HomeMy WebLinkAboutOrdinances 24-04-552 - 04/08/2024 - Amend Appendix A Fees and Other Charges to Reflect New Code in UDCSTATE OF GEORGIA
COUNTY OF FULTON
ORDINANCE 24-04-552
AN ORDINANCE TO AMEND APPENDIX A FEES AND OTHER CHARGES OF THE
CODE OF THE CITY OF MILTON, GEORGIA TO REFLECT THE NEW CODE REFERENCES
WITHIN THE NEWLY ADOPTED UNIFIED DEVELOPMENT CODE FOR THE CITY OF
MILTON, GEORGIA
BE IT ORDAINED by the City Council of the City of Milton , GA while in a regularly called
council meeting on April 8, 2024, at 6:00 p.m. as follows :
SECTION 1. That Appendix A Fees and other Charges of the Code of the
City of Milton, Georgia is amended as shown in Exhibit "A", attached hereto
as if fu lly set forth herein, to reflect the new code references con t ained
within the newly adopted Unified Development Code for the City of M ilton ,
Georgia; and
SECTION 2. That all ordinances , parts of ordinances, or regulations in conflict
herewith are repealed; and
SECTION 3. That this Ordinance shall become effective upon its adoption.
ORDAINED this the 8th day of April, 2024.
Attest :
EXHIBIT "A "
• THE COQE O F T HE
Append ix A FEES AND OTHER CHARGES
Appendix A FEES AND OTHER CHARGES 1
FEES A ND OTHER CHAR GE S
Section Descriotion Conditions Amount (in dollars)
Chapter20-
Environment
~ Civil penalties May impose a penalty not t o exceed
~ for violation $1 ,000 .00 per da y for each day the
Sec. 11 .4 .3.e . sub ject to violation remains unremedied after receipt
equitable of the notice of violation
relief; nuisance
and abatement
~ Criminal $1 ,000 .00 per day
~ penalties for
Sec. 11.2 .2.C.3.e. violation
related to
equitable
relief; nuisance
and abatement
~ Stormwater Plan review fee s Up to 3 reviews-Subsequent revision
Sec . 11.4.3.F. management review s w ill require 50 % of the origina l fee ,
application a minimum of $350 .00
review
Resident ial concept $350 .00 + $5 .00/lot
plans
Commercial con cept $350 .00 + $5 .00/disturbed acre
plans
Residential $350 .00 + $20 .00/lot
development plan s
Commercial $350 .00 + $20.00/disturbed acre
development pla ns
~ Project site $50 .00 m i nimum
Se c. 11 .6.3.C. reinspection
fee
;ig §4~{a) Monetary Not to exceed $2 ,500 .00 per day for each
Sec . 11 .6.3 .E.1 . penalties(vioiat violatio n
ion)
Amendment prepared for th e City of Milton Ma yor and City Counc i l meeti ng on Fe bruary 21 , 2024 (Firs t Pre sen t ation on
Fe br uary 5, 2024 )
Pa ge 1 of 10
EXHIBIT "A"
-THE CODE OF THE
Append ix A FEES AND OTHER CHARGES
~ MiAiA'IUA'I GBAauetiAg laAa G2SQ .QQ faF eaeti "iBlatiBA BF eaeA aa•t BA
~ ~ aistuFBaAEe aet i¥itie s wAiEA a •;iBlatiBA eilists
witABut a laAa
aistuFBaAee JleFA'lit BF
lauileiRg lleFA'lit (fiFst
~
~ MiAiA'IUA'I GBAauetiAg laAa G1 ,QQQ .QQ fBF eaetl YiBlatiBA BF eaEA aa',' BA
~ ~ aiStUFBaAee aeti•;ities WAIEA a v1BlatiBA eMists
witABUt a laAa
aistuFBaAee t3eFA'tit BF
BUilaiAg t3eFA'lit (SeEBAB
,,
~ MiAiA'IUA'I baelE Bf l3FBt3eF G2SQ .QQ 13eF ,1iBlatiBA
~ ~ iAstallatiBA BF
A'laiAteAaAee Bf
stFuetu Fa 1/vegetati• •e
eest A'laAageffleAt
~
~ MiAiA'IUA'I l,IJBFIEiAg UAaeF a StBl3 ~
~ ~ 'NBFIE BFBeF (fiFSt
~
~ MiAiA'IUA'I WBFIEiAg UAaeF a StBl3 G1 ,SQQ .OO
~ ~ WBFIE BFaeF (seeBna BF
suese11uent BffeAse)
W S91(el Land Permit Fees Based on
Sec. 11.6.5 .A.5. disturbance-Valuations
Local permit
application fee,
per acre
Total valuation Value calculation is based on calculation of
inspections per the land development
valuation table below
$1.00 to $5 ,000.00 $300.00
$5,001 .00 to $300.00 for the first $500.00 plus $150.00
$20,000.00 for each additional $1,000.00, or fraction
thereof, to and including $20,000.00
$20,001.00 to $2,250.00 for the first $20,000.00 plus
$100,000.00 $100.00 for each additional $1,000.00, or
fraction thereof, to and including
$100,000 .00
$100,001.00 to $10,550 .00 for the first $100,000.00 plus
$250,000.00 $50.00 for each additional $1,000 .00, or
Amendment prepared for the City of Milton Mayor and City Counc i l meeti ng on February 21, 20 24 (First Presentation on
February 5, 2024)
Page 2 of 10
EXHIBIT "A "
-THE CODE OF THE
Appendix A FEES AND OTHER CHARGES
fraction thereof, to and including
$250,000 .00
$250,001 .00 to $18,050.00 for the first $250,000 .00 plus
$500,000 .00 $25 .00 for each additional $1,000 .00, or
fraction thereof, to and including
$500,000 .00
$500,001.00 to $24,300 .00 for the first $500,000.00 plus
$1,000,000 .00 $15 .00 for each additional $1 ,000 .00, or
fraction thereof, to and including
$1,000,000 .00
$1,000,001.00 and up $31,800 .00 for the first $1 ,000,000 .00 plus
$10.00 for each additional $1,000 .00, or
fraction thereof
Land Development
Valuation Table Based
on Inspections
Road vert & section $16 .00/ln . ft .
Curb and gutter $6 .50/ln. ft.
Base and paving $25 .00/ln. ft .
Commercial driveway $0.75/sq . ft.
Storm drainage $20.00/ln. ft.
Wastewater $22 .00/ln. ft .
Water main $16.00/ln . ft .
Sidewalk $5 .00/sq. ft .
Erosion Control Fee
Residential fee
Commerc ial/other fee
Other Applicable Fees
Landscape installation $350.00/disturbed acre x 3%
inspection
Administrative fee $25 .00
GIS Monument fee (as $1,050 .00/monument
required)
Overnight delivery or $60.00
courier fee (as required)
~ Land $80.00 per disturbed acre
Sec . 11 .6.5.A.6. disturbance-
State permit,
additional per
acre fee
~ Gi~•il JleRillt',I ~~a.,. i~Jlase ii JleRillty Rat ta e11eeea
iaF "'ialiltiaR H,QQQ QQ JleF Oil'!' iaF eaeR ea•,• tRe
Amendment prepared for the City of Milton Mayor and City Counc il meeti ng on Februa ry 21, 2024 (Fi rst Presentation on
February 5, 2024)
Page 3 of 10
EXHIBIT "A"
-THE CODE OF THE
Appendix A FEES AND OTHER CHARGES
Felalea le •;ielatieA FeFAaiAs ljAFeFAeaiea aicteF FeeeiJll
Reise eeAtFel ef !Re ABliee ef •;ielaliBA
Chapter 46-Solid
Waste
46-3 Collection fee TBD
for the disposal
and collection
of waste
46-70(a) Infrastructure 5% of the company 's gross receipts to
maintenance customers within the city
fee
Chapter 48-Streets,
Sidewalks and Other
Public Places
48-259 Traffic calming $500.00 per plan
plan fee
48 4GG{e) Sign $250 .00 per sign
Sec . 10.4 .9.B.4 . replacement
fee
~ Sign $100.00 value per sign
Sec. 10.4.9.B.5. performance
bond
48-560(c) Penalties for $1 ,000 .00 per instance and location
violation of
restoration of
lanes
48-561 Pena lties for $1 ,000.00 per day per location
(b)(4) violation of
removal
48-584(c) Pena lties of 125% of the cost the city in curs in
obstruction of removing the property plus a fine of
right-of-way $1,000.00
(personal
property)
48-584(d) Penalties of 125% of the cost the city incurs in
obstruction of removing the property plus a fine of
right-of-way $1 ,000.00
(illegal
dumping)
48-585 Penalties of 100% of the cost the city in curs in
(b)(l) location within removing the property plus a fine of one-
Amendment prepared for the City of Milton Mayor and City Counc il meeting on Fe brua ry 21, 2024 (Firs t Pre sentation on
February 5, 2024 )
Page 4 of 10
EXHIBIT "A"
-THE CODE OF THE
Append ix A FEES AND OTHER CHARGES
the right-of-half the cost of the largest permit fee for
way (new the site
unpermitted
installations)
48-585 Penalties of No fines
(b)(2) location within
the right-of-
way (existing
installations)
48-585 Penalties of 125% of the cost the city i ncurs in
(b)(3) location within removing the property plus a fine of
the right-of-$500.00
way
(temporary
items)
48-587(a) Penalties of $100.00 per incident
violation for
agricultural
uses
48-587 Penalties of $100.00 fine per incident, plus the cost of
(b)(2) violation of repairs to the road, and plus the cost of
agricultural certified traffic control by the person who
equipment caused the damages
uses
48 a,a fel A1212lication for O.C.G .A §366-66(-S(al{l), (al{2) and (al{3)
~es;. ~.4 .4 .C.5. Small Wireless Such maximum a1212lication fees shall
Facilities and automaticall~ increase on Jan 1 of each ~ear
Ante nnas beginning Jan 1, 2021 as 12rovided un O.C .G.A .
§36 -66C -S(b).
4811&3!jl Anniversa r~ of o.~.G.A. §366-66C-S(al(4), (a)(~l
Sec. 8.4 .4.C.9 . iss uance of
permit
411 lliilkl 0.C.G .A. §366 -66C -S(al(6) and (al(7)
....,__ 8 .4 .4 .C.10.
4811UIMI Occ u12 ies the restore the right-of-wa~, to the extent
Sec . 8 .4 .4.C .12 . publi c rights -of-11racticable in the reasonable judgment of the
wa~ without cir,:, to its condition 11rior to the un11ermined
obtai ning a collocation or installation and to charge the
12er mi t. res12ons i ble wireless 12rovider the reasonable,
documented cost of the cit,, in doing so, 12lus a
oena ltv not to exceed Sl ODO.DO .
Chapter SO-
Subdivisions
Amendment prepared for the City of Milton Mayor and City Counc il meeting on February 21, 2024 (Fi rst Pre sentat ion on
Feb r uary 5, 2024 )
Pa ge 5 of 10
EXHIBIT "A"
-THE CODE OF THE
Append ix A FEES AND OTHER CHARGES
~ Penalties of No less than $1 ,000.00 and not to exceed
Sec . 12.9. violation $2,500.00
~ Plat application $25 .00 administrative fee+ $350.00 review
Sec . 12.6 . 7.A. fee+ $5 .00/lot
34 ;i,u !ell4l Recording of $25.00 administrative fee per subdivision+
Sec . 12.6. 7.A . p lat and recording fees as established by the Fu lton
declaration of County Clerk of Superior Court
covenants,
conditions, and
restrictions at
Fulton County
Clerk of
Superior Court
~ Fees for See sections 48-466, 20 -591 and 22 -50
Sec . 12.6 . 7.A. required
inspection,
water and
sewer
connection,
curb cut, and
street sign
~ Bond fee $250.00 legal processing and $50.00
Sec . 12.6. 7 .c. administrative fee
Ch apter 54-
Telecommu nications
~ App lication fee $2,000.00 plus the actua I consulting cost
Sec . 8 .4 .5 .C.4 . up to $7,500.00
~ Te lecommunic $1,000.00 per tower and $1,000.00 per
Sec. 8.4.5.F.3. ations antenna array
operating
license
~ Lease $250.00 legal processing and $50.00
Sec . 8.4.5 .1.9. application fee administrative fee
~ Lease As negotiated by the city manager or
Sec . 8.4.S.Q. co m pensation designee and approved by city council
~ Late lease 2% of the annual rental fee for each day or
Sec. 8.4.5.Q. payments portion thereof beyond the due date
Chapter 60-Vegetation
~ Pena lties for Not [to] exceed $1,000.00 per vio lation per
Sec. 11.1.1.P.l. violation day
Amendme nt prepared for the City of Milton Mayor and City Council meeting on Feb rua ry 21 , 2024 (Fi rst Presentation on
February 5, 20241
Page 6 of 10
~
~
60-48
Sec. 11 .1.2.N.4.
Sec . 11 .1.2.D .5 .
Sec . 11 .1.3.C.7.
Sec. 11.1.3.H.16.
EXHIBIT "A"
-THE CODE OF THE
Append ix A FEES AND OTHER CHARGES
TFee jlreteetieA ,0.11 tree flFeteetieA
~ feAees FftljSt ee
aeeemflaAiea 13~• "Stav
Qijt " aAa "Tree Saye "
sigAage , wl:lieR ma~ ee
flijFERasea fFBA't
E8A'IA'tijAity
aeYel8flA'tCAt feF a fee
Penalty for If specimen trees are
violation of removed or have their
specimen trees root protection zones
disturbed without
permission
lns12ection
after non -
comgliance
Tree removal
12ermit
a1212lication
{includes 12re -
a1212roval site
visit and gost -
a1212roval
com12liance
insgectionl
Tree Cano12y
Plan Review
and Ag12roval
A1212lication
{includes 12re -
ag12roval site
visit tree
E!rotection
insgection,
certificate of
occu12ancy
insgection, and
1 and 3 year
follow -u12
ins12ections
Tree Canogy
Value for
Estimating Tree
Fund Pal!ments
$5 .00 jleF SigA
The unit value of the specimen tree is
doubled and that becomes the unit value
that must be compensated for
$50 12er ins12ection
$25 12er tree or 12er 1,600 sg .ft . of tree
cano12y cover or 12ortion thereof with a
ma ximum f ee of $150.
$300 for the first acre, S50 for each
additional acres; $500 for 5 acres and
greater
$31.25 ger 100 sg .ft .
Amendment prepared for the City of Milton Mayor and City Counci l meeting on February 21 , 2024 (First Presentation on
February 5, 2024)
Page 7 of 10
Chapter 64-Zoning
6~ 369!2)e
~
e4--WP
~
~
Se c. 12.8.1.A.1.
e4-1-&9G
~
Sec. 12.4 .2.A.c.i.
~
Sec . 12.4.3 .F.
EXHIBIT "A"
-THE CODE OF THE
Append ix A FEES AND OTHER CHARGES
IRElljsieRaf'J'
R81jSiRg !iR lielj
~
AlimiRisiFaiiaR
ef iRElljsieRafV
~
Approval of Certificate of
alterations or endorsement for
new commercial and
construction by multifamily
the ORB
Media Based on permit type
production requested and minimum
permit fee processing time
Application fee Resident ial d istr icts : R-1,
for a R-2, R-2A, R-3, R-3A , R-
concurrent 4, R-4A, R-5, R-SA , NUP,
variance CUP , MHP
AG -1, R-6, TR, A, A-1, 0 -
I, C-1, C-2, M -lA, M -1,
M-2, MIX and
nonresidential uses in
residential districts
listed above
All signs
Appeal
application
Single-family res idential
zoning districts and AG -
1 district for residential
uses only
Multifamily districts,
nonresidential d istricts,
and commercial uses in
residential or AG -1
districts
~
~
$350.00 for each project review
Low impact permit fee-$100.00, high
i mpact permit fee-$250.00, additional
$100.00 per day for any permit rece ived
less than the minimum number of
processing days required in subsections e4-
1616!5)a . 8.10 .1.E . and 6~ 1616!6)a .
8.10 .1 .F.
$250 .00 plus $SO .OD for each additional
concurrent variance requested on the same
piece of property
$350.00 plus $100 .00 for each additional
concurrent variance requested on the same
piece of property
$350.00 plus $100 .00 for each additional
request
$250.00 plus $SO .OD for each additional
variance request on the same piece of
property
$350.00 plus $100.00 for each additional
variance request
Amendment prepared for the City of Milton Mayor and City Council meeti ng on Fe bruary 21 , 2024 (First Pre sentation on
February 5, 2024)
Page 8 of 10
EXHIBIT "A"
-THE CODE OF THE
Appendix A FEES AND OTHER CHARGES
All signs $350.00 plus $100 .00 for each additional
variance request
64-2175 Rezoning
petition
To Acreage
AG -1, R-1, R-2, R-2A, R-0 to 5 $500.00
3, R-3A, R-4, R-4A , R-5,
R-5A
~BF eMeise ta u 5+ to 10 $1,000.00
10+ to 20 $1,500.00
20+ to 100 $2,000.00
100+ $2,500.00 plus an
additional $40 .00 per
acre for any portion
thereof over 100
acres . Maximum fee =
$10,000
R-6, TR , A, A-1, 0-1, C-1, Oto 5 $750.00
C-2, M -lA, M -1, M-2, H
5+ to 10 $1 ,500.00
10+ to 20 $2 ,000.00
20+ to 100 $2,500.00
100+ $3 ,000 plus an
additional $50 .00 per
acre for any portion
thereof over 100
acers.
CUP, NUP, MHP Any acreage $2 ,000.00 plus $50 .00
per acre or any
portion thereof.
Maximum fee =
$10,000 .00
MIX Any acreage $1 ,000.00 plus $50.00
per acre or any
portion the reof.
Maximum fee =
$10,000.00
64 222l!bl Penalties for Where a determination $1,000.00 ---j Formatted Table
Sec . 12.9.2.B. violation is made that property is
in violation of zoning
ordinance, and any
other codes and laws
enforced by the
community
development
Amendment prepared for the City of Milton Mayor and City Council meeting on February 21 , 2024 (First Presentation on
February 5, 2024)
Page 9 of 10
j
EXHIBIT "A"
-THE CODE OF THE
Appendix A FEES AND OTHER CHARGES
department, and all
reasonable efforts and
means to obta in
compliance have been
exhausted
li4 :!:!91i!f) Penalties for Not exceed $1 ,000 .00 per day
Sec . 9.3 .7.A.S. violation of
signs
~ Application to $350.00 per review
Sec . 12.7.4.A. HPC for
certificate of
appropriatenes
s
Amendment prepa re d for the City of Milton Mayor and City Council meeting on February 21 , 2024 (Fi rst Presentation on
February 5, 2024)
Page 10 of 10