HomeMy WebLinkAboutAgenda - DRB - 03/04/2025 DESIGN REVIEW BOARD
City Council Chambers, City Hall
Tuesday, March 4, 2025 at 6:00 PM
AGENDA
1. CALL TO ORDER / PLEDGE OF ALLEGIANCE
2. INTRODUCTION OF BOARD MEMBERS AND CITY STAFF
3. ELECTION OF CHAIR & VICE CHAIR
A. Elect a Chair for the Design Review Board
B. Elect a Vice Chair for the Design Review Board
4. APPROVAL / AMENDMENT OF AGENDA
5. APPROVAL OF MEETING MINUTES
A. February 4, 2025 - Action Report
6. DEMOLITION OF STRUCTURES
A. 13805 Hopewell Road
Applicant: Scott D. Reece/Brumbelow-Reese & Associates, Inc.
Requests:
• To demolish existing house, carport, well building, and concrete driveway.
B. 13595 Hopewell Road
Applicant: Steve Powell/Steve Powell Homes, Inc.
Requests:
• To demolish existing house and pool
C. 2095 Mountain Road
Applicant: Nathaniel Folsom
Requests:
• To demolish a 3-sided pole barn.
7. COURTESY REVIEWS
A. U25-01, 12900 Arnold Mill Road
Applicant: Ebenezer Methodist of Milton
Request:
DESIGN REVIEW BOARD - Tuesday, March 4, 2025 PAGE | 2
2006 Heritage Walk, Milton, GA 30004 ǀ 678.242.2500 ǀ www.miltonga.gov
• To request a Use Permit for a Rural Event Facility (Sec. 8.7.1.H of the UDC)
for a maximum of 300 attendees within the existing 23,000 square foot activity
center on a 6.61 acre property
B. V25-03, 15060 Freemanville Road
Applicant: Daniel Harper
Request:
• Sec. 3.1.4, Accessory Structure Setbacks - Unified Development Code. To
allow a proposed detached garage accessory structure to be located in
front of the existing single-family home.
C. V25-06. 100 Deerhaven Lane
Applicant: Martin Anker
Request:
• Sec. 3.1.4, Accessory Structure Setbacks - Unified Development Code. To
allow a proposed cabana accessory structure to be located in front of
single-family home.
• Sec. 8.4.2.E.2.a – Unified Development Code. To allow a proposed
private recreational pickleball court to be located in front of single-family
home.
• Sec. 8.4.2.E.2.a – Unified Development Code. To allow a proposed private
recreational pickleball court to be located in front of single-family home.
D. V25- 07, 575 Glen National Drive
Applicant: Mishka Parker
Request:
• Sec. 11.5.7.A.1 - Unified Development Code. To allow an existing home
and proposed home addition to encroach the 50-foot undisturbed stream
buffer.
• Sec. 11.5.7.A.2 - Unified Development Code. To allow an existing home
and proposed home addition and covered patio to encroach the 75-foot
impervious setback.
E. Northside Medical Office Building (Building/Architecture Review)
Applicant: Caitlin Matonak
Requests:
• Review of building design for a medical office building.
DESIGN REVIEW BOARD - Tuesday, March 4, 2025 PAGE | 3
2006 Heritage Walk, Milton, GA 30004 ǀ 678.242.2500 ǀ www.miltonga.gov
8. FINAL REVIEWS
A. Chadwick Village Phase II (Site/Landscape Review)
Applicant: Madison Rieke
Request:
• Review of site and landscape plan for three commercial buildings in the
Phase II site.
B. Fifth Third Bank (Building Review – Mural Design)
Applicant: David Mikel
Request:
• Review of a wayfinding mural design applied to the surface of a wall.
9. NEW BUSINESS
A. None
10. OLD BUSINESS
A. None
11. ADJOURNMENT
Persons needing special accommodations in order to participate in any City meeting should
call 678.242.2500.