Loading...
HomeMy WebLinkAboutOrdinances 24-04-552 - 04/08/2024 - Amend Appendix A Fees and Other Charges to Reflect New Code in UDCSTATE OF GEORGIA COUNTY OF FULTON ORDINANCE 24-04-552 AN ORDINANCE TO AMEND APPENDIX A FEES AND OTHER CHARGES OF THE CODE OF THE CITY OF MILTON, GEORGIA TO REFLECT THE NEW CODE REFERENCES WITHIN THE NEWLY ADOPTED UNIFIED DEVELOPMENT CODE FOR THE CITY OF MILTON, GEORGIA BE IT ORDAINED by the City Council of the City of Milton , GA while in a regularly called council meeting on April 8, 2024, at 6:00 p.m. as follows : SECTION 1. That Appendix A Fees and other Charges of the Code of the City of Milton, Georgia is amended as shown in Exhibit "A", attached hereto as if fu lly set forth herein, to reflect the new code references con t ained within the newly adopted Unified Development Code for the City of M ilton , Georgia; and SECTION 2. That all ordinances , parts of ordinances, or regulations in conflict herewith are repealed; and SECTION 3. That this Ordinance shall become effective upon its adoption. ORDAINED this the 8th day of April, 2024. Attest : EXHIBIT "A " • THE COQE O F T HE Append ix A FEES AND OTHER CHARGES Appendix A FEES AND OTHER CHARGES 1 FEES A ND OTHER CHAR GE S Section Descriotion Conditions Amount (in dollars) Chapter20- Environment ~ Civil penalties May impose a penalty not t o exceed ~ for violation $1 ,000 .00 per da y for each day the Sec. 11 .4 .3.e . sub ject to violation remains unremedied after receipt equitable of the notice of violation relief; nuisance and abatement ~ Criminal $1 ,000 .00 per day ~ penalties for Sec. 11.2 .2.C.3.e. violation related to equitable relief; nuisance and abatement ~ Stormwater Plan review fee s Up to 3 reviews-Subsequent revision Sec . 11.4.3.F. management review s w ill require 50 % of the origina l fee , application a minimum of $350 .00 review Resident ial concept $350 .00 + $5 .00/lot plans Commercial con cept $350 .00 + $5 .00/disturbed acre plans Residential $350 .00 + $20 .00/lot development plan s Commercial $350 .00 + $20.00/disturbed acre development pla ns ~ Project site $50 .00 m i nimum Se c. 11 .6.3.C. reinspection fee ;ig §4~{a) Monetary Not to exceed $2 ,500 .00 per day for each Sec . 11 .6.3 .E.1 . penalties(vioiat violatio n ion) Amendment prepared for th e City of Milton Ma yor and City Counc i l meeti ng on Fe bruary 21 , 2024 (Firs t Pre sen t ation on Fe br uary 5, 2024 ) Pa ge 1 of 10 EXHIBIT "A" -THE CODE OF THE Append ix A FEES AND OTHER CHARGES ~ MiAiA'IUA'I GBAauetiAg laAa G2SQ .QQ faF eaeti "iBlatiBA BF eaeA aa•t BA ~ ~ aistuFBaAEe aet i¥itie s wAiEA a •;iBlatiBA eilists witABut a laAa aistuFBaAee JleFA'lit BF lauileiRg lleFA'lit (fiFst ~ ~ MiAiA'IUA'I GBAauetiAg laAa G1 ,QQQ .QQ fBF eaetl YiBlatiBA BF eaEA aa',' BA ~ ~ aiStUFBaAee aeti•;ities WAIEA a v1BlatiBA eMists witABUt a laAa aistuFBaAee t3eFA'tit BF BUilaiAg t3eFA'lit (SeEBAB ,, ~ MiAiA'IUA'I baelE Bf l3FBt3eF G2SQ .QQ 13eF ,1iBlatiBA ~ ~ iAstallatiBA BF A'laiAteAaAee Bf stFuetu Fa 1/vegetati• •e eest A'laAageffleAt ~ ~ MiAiA'IUA'I l,IJBFIEiAg UAaeF a StBl3 ~ ~ ~ 'NBFIE BFBeF (fiFSt ~ ~ MiAiA'IUA'I WBFIEiAg UAaeF a StBl3 G1 ,SQQ .OO ~ ~ WBFIE BFaeF (seeBna BF suese11uent BffeAse) W S91(el Land Permit Fees Based on Sec. 11.6.5 .A.5. disturbance-Valuations Local permit application fee, per acre Total valuation Value calculation is based on calculation of inspections per the land development valuation table below $1.00 to $5 ,000.00 $300.00 $5,001 .00 to $300.00 for the first $500.00 plus $150.00 $20,000.00 for each additional $1,000.00, or fraction thereof, to and including $20,000.00 $20,001.00 to $2,250.00 for the first $20,000.00 plus $100,000.00 $100.00 for each additional $1,000.00, or fraction thereof, to and including $100,000 .00 $100,001.00 to $10,550 .00 for the first $100,000.00 plus $250,000.00 $50.00 for each additional $1,000 .00, or Amendment prepared for the City of Milton Mayor and City Counc i l meeti ng on February 21, 20 24 (First Presentation on February 5, 2024) Page 2 of 10 EXHIBIT "A " -THE CODE OF THE Appendix A FEES AND OTHER CHARGES fraction thereof, to and including $250,000 .00 $250,001 .00 to $18,050.00 for the first $250,000 .00 plus $500,000 .00 $25 .00 for each additional $1,000 .00, or fraction thereof, to and including $500,000 .00 $500,001.00 to $24,300 .00 for the first $500,000.00 plus $1,000,000 .00 $15 .00 for each additional $1 ,000 .00, or fraction thereof, to and including $1,000,000 .00 $1,000,001.00 and up $31,800 .00 for the first $1 ,000,000 .00 plus $10.00 for each additional $1,000 .00, or fraction thereof Land Development Valuation Table Based on Inspections Road vert & section $16 .00/ln . ft . Curb and gutter $6 .50/ln. ft. Base and paving $25 .00/ln. ft . Commercial driveway $0.75/sq . ft. Storm drainage $20.00/ln. ft. Wastewater $22 .00/ln. ft . Water main $16.00/ln . ft . Sidewalk $5 .00/sq. ft . Erosion Control Fee Residential fee Commerc ial/other fee Other Applicable Fees Landscape installation $350.00/disturbed acre x 3% inspection Administrative fee $25 .00 GIS Monument fee (as $1,050 .00/monument required) Overnight delivery or $60.00 courier fee (as required) ~ Land $80.00 per disturbed acre Sec . 11 .6.5.A.6. disturbance- State permit, additional per acre fee ~ Gi~•il JleRillt',I ~~a.,. i~Jlase ii JleRillty Rat ta e11eeea iaF "'ialiltiaR H,QQQ QQ JleF Oil'!' iaF eaeR ea•,• tRe Amendment prepared for the City of Milton Mayor and City Counc il meeti ng on Februa ry 21, 2024 (Fi rst Presentation on February 5, 2024) Page 3 of 10 EXHIBIT "A" -THE CODE OF THE Appendix A FEES AND OTHER CHARGES Felalea le •;ielatieA FeFAaiAs ljAFeFAeaiea aicteF FeeeiJll Reise eeAtFel ef !Re ABliee ef •;ielaliBA Chapter 46-Solid Waste 46-3 Collection fee TBD for the disposal and collection of waste 46-70(a) Infrastructure 5% of the company 's gross receipts to maintenance customers within the city fee Chapter 48-Streets, Sidewalks and Other Public Places 48-259 Traffic calming $500.00 per plan plan fee 48 4GG{e) Sign $250 .00 per sign Sec . 10.4 .9.B.4 . replacement fee ~ Sign $100.00 value per sign Sec. 10.4.9.B.5. performance bond 48-560(c) Penalties for $1 ,000 .00 per instance and location violation of restoration of lanes 48-561 Pena lties for $1 ,000.00 per day per location (b)(4) violation of removal 48-584(c) Pena lties of 125% of the cost the city in curs in obstruction of removing the property plus a fine of right-of-way $1,000.00 (personal property) 48-584(d) Penalties of 125% of the cost the city incurs in obstruction of removing the property plus a fine of right-of-way $1 ,000.00 (illegal dumping) 48-585 Penalties of 100% of the cost the city in curs in (b)(l) location within removing the property plus a fine of one- Amendment prepared for the City of Milton Mayor and City Counc il meeting on Fe brua ry 21, 2024 (Firs t Pre sentation on February 5, 2024 ) Page 4 of 10 EXHIBIT "A" -THE CODE OF THE Append ix A FEES AND OTHER CHARGES the right-of-half the cost of the largest permit fee for way (new the site unpermitted installations) 48-585 Penalties of No fines (b)(2) location within the right-of- way (existing installations) 48-585 Penalties of 125% of the cost the city i ncurs in (b)(3) location within removing the property plus a fine of the right-of-$500.00 way (temporary items) 48-587(a) Penalties of $100.00 per incident violation for agricultural uses 48-587 Penalties of $100.00 fine per incident, plus the cost of (b)(2) violation of repairs to the road, and plus the cost of agricultural certified traffic control by the person who equipment caused the damages uses 48 a,a fel A1212lication for O.C.G .A §366-66(-S(al{l), (al{2) and (al{3) ~es;. ~.4 .4 .C.5. Small Wireless Such maximum a1212lication fees shall Facilities and automaticall~ increase on Jan 1 of each ~ear Ante nnas beginning Jan 1, 2021 as 12rovided un O.C .G.A . §36 -66C -S(b). 4811&3!jl Anniversa r~ of o.~.G.A. §366-66C-S(al(4), (a)(~l Sec. 8.4 .4.C.9 . iss uance of permit 411 lliilkl 0.C.G .A. §366 -66C -S(al(6) and (al(7) ....,__ 8 .4 .4 .C.10. 4811UIMI Occ u12 ies the restore the right-of-wa~, to the extent Sec . 8 .4 .4.C .12 . publi c rights -of-11racticable in the reasonable judgment of the wa~ without cir,:, to its condition 11rior to the un11ermined obtai ning a collocation or installation and to charge the 12er mi t. res12ons i ble wireless 12rovider the reasonable, documented cost of the cit,, in doing so, 12lus a oena ltv not to exceed Sl ODO.DO . Chapter SO- Subdivisions Amendment prepared for the City of Milton Mayor and City Counc il meeting on February 21, 2024 (Fi rst Pre sentat ion on Feb r uary 5, 2024 ) Pa ge 5 of 10 EXHIBIT "A" -THE CODE OF THE Append ix A FEES AND OTHER CHARGES ~ Penalties of No less than $1 ,000.00 and not to exceed Sec . 12.9. violation $2,500.00 ~ Plat application $25 .00 administrative fee+ $350.00 review Sec . 12.6 . 7.A. fee+ $5 .00/lot 34 ;i,u !ell4l Recording of $25.00 administrative fee per subdivision+ Sec . 12.6. 7.A . p lat and recording fees as established by the Fu lton declaration of County Clerk of Superior Court covenants, conditions, and restrictions at Fulton County Clerk of Superior Court ~ Fees for See sections 48-466, 20 -591 and 22 -50 Sec . 12.6 . 7.A. required inspection, water and sewer connection, curb cut, and street sign ~ Bond fee $250.00 legal processing and $50.00 Sec . 12.6. 7 .c. administrative fee Ch apter 54- Telecommu nications ~ App lication fee $2,000.00 plus the actua I consulting cost Sec . 8 .4 .5 .C.4 . up to $7,500.00 ~ Te lecommunic $1,000.00 per tower and $1,000.00 per Sec. 8.4.5.F.3. ations antenna array operating license ~ Lease $250.00 legal processing and $50.00 Sec . 8.4.5 .1.9. application fee administrative fee ~ Lease As negotiated by the city manager or Sec . 8.4.S.Q. co m pensation designee and approved by city council ~ Late lease 2% of the annual rental fee for each day or Sec. 8.4.5.Q. payments portion thereof beyond the due date Chapter 60-Vegetation ~ Pena lties for Not [to] exceed $1,000.00 per vio lation per Sec. 11.1.1.P.l. violation day Amendme nt prepared for the City of Milton Mayor and City Council meeting on Feb rua ry 21 , 2024 (Fi rst Presentation on February 5, 20241 Page 6 of 10 ~ ~ 60-48 Sec. 11 .1.2.N.4. Sec . 11 .1.2.D .5 . Sec . 11 .1.3.C.7. Sec. 11.1.3.H.16. EXHIBIT "A" -THE CODE OF THE Append ix A FEES AND OTHER CHARGES TFee jlreteetieA ,0.11 tree flFeteetieA ~ feAees FftljSt ee aeeemflaAiea 13~• "Stav Qijt " aAa "Tree Saye " sigAage , wl:lieR ma~ ee flijFERasea fFBA't E8A'IA'tijAity aeYel8flA'tCAt feF a fee Penalty for If specimen trees are violation of removed or have their specimen trees root protection zones disturbed without permission lns12ection after non - comgliance Tree removal 12ermit a1212lication {includes 12re - a1212roval site visit and gost - a1212roval com12liance insgectionl Tree Cano12y Plan Review and Ag12roval A1212lication {includes 12re - ag12roval site visit tree E!rotection insgection, certificate of occu12ancy insgection, and 1 and 3 year follow -u12 ins12ections Tree Canogy Value for Estimating Tree Fund Pal!ments $5 .00 jleF SigA The unit value of the specimen tree is doubled and that becomes the unit value that must be compensated for $50 12er ins12ection $25 12er tree or 12er 1,600 sg .ft . of tree cano12y cover or 12ortion thereof with a ma ximum f ee of $150. $300 for the first acre, S50 for each additional acres; $500 for 5 acres and greater $31.25 ger 100 sg .ft . Amendment prepared for the City of Milton Mayor and City Counci l meeting on February 21 , 2024 (First Presentation on February 5, 2024) Page 7 of 10 Chapter 64-Zoning 6~ 369!2)e ~ e4--WP ~ ~ Se c. 12.8.1.A.1. e4-1-&9G ~ Sec. 12.4 .2.A.c.i. ~ Sec . 12.4.3 .F. EXHIBIT "A" -THE CODE OF THE Append ix A FEES AND OTHER CHARGES IRElljsieRaf'J' R81jSiRg !iR lielj ~ AlimiRisiFaiiaR ef iRElljsieRafV ~ Approval of Certificate of alterations or endorsement for new commercial and construction by multifamily the ORB Media Based on permit type production requested and minimum permit fee processing time Application fee Resident ial d istr icts : R-1, for a R-2, R-2A, R-3, R-3A , R- concurrent 4, R-4A, R-5, R-SA , NUP, variance CUP , MHP AG -1, R-6, TR, A, A-1, 0 - I, C-1, C-2, M -lA, M -1, M-2, MIX and nonresidential uses in residential districts listed above All signs Appeal application Single-family res idential zoning districts and AG - 1 district for residential uses only Multifamily districts, nonresidential d istricts, and commercial uses in residential or AG -1 districts ~ ~ $350.00 for each project review Low impact permit fee-$100.00, high i mpact permit fee-$250.00, additional $100.00 per day for any permit rece ived less than the minimum number of processing days required in subsections e4- 1616!5)a . 8.10 .1.E . and 6~ 1616!6)a . 8.10 .1 .F. $250 .00 plus $SO .OD for each additional concurrent variance requested on the same piece of property $350.00 plus $100 .00 for each additional concurrent variance requested on the same piece of property $350.00 plus $100 .00 for each additional request $250.00 plus $SO .OD for each additional variance request on the same piece of property $350.00 plus $100.00 for each additional variance request Amendment prepared for the City of Milton Mayor and City Council meeti ng on Fe bruary 21 , 2024 (First Pre sentation on February 5, 2024) Page 8 of 10 EXHIBIT "A" -THE CODE OF THE Appendix A FEES AND OTHER CHARGES All signs $350.00 plus $100 .00 for each additional variance request 64-2175 Rezoning petition To Acreage AG -1, R-1, R-2, R-2A, R-0 to 5 $500.00 3, R-3A, R-4, R-4A , R-5, R-5A ~BF eMeise ta u 5+ to 10 $1,000.00 10+ to 20 $1,500.00 20+ to 100 $2,000.00 100+ $2,500.00 plus an additional $40 .00 per acre for any portion thereof over 100 acres . Maximum fee = $10,000 R-6, TR , A, A-1, 0-1, C-1, Oto 5 $750.00 C-2, M -lA, M -1, M-2, H 5+ to 10 $1 ,500.00 10+ to 20 $2 ,000.00 20+ to 100 $2,500.00 100+ $3 ,000 plus an additional $50 .00 per acre for any portion thereof over 100 acers. CUP, NUP, MHP Any acreage $2 ,000.00 plus $50 .00 per acre or any portion thereof. Maximum fee = $10,000 .00 MIX Any acreage $1 ,000.00 plus $50.00 per acre or any portion the reof. Maximum fee = $10,000.00 64 222l!bl Penalties for Where a determination $1,000.00 ---j Formatted Table Sec . 12.9.2.B. violation is made that property is in violation of zoning ordinance, and any other codes and laws enforced by the community development Amendment prepared for the City of Milton Mayor and City Council meeting on February 21 , 2024 (First Presentation on February 5, 2024) Page 9 of 10 j EXHIBIT "A" -THE CODE OF THE Appendix A FEES AND OTHER CHARGES department, and all reasonable efforts and means to obta in compliance have been exhausted li4 :!:!91i!f) Penalties for Not exceed $1 ,000 .00 per day Sec . 9.3 .7.A.S. violation of signs ~ Application to $350.00 per review Sec . 12.7.4.A. HPC for certificate of appropriatenes s Amendment prepa re d for the City of Milton Mayor and City Council meeting on February 21 , 2024 (Fi rst Presentation on February 5, 2024) Page 10 of 10