)
LED = Philips Lumileds Luxeon R, CRI = 70, CCT = 4000K (+/- 350K)
System (LED +driver) Rated life =100,000 hrs'
101/2" (266 mm)
E
n
`a
u
E
d E
o E
v
v tO
N
I I
271/2" (698 mm)
LED light engine technical information for DMS55 WITH FLAT LENS
DM555-SMA
EPA:1.64 sq. ft
Weight: 49 lbs. (22:2 kg)
10"(253 mm)
I I
E J
E
E
-v io
N
N
I I
I-1
271/2" (698 mm)
DMS55-SMB
EPA: 1.64 sq, ft
Weight: 49 lbs (22.2 kg)
L70 = 100,000 HRS (AT AMBIENT TEMPERATURE = 25"LAND FORWARD CURRENT = 200 MA)
SYSTEM WATTAGE INCLUDES THE LAMPAND THE LED. DRIVER.
3 EQUIVALENCE SHOULD ALWAYS BE CONFIRMED BYA PHOTOMETRIC LAYOUT
NOTE: DUE TO RAPID AND CONTINUOUS ADVANCES IN LED TECHNOLOGY, LED LUMINAIRE DATA 15 SUBJECT TO CHANGE WITHOUT NOTICE AND. AT THE DISCRETION OF PHILIPS.
Philips Lumec reserves the right to substitute materials or change the manufacturing process of its products without prior notification.
For the latest updates go to W W W. PH wrs.COM/LURA EC.
PHILIPS
LUMEC
TYPICAL' ,
. TYPICAL .
TYPICAL ,
.
TYPICAL
TYPICAL k
TYPICAL
LED
,LUMINAIRE-
DELIVERED_,
,SYSTEM
CURRENT
CURRENT
= CURRENT CURRENT ` CURRENT,E
.HID EFFICACYRATING o BUG
LAMP
LUMENS WATTAGE' (W)
@ 120U (A) (@
208U (A) ,:Q 2401/ (A):i @ 2771/ (A)
(MA) 1
EO_UIVALENT3 '
(LM/1/y) ; '
RATING,
35W32LED4K-R-LE2F
3678 E
35 l
029.
0.17
€ 0.16
0-15. l
350
70-100 1
105.1
61 -UO -G1
35W32LED4K-R-LE3F
3859 i
35
0.29
0.17
0.16 i
035
350 j
70-100 i
110.2
B1 -UO -GI
35W32LED4K-R-LE4F
3578
35
0.29
0.17
0.16
0.15
350
70-100 EE
102.2
BI -UO -GI
35W32LED4K-R-LE5F.
3552 :
35
0.29
0.17
0.16
0.15: s
12
350'
70-100 V
107.5
B2 -UO -G1
55W32LED4KR-LE2F.
5141 €
52.
:0.40:
0.23
t 0.21 (
0.19' j
530
100.150 )
98,9..
t B7 -UO -G1'
55W32LED4K-R-LE3F.
5404 l
52 i
0.40-
0.23
i 0.21 °
0.19 "s
530
100-150 i..
103.9
I B2 -UO -G1
S5W32LED4K-R-LE4F'
5002` i
52
0.40
023
0.21'
0.19'
530
100-.150
96.2
B1 -UO -G1
55W32LED4K-R-LE5F1
4966
52 j
0.40 i
023
? 0.21
0.19
530
100-150
95.5
63 -UO -G1
55W48LED4K-R-LE2F j.
5301 I
55 l
0.38
022
i 0.23.
0.21. I
350
100-150
96.4
i B1 -UO -GI
55W48LED4KRAE3FI.
5566. {
55. (
0.38'
022
0.23 i
0.21
350 4
100-150.
101.2
l B2 -UO -GI
55W48LED4K R LE4F
5158
l
55 i
0.38
0.22
0.23 i
0,21 y
350 i
100-150
93-8
i B1 -UO -GI
55W48LED4KRLESF.
5120
55 8.
0.38 I
0.22
I 0.23' !
0:21 j
350 I
100-150 !
93.1
i B3 -UO -G]'
80W48LED4K-R-LE2F
7454 I
79. )
O.63 I
0.36
i 0.34 !
031 i
530
150-175
94.3
162 -UO -GT
80W48LED4K-R-LE3F
7833I
79
0.63
0.36
l 0.34
0.31
530
150-175 j
99.2
B2 -UO -G2
8OW48LED4K R LE4F
7252.
79
0.63 E
0.36
i 0.34
0.31 i
530
150-175
913
y B2 -UO -G2
8OW48LED4K-R-LE5F
7200
79
0.63
036
0.34 f
0:31 j
530
150=175: )
91:1
I B3 -UO -GI
70W64LED4K-R-LE2F
7478 i
71
0.58
034
0.32 i
0.3 :
350
100-150
105:3
! B2UO-GT
70W64LED4K-RAE3F
7849 f
71 1,
0.58
034
0.32 i
0.3 '
350E
100-150 i
710.6
1 B2 -UO G2
70W64LED4K-R-LE4F
7276 )
71
0.58 l
034
032j(
03 !
350
100 150
102:5
) B2 -UO -G2
70W64LED4K-R-LE5F
7223
71
0.58 !
034
032
03 E
350 iii
100-150
101.7
163 -UO -GT
110W64LED4K-R-LE2FI
10565. 1
103 l
0,8 E
046
i
; 0.42
0.38 i
530
175-200 ?
102.6
f B2 -UO -G2
110W64LED4K R LE3FI
11097 '
103
0.8 I
046
0.42
0.38
530
175-200
107.7
B3 -UO -G2
11OW64LED4K-R-LE4FEL
10279
103 3
0.8
046
0.4Z
0.38
530
175-200 !
99.8
B2 -UO -G2
110W64LED4K-R-LE5F.
10206'
187
103 1
0:8
046
0.42 '
038 {
530 i
175-200 i
99.1
B3 -UO -G2.
90WSOLED4K-R-LE2F
9163
iiq
:0.78 l
0.43
0.40
0.34 (
350 )
150-175. {
105,3
i 62 -U0 -G2
90W8OLED4K R LE3FjjF
9626 2
87 ;
0.78
043
I 0.40 (
0.34
350 i
150-175
110;6
l B3 -UO -G2
90W80LED4KR-LE4E
8915
87
0.78 i
043
0.40 i
0.34
350
150-175 (
102;5
62 -UO -G2
90W80LED4K-R-LE5F
885187
078
043
0.40" i
0.34 i
350 {
150-175
101.7
B3 -UO -G2
135W80LED4K-R-LE2F
12894 l
129 l
1.15 i
061
0.58 i
0.5 1
530.
250-320 }
100.0
; 63 -UO -G2
135W80LED4KR-LE3Fl
1354¢.3
129
1.15 l
061
058
05
530 I
250-320 t
105:0
B3 -UO -G2
735WSDLED4K-R-LE4F,
72545 I
129 ;
7.15 t
061
`. 0-58
0.5 t
530
250-320 (
97.2
( B3 -UO -G2
135W8OLED4K R LE5Fi
12454 I
129 !
1.15
0.61
058 E
0.5
530 )
250-320
96,5
B4 -UO -G2
L70 = 100,000 HRS (AT AMBIENT TEMPERATURE = 25"LAND FORWARD CURRENT = 200 MA)
SYSTEM WATTAGE INCLUDES THE LAMPAND THE LED. DRIVER.
3 EQUIVALENCE SHOULD ALWAYS BE CONFIRMED BYA PHOTOMETRIC LAYOUT
NOTE: DUE TO RAPID AND CONTINUOUS ADVANCES IN LED TECHNOLOGY, LED LUMINAIRE DATA 15 SUBJECT TO CHANGE WITHOUT NOTICE AND. AT THE DISCRETION OF PHILIPS.
Philips Lumec reserves the right to substitute materials or change the manufacturing process of its products without prior notification.
For the latest updates go to W W W. PH wrs.COM/LURA EC.
PHILIPS
LUMEC
LED = Philips Lumileds Luxeon R, CRI = 70, CCT = 4000K (+/- 350x)
System (LED+ driver) Rated life =100,000 hrs,
LED light engine technical information for DMS55 WITH PRISMATIC GLOBE
i . TYPICAL
, TYPICAL
; TYPICAL I,
TYPICAL , :
I TYPICAL .,
TYPICAL ? '
LED
I
LUMINAIRE':
'
=,,DELIVERED
-y
SYSTEM
: CURRENT I CURRENT ':CURRENT :,CURRENT ,CURRENT, HID
i EFFICACYRATING 1 BUG --
LAMP- {3{3,.LUMENS
,o
WATTAGP(W) ; @120V(A) s @,208V(A),;.@,240V(A),
RATING,L
@277V(A)
(SAA),.-
' EOUIVALENT3?
-;- (LM/.W) !
RATING
35W32LED4K R-LE2A]
3694 ,(
35
0.29 1
0.17
0.16 k
0.15 i
350
70-100
f 1055
81 -U2 -G1
35W32LED4KRLE3AIII111
3918 I
35.
0.29
0.17
0.16
0.15
350
70-100
111.9.
f B1 -U2 -GI
35W32LED4K-R-LE4A
3693. t
35
.0.29
017
0.16. 3
0.15 i
350
70-100
f 105.5
1 Bl -U2 -G7
55W32LED4K-R-LE2A
5164
52
0.40
0.23.
0.21 I
0.19
530
100750
I 99.3
B1 -U3 -GI
55W32LED4K-R-LE3A..
5478 {
52
a. 0.40
0.23.
0.21 I
0.19 j
530
100-150
i 105.3
B2 -U2 -G2
55W32LED4K-R-LE4A!
5163 ,a
52
0,40
0,23
0,21
0,19 i
530
100-150
99.3 "
161-U3=G2
55W48LED4K-R-LE2A
5325
55
t :0,38
0,22 �.
023 E
0.21.
350.
100-150
96.8.
B1 -U3 -G1
55W48LED4K R-LE3A
5648
55.
0.38
0.22
0.23
0.21 l
350
100-150
102.7
j B2 -U3 -G2
55W48LED4K-R-1-E4A}...
5324
55
038
0.22 i
!
0.23 E
0.21
350
100-150
#. 96,8
: B7 U3 -G2
80W48LED4K-R-LE2A
7486 i
79
0.63 !
0.36 #
034 I
031
530
150-175.
94.8
B2 -U3 -G2
80W48LED4K-R-LE3A{-
7941 :
79
0.63
0.36 i.
0.34
0.31
530.
150-175
1
{ 1005 '.
{ B2 -U3 -G2
80W48LED4K-R-LE4A
7486
74-
0.63
0.36 l:
0.34 I
0.31,
530
150-175
j 94.8
B2 -1-13-G2
70W64LED4K-R-LE2A
7511
71
:0.58
0.34
0.32 ;
0.3
350
100-150
105.8
B2 -U3 -G2..
70W64LED4K R LE3A
7967
71
0.58
0.34
0.32
0.3 '.
350
100-150
112.2
B2 -U3 -G2:
70W64LED4K R LE4A
7510
71
0.58
0.34
0.32
0.3 {
350'
100-150
1 105.8
B2 -U3 -G2
I10W64LED4K-P-LE2A
70672 i
103
I 0.8
0.46 jjj
0.42 s
0.38 j
530.
175-200
103.0
i B2 U3-GZ
I10W64LED4K-R-LE3A
11256
103
i. 08.
0.46
0.42
0.38 t
530
i 175-.200
j 109.3
B3 -U3 -G3:
11OW64LED4K R-LE4
10611
103
0.8.
0.46 :.
0.42
0.38
530
175-200
G 103.0
B2 -U3 -G2
9OW80LED4K R-LE2A
9204
87
0.78'
0.43 is
0.40
0.34. (
350
150-175
105.8
1 B2 -U3 -G2
90W80LED4K R-LE3A.:
9763
87
0,78.
0.43 9.
0.40
0.34:
350..
150-.175
' 112.2
I B2 -U3 -G2
90W80LED4K-R-LE4A
9203
87
0.78 '
0.43 1
0.40
0.34.. j
350
150-175
105.8
B2 -U3 -G2
0.42 i
0.38 {
530.
j 175-.200
j 110.8
" B3 -U7 -G2.
110W64LED4K-R-LE45t
110W641-ED4K-R-LE5S
'10604 ;
10482 1
103
) 0.8
1
jjj
135W80LED4K-R LE3
13737
129.
1-15.
0.61 :
0.58
0.5
530
250-320
1065.
B3 -U3 -G3'
35W80LED4K-R-LE4
72949
129'.
1.15.
0.61 #
0.58
0.5- I
530
250-320.
100.4
(. B2 -U3 -G2
LED light engine technical information for DMS55 WITH SAG LENS
,1 TYPICAL (
'
TYPICALTYPICAL
TYPICAL,, TYPICAL .1
,TYPICAL'
;' LED
i -
) - LUMINAIRE
'
DELIVERED `;
.,,SYSTEM ..
CURRENT
CURRENT'S 'CURRENT # CURRENT CURRENT HID
ITFFICACYRATING,�i BUG-';
.LAMP ." ;,LUMENS WATTAGE?(W)',.@120V(A). @;208V(A);#@'240V(A) @'277V(A)1=
(MA)'
=EOUIUALENi' (LMIW)
RATING,L
35W32LED4K-RLE25
2867
35
t 0.29
0.17
0.16
0.15
350
jj 70-100
81-9
B7 -U1 -G1
35W32LED4K-R-LE35
3972 ,
35
1 0.29
0.17
0.16 i
0.15 (
350
! 70-100
113.5 -
Bl U1 -G7
.35W32LED4K-R-LE45
3691
35:
0.29..
0.17.
0.16 :i
0.15.. I
350
70-100
. 105.5
I B1 -U1 -G1
35W32LED4K-R-LE5S
3649
35
0.29
0,17
0.16 -3
0.15 {
350
I 70-100
I 104.2
1 B2 -U1 -.G1.
55W32LED4KR-LE2S
5232 $
52
$ 0.40
023
1.
0.21 .�
0.19. )
530
100-150
( 100.6
131111-Gl
55W32LED4K R-LE35
5553
52
0,40
423
1 0.21 j
0.19
530
100-150.
106.8
B2 -U1 -G1
55W32LED4K-R-LE4S.
5160
52
, 0:40
0.23
0.21 ?
019 f
530.
i
I 100-.150
#. 99.2
I B1 -U1 -G1
55W32LED4KR-LE55
5101
52
; 0.40
023
0.21 j
0.19
530
i 100-150
i 98.1
B3 -U7 -G1
55W48LED4K R-LE2S'
5395
55..
i 0,38 I
0.22
j 0.23
0.21
350
100-.150
98,1
B1 -U1 -GT
`55W48LED4K-R-LESS
5726
55
1 038
0.22
1 0.23
0,27..
350
100-150
104,1
i B2 -U1 -G1
55W48LED4K-R-LE45a
53ZQ
55
{ 0.38
0.22
; 0.23
0.21 i
350
100-150
96.7
BI -U1 -G2
.55W48LED4K-R-LE55
5259.
55 -
1 038
0.22
j 0.23
0.21. i
350
; 100-150
; 95.6
B3 -U1 -GI
80W48LED4K R LE2S
7585
7963
-0.36
0.34 a.
0.31s
530.
gSg 150-175
j 96.0.
B2 -U1 -GI
80`N48LED4K-R-LE3Sj
8051
79
i 0:63
0.36
0.34
0.31:
530.
1 150-175.
1 101.9
62-1-11-G2
8OW48LED4K R LE451
7481
79
0.63
0.36
E 0.34
I
0.31
530
150-175
94.7
B2 -U1 -G2
8OW48LED4K R LESS.
70W641-R-LE2S
7395
79
i 0.63 i
0.36
0.34
0.31.. !
530
r 150 -175
3
B3 -U1 -G2
7611
710,58
0.34
.
3
D7.2
! B2 -U1 -GI
70W64LED4K-R-LE3S':
8077
71
i 0.,58 #
.0.34
0.32
0.3
350
100-.150
113.8
62 -U1 -G2
10W64LED4K-R-LE45
7505 I
71
.
.G
.
.
62U1=G2. .
70W64LED4K-R-LE5S'
7419
71
0.58 j
434
1 0.32 '
0.3' I
350
1 100.150
i IU4.5
B3 -U1 -G2
11OW64LED4KR-LE2S..10752
33
103
3 0:8. I
OA6
I 442
0.38 i
530.
175-200
1 1044
B2 -U1 -G2
110W64LED4K R-LE35:
11412 (
1030.8
0.45
0.42 i
0.38 {
530.
j 175-.200
j 110.8
" B3 -U7 -G2.
110W64LED4K-R-LE45t
110W641-ED4K-R-LE5S
'10604 ;
10482 1
103
) 0.8
1
0.46
I 0.42s
038 �
530
I 175-200
{ 103.0
B2 -U1 -G2
`
103
0.8
0.46
I 042 (
0.38.
530
175-200
107:8
# B4 -U1 -G2
90WSOLED4K-R-LE25i
9325
87
� 0:7&
043
� 040 1
0.34 ;
350
� 150-175
i
� 107.2
i B2 -U1 -G2.
90W80LED4K-R-LE35t
9897
87
i 0,78
043
I 040 s
0.34 i
350
` 150-175
S, 113.8
83 -U1 -G2
90W80LED4K-R-LE4SI
90W80LED4K-RLE5S
9197.
9091. I
87-
87
0.78
043
l 040
034. I
i
350
P{ 150-175
105:7
{
B2 -U1 -G2
0:78 {
043
I 040
0.34
350
g 150-.175
i 104:5
63 -U1 -G2.
135W80LED4K-R-LE25
13122 I
129
1.15 1
0.61
) 0.58 !
0.5:
530
j, 250-320
f 101.7
B3 -U1 -G2
135W80LED4K-R-LE3SI
13927
129
s 1:15
0.61
om
0.5. E
530
t 250-320
1, 108.0
i B3 -UI -G3
135W80LED4K-R-LE4Si
12941129
a 1,15
0.61
1 0.58 (
0.5
530
250-320
100.3
B3 -U2 -G2
135W80LED4K-R-LESS
12792. 1
129'
1 .7:15 I
061
058
0.5
530
j 250-320
99,2
i
B4 -U2 -G2
L70= 100,,000 HRS (AT AMBIENT TEMPERATURE= 25 LAND FORWARD CURRENT = 200 MA)
SYSTEM WATTAGE INCLUDES THE LAMPAND THE LED DRIVER.
3 EQUIVALENCE SHOULD ALWAYS BE CONFIRMED BYA. PHOTOMETRIC LAYOUT.
NOTE :: DUETO RAPID AND CONTINUOUS ADVANCES IN LED TECHNOLOGY,LED LUMINAIRE DATA LS SUBJECT TO CHANGE WITHOUT NOTICE AND AT THE DISCRETION OF PHILIPS,
Philips Lumec reserves the right to substitute materials or change the manufacturing process of its products without prior notfication.. PHILIPS
For the latest updates go to W W W.PHILI PS.COM/LUM EC. L U.M E..E
LANAPS/LED
VO L
120 / 208 / 240 / 277 / 347/ 480
WATTAGE
'sG1/SG2/sG3/,SG0
IP66 rated optical system,. composed1E3F..
SGFM „
250 MH, mogul
✓
desired distribution, assembled with
✓
320 MH, mogul
RJ`:
sealed onto the lower part of the heat sink.
N/A
400 MH, mogul
RJ
IP66 rated optical system, composed
N/A
250 HPS, mogul
- ✓
desired distribution, assembled with globe
N/A
400 HPS, mogul
✓
permanently sealed onto the lower
N/A
250 PSMH, mogul
✓
,i
400 PSMH, mogul
RJ
'N/A
!:Available N/A: Not available RJ: Reduced jacket required
HS House shield
SLG Tempered glass sag lens
PH8 Photoelectric cell
(available with SMB and SMD)
CP55 Decorative cover for photoelectric cell
OP-11TICAL E V LED
re7E�mzN Flat lens
LEZF: Asymetrical
IP66 rated optical system,. composed1E3F..
Asymetrical
ofindividualpre-oriented lens toachieve
LE 4F: Asymetrical
desired distribution, assembled with
LE5F: Symmetrical (square)
a tempered -glass flat lens permanently
> House shield available in option (HS)
sealed onto the lower part of the heat sink.
qtFi, Sag lens
LE2S: Asymetrical.
IP66 rated optical system,composed
LESS: Asymetrical
ofindividualpre-oriented lenstoachieve:
LE45:Asymetrical
desired distribution, assembled with
LESS: .Symmetrical (square)
a tempered -glass sag lens permanently
> House shield available in option (HS)
sealed onto the lower.. part of the heat sink.
Prismatic globe
LE2A: Asymetrical
IP66 rated optical system, composed
LE3A: Asymetrical
of individual pre -oriented lens to achieve
LE4A' Asymetrical
desired distribution, assembled with globe
> LE2A/LE3A/LE4Aavoilab/e
having an inner prismatic surface
in acrylic and borosi6cate:
permanently sealed onto the lower
> House shield available in option (HS)
part ofthe heat sink.
Add suffixACDR or PC to optical system code.
' Photometry available on Philips Lumec website www.philips.com/lumec,
OPTICAL HID
(Lamps not Included)
SG Optics SGO: Symmetrical
Segmented cut-off reflector system set in SG7: Symmetrical
faceted arc -image duplicating patterns SG2: Asymmetrical
SG3: Asymmetrical
SGFM: Forward throw
> House shield available for SG2 and SG3
' Photometry available on Philips.Lumec web site www.philips.com/lumec.
L
120 / 208 / 240 / 277 / 347/ 480
> Multi-topballast also available.
8 MAI
The luminaire is suspended by means of a mounting adaptor with a 11/4" (32mm)
npt threaded hole accepting a threaded tube from the mounting.
(retrofit adapturfor existing mounting)
SMB
The luminaire is suspended by means of a decorative: side -mounting
cast -aluminium adaptor. This adaptor accepts tubes from 1.5/8"to 2 3/8"
(41 to 60 mm) and is adjustable to more or less 5'.
SMD
The luminaire is fixed by means of a side -mounting cast -aluminium adaptor.
This adaptor accepts tubes from 1 5/8"to 2 3/8" (41 to 60 mm) and is
adjustable to more or less 5'.
Philips Lumec reserves the right to substitute materials or change the manufacturing process of ifs products without prior notification, PHILIPS
For the Latest updates go to WWW.PHILIPS.COM/LUMEC,
LUMEE
FRONT VIEW
(NTS)
NOTES:
1. MOUNTING HARDWARE SUPPLIED BY OTHERS
2. FIXTURES ARE HANDCRAFTED. DIMENSIONS MAY VARY PLUS OR MINUS 4"
3. ELECTRIC LIGHTS SUPPLIED WITH 18/2 WIRE WITH GROUND
4. GAS LIGHTS SUPPLIED WITH 16" COPPER GAS LINE AND 16" x 4" GAS LINE ADAPTOR
BEVOLO GAS & ELECTRIC LIGHTS
LIGHT: FRENCH QUARTER w/ LONDON TOP and LONDON BOTTOM
RACKET: RODIN BRACKET
5"
SCAL
BACK
DRW BY: I JJG
DATE: I APP. BY: I MAJ
9-17-2010IREVISION] 4
rr"P TTTFTXT
(NTS -BRACKET ONLY)
SIZE:
11 ,,FQ
J 21"FQ
24"FQ
A:
37"
45"
49"
B:
10 2"
11 2"
13 4"
c:
19"
19 2"
21"
$
D:
5"
5"
5"
E:
12 $"
1511
18"
4
F:
16 4"
19 8"
20 8"
G:
711
811
9 111
COPYRIGHT 2009, BEVOLO GAS & ELECTRIC
LIGHTS. DRAWINGS & DESIGNS ARE OWNED
BY BEVOLO AND REMAIN THE SOLE AND
EXCLUSIVE PROPERTY OF BEVOLO GAS &
ELECTRIC LIGHTS. DRAWINGS AND DESIGNS
SHALL NOT BE DUPLICATED IN WHOLE OR
PART.
NOTE:
DUMPSTER PAD SHALL HAVE AN ENCLOSURE CONSTRUCTED OF
NON-COMBUSTIBLE MATERIALS THAT COORDINATE WITH THE FACADE OF THE
BUILDING. THESE MATERIALS SHALL BE SUBMITTED TO AND APPROVED BY THE
PROJECT ARCHITECT. THE ENCLOSURE SHALL MEASURE APPROXIMATELY
13'x13' WITH A GATE ON THE SIDE FACING THE PARKING LOT. THE GATE SHALL
HAVE THE ABILITY TO REMAIN CLOSED THROUGH THE USE OF A CANE LATCH.
TOWN CENTER EAST FEBRUARY
26, 2019DUMPSTER DETAIL
TOWN CENTER EAST FEBRUARY
26, 2019MAIL KIOSK DETAIL
1
42
3 6
12
SHINGLES SHALL MATCH BUILDING
EXTERIOR FINISH OF STRUCTURE
SHALL BE COORDINATED WITH THE
EXTERIOR OF THE BUILDING.
BOTTOM SHELF
FLORENCE
4CADD/CADS
MAILBOX,
OR EQUAL
PLAN ELEV. 2 & 4 ELEV. 1 & 3
FLORENCE
4CADD/CADS
MAILBOX,
OR EQUAL
MAIL KIOSK DETAIL
NOTE: CONTRACTOR SHALL COORDINATE FINAL MAILBOX CONFIGURATION
WITH OWNER AND MAKE NECESSARY MODIFICATIONS TO STRUCTURE AS
NEEDED.
NTS