Loading...
HomeMy WebLinkAboutORDINANCE NO. 07-11-59STATE OF GEORGIA ow, COI.1NTY OF FULTON ORDINANCE NO. 07-11-59 PETITION NO. U07-005 AN ORDINANCE TO ALLOW FOR A USE PERMIT FOR A CHURCH, PROPERTY LOCATED AT 13660 NEW PROVIDENCE ROAD (22 -3540-0875-028-8,22 -3530-0854-005-3,22 -3470-0855-016-1) BE IT ORDAINED by the City Council for the City of Milton, Georgia while in regular session on November 15, 2007 at 7:00 p.m. as follows: SECTION 1. That the Zoning Ordinance of the City of Milton be amended, and the official maps established in connection therewith be changed so that the following property located at 13660 New Providence Road consisting of a total of approximately 85.07 acres, be allowed a use permit under the AG -1 (Agricultural) District with conditions, attached hereto and made a part herein; ALL THAT TRACT or parcel of land lying and being Land Lots 803, 854-856, 874-876 of the 2nd District 2nd Section, Fulton County, Georgia by the attached legal description; and SECTION 2. That the use permit as listed in the attached conditions of approval, be approved under the provisions of Section 19.2.3 of the Zoning Ordinance of the City of Milton; and Now SECTION 3. That the property shall be developed in compliance wit the conditions of approval 1, as allached to this ordinance. Any conditions hereby approved (including any site plan) do not authorize inn the violation of any district regulations; and SECTION 4. That the official maps referred to, on file in the Office of the City Clerk, be changed to conform with the terms of this ordinance; and SECTION 5. That all ordinances or part of ordinances in conflict with the terms of this ordinance are Hereby repealed; and SECTION 6. This Ordinance shall become effective upon adoption by the Mayor and City Coiincil and the signature of approval of the Mayor. ORDAINED this 15'h day of November, 2007. Attest: e R. Marchaifava, City Clerk L.W (Seal) Approved: Joe Lockwood, Ma CONDITIONS OF APPROVAL U07-005 13660 New Providence Road The Mayor and City Council approved a USE PERMIT for a church (Article 19.4.10.) CONDITIONAL subject to the owner's agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Mayor and City Council. 1) To the owner's agreement to restrict the use of the subject property as follows: a) Church and accessory uses for a total of 70,185 square feet. b) Restrict the number of church members to 375 2) To the owner's agreement to abide by the following: a) To the revised site plan received by the Milton Community Development Department on September 5, 2007. Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Ordinance and these conditions prior to the approval of a Land Disturbance Permit. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy. 3) To the owners agreement to the following site development considerations: a) No more than 1 exit/entrance on New Providence Road. Curb cut location and alignment are subject to the approval of the City of Milton Traffic Engineer. 4. To the owners agreement to abide by the following requirements, dedication and improvements: a) Dedicate at no cost to the City of Milton along the entire property frontage, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to the City of Milton such additional right- of-way as may be required to provide at least 10.5 feet of right-of- way from the back of curb of all abutting road improvements, as well as allow the necessary construction easements while the rights- of-way are being improved: 30 feet from the centerline of New Providence Road. b) Improve New Providence Road along the entire property frontage with curb and gutter per the City of Milton Standards or as may be approved by the City of Milton Traffic Engineer. c) Provide a deceleration lane for each project entrance or as may be required by the City of Milton Traffic Engineer. d) Provide a left turn lane for each project entrance or as may be required by the City of Milton Traffic Engineer. e) Provide traffic control at the project entrance on New Providence Road at the time when 50 cars depart at one time from the property. 5. To the owners agreement to abide by the following: a) Prior to submitting the application for a LDP with the Department Community Development, arrange to meet with the City of Milton Traffic Engineer. A signed copy of the results of these meetings will be required to be submitted along with the application for a Land Disturbance Permit. b. Prior to submitting the application for an LDP, arrange an on-site evaluation of existing specimen trees/stands, buffers, and tree protection zones within the property boundaries with the City of Milton Arborist. A signed copy of the results of these meetings will required to be submitted along with the application for an LDP. C. To maintain as a minimum, the tree density requirements as prescribed by the City of Milton Tree Preservation Ordinance Administrative Guidelines, either through the retention of existing trees, or tree replacement, in perpetuity. d. At the time of submittal for a Land Disturbance Permit and after the approval of the Preliminary Plat, the engineer/developer is required to provide written documentation verifying on-site evaluation and any other necessary downstream constraints. e. Provide documentation (cross-section, profile, etc.) as to the existing conditions for all natural streams/creeks within the boundary of the project. Show, by documentation, the appropriate erosion protection of the Stormwater conveyance system. f. The developer/engineer is responsible to demonstrate to the City by engineering analysis, that the developed land use (proposed development). Stormwater runoff conditions are controlled at the maximum pre -developed land use level, so that downstream properties/conveyance systems are not impacted or aggravates existing flooding/drainage nor creates new drainage/flooding problems off-site. g. Upon receiving zoning, rezoning or a special use approval from the City and prior to submitting for a LDP, the developer/engineer shall contact and submit to the Stormwater Engineer a Stormwater concept plan. The Stormwater concept plan shall be a preliminary drawing describing the proposed location of storage facilities, discharge path of storage facilities, downstream and upstream constraints and other matters with potential Stormwater implementations. The Stormwater concept plan shall be submitted to the City when the design engineer determines the preliminary location, type of Stormwater facilities or at approximately 35% completion. w v A IN 41 44 ... . . . ....... ... ... . ..... . . ..... .. iz Z., ANNER � 011 .4 ... . . . ....... ... ... . ..... . . ..... .. iz Z., ANNER � 011 ROVI'MiNCE ROAD CAMPUS ......... .. S AND ENCINEERS Im . � ,, cRrXxve rxr..e X � A w jam!' �. yha ar 6w ,Nt S M n � „n p � ¢ w x Y � '.GN b✓se rp � a s,3>�ai'g X NaCrpvpsa � �^y ,� �m i6 N 1 iLa f ',La li. �M8 � a9 i� s.,eX cewpw, PI �2p6 A[ZFA $_„_,Yyt?7 MlYI:VYy LWVL'c-x4 ro Lra..:wr.T w@�jp0• y � � fri JL bYL ,�io.,z. x#��..� 4�rPiYiYbalCX R a EbuYrw a :Pw< r Yq+.AJWa t+NtiLW rx}ya K��l'.,.lA@3J nJ�ckNaw4Yp/iS Q � rql RAY "LLW ...�... wo.. wcq r•wX � ri Rla1[n rlw Mi w.,w.t.+br qw Y„ LWrT.ynyRA J..6rv..ty i+'e.r..nso rl +YVPraw reVLt SpTK4 �„� p - bYb ��Y �-wMrW{.Y�},.- r44T wM tfiYGwwTMh bNt arXVr[R w..ax w a�Ad.)M wL: rt +ewrrwbs..upL„ :,..s Nnr+J.J6gO0Ai l.ior` Rep YUWW Nr6p +rFlR w.b6,t}4bARyy[X.. - 'QL . FlEptfL iaHi E -a nwYrL i+i+„KMfi LLL. •.:;u a wRrR. a++marwa= +u.•.a+n p.L,a:Mp:riLa. JIM IWAOXER 8AllOG1A7[S. • x�,w.r LXLV n� pan r w d14 g11rNr ba L!y b:WM w b�A fM wt :�. w bfYL;N w Li`W{ ?M LsrA tNYNWLpib NYMLr MIIrYLf ' �,+�_1 ` r..aaanr-V.Yxy rL µdr. � .. Lff aua <LpILY RM.rM.wiixvM L ba�i�wMLLA awt MrnL.AMlfn4bL.. 1. 11 � i Im