Loading...
HomeMy WebLinkAboutPacket-12-13-2007 CITY OF MILTON, GEORGIA Joe Lockwood, Mayor CITY COUNCIL Karen Thurman Julie Zahner Bailey Bill Lusk Neal O’Brien Tina D’Aversa Rick Mohrig Thursday, December 13, 2007 Regular Council Meeting Agenda 7:00 PM INVOCATION -Reverend Bill Burke, Morning Star Chapel 1) CALL TO ORDER 2) ROLL CALL 3) PLEDGE OF ALLEGIANCE (Led by the Mayor) (Agenda Item No. 07-446) 4) APPROVAL OF MEETING AGENDA (add or remove items from agenda) 5) PUBLIC COMMENT 6) REPORTS AND PRESENTATIONS 1) A proclamation declaring Friday, December 14, 2007, as Milton High School Girl’s Lacrosse Day in Milton. (Presented by Councilmember Karen Thurman) 7) CONSENT AGENDA (Agenda Item No. 07-447) 1. Approval of the Financial Statements for the period ending November, 2007. 8) ZONING AGENDA (Agenda Item No. 07-418) 1. ZM07-006 - 2865 Webb Road -To modify Condition 3.a. of Z06-051 to reduce the required 25-foot buffer and 10-foot improvement setback to a 5-foot landscape strip Page 1 of 3 Milton City Hall City Council Chambers 13000 Deerfield Parkway, Building 100 Milton, GA 30004 Persons needing special accommodations in order to participate in any City meeting should call 678-242-2500. MILTON CITY COUNCIL REGULAR MEETING AGENDA DECEMBER 13, 2007 - 7:00 PM along the east and west property line for a distance of 150 feet north of the existing building. (This item was deferred on November 15, 2007.) (Presented by Tom Wilson, Community Development Director) (Agenda Item No. 07-437) 2. RZ07-011 To rezone from C-1 (Community Business) and O-I (Office-Institutional) to O-I (Office- Institutional) to develop a 140,000 square foot office building with a maximum height of 4 stories. (Presented by Tom Wilson, Community Development Director) (Agenda Item No. 07-438) 3. RZ07-018/U07-009/ VC07-010 To rezone from C-1 (Community Business) and O-I (Office-Institutional) to C-1 (Community Business) to develop a 5,700 square foot retail commercial building and a Use Permit (Article 19.4.41(1)) for a 3 story (less than 60 feet) 110,000 square foot climate controlled self storage facility and a 2-part concurrent variance to 1) To locate the refuse area adjacent to the street (Article 12G.4.B.4) and 2) To allow parking islands every 11TH space instead of every 5TH space (Article 4.23.2). (Presented by Tom Wilson, Community Development Director) (Agenda Item No. 07-439) 4. RZ07-019/ U07-010/ VC07-011 To rezone from C-1 (Community Business) to O-I (Office-Institutional) to develop 23,000 square feet of office. The applicant is also requesting a Use Permit to exceed the district height, Article 19.4.21, to allow the building to be constructed at a maximum height of 70 feet that includes an underground garage and 3 stories of office. To request a 3-part concurrent variance to 1) To reduce the side setback from 20 feet to 15 feet along the north property line (Article 8.1.3.C.); 2) To reduce the 25-foot non-impervious buffer, to allow approximately 6,010 sq.ft. of encroachment to allow parking on pervious pavement (City Code Chapter 14, Section 6.5.(i); 3)To reduce the 50-foot undisturbed stream buffer to allow approximately 675 sq.ft. of encroachment to allow parking on pervious pavement (City Code Chapter 14, Section 6.5 (ii)). (Presented by Tom Wilson, Community Development Director) (Agenda Item No. 07-440) 5. U07-006/ VC07-013 To request a Use Permit (Article 19.4.27) For a 1,890 sq. ft. existing building for a landscape business and a 3-Part Concurrent Variance to 1) Reduce the 50-foot setback to 40 feet along the east property line (Article 5.1.3.D.); 2) Reduce the 50-foot buffer and 10-foot improvement setback to a 10-foot landscape strip planted to buffer standards along the east property line (Article 12.H.C.1); and 3) Reduce the 50-foot buffer and 10- foot improvement setback to a 15 foot landscape strip planted to buffer standards along the south property line (Article 12.H.C.1). (Presented by Tom Wilson, Community Development Director) Page 2 of 3 Milton City Hall City Council Chambers 13000 Deerfield Parkway, Building 100 Milton, GA 30004 Persons needing special accommodations in order to participate in any City meeting should call 678-242-2500. MILTON CITY COUNCIL REGULAR MEETING AGENDA DECEMBER 13, 2007 - 7:00 PM (Agenda Item No. 07-442) 6. ZM07-007 To modify Condition 3.a. (03Z-159) to reduce the perimeter building setback along the north property line for Lot 33, Phase 4 – Unit 1 of Triple Crown Subdivision from 50 feet to 36 feet. (Presented by Tom Wilson, Community Development Director) 9) FIRST PRESENTATION 10) UNFINISHED BUSINESS 11) NEW BUSINESS (Agenda Item No. 07-448) 1. Consideration and approval of the January 2008 Meeting and Work Session Schedule (January 10, 2008 - Regular Meeting, January 17, 2008 -Work Session, and January 24, 2008 – Regular Meeting). (Presented Chris Lagerbloom, Interim City Manager) (Agenda Item No. 07-449) 2. Approval of a Resolution of the Mayor and Council of the City of Milton, Georgia authorizing solicitation of Tax Anticipation Note Financing. (Presented by Stacey Inglis, Finance Manager) (Agenda Item No. 07-450) 3. Approval of Legal Fees for November 2007. (Presented by Stacey Inglis, Finance Manager) 12) MAYOR AND COUNCIL REPORTS 13) STAFF REPORTS 14) EXECUTIVE SESSION (if needed) (Agenda Item No. 07-451) 15) ADJOURNMENT Page 3 of 3 Milton City Hall City Council Chambers 13000 Deerfield Parkway, Building 100 Milton, GA 30004 Persons needing special accommodations in order to participate in any City meeting should call 678-242-2500. _______________________ Proclamation “Milton High School Girl’s Lacrosse Day” Whereas, lacrosse is a sport that requires skillful hand-eye coordination, mental awareness and physical endurance; and Whereas, the Girl’s Lacrosse program began in 1999 as a club program at Milton High School and has grown rapidly since that time; and Whereas, in 2002, the Georgia High School Association officially sanctioned lacrosse as a high school sport and in 2005 recognized lacrosse as a full fledged championship sport; and Whereas, the Milton High School Girl’s Lacrosse team has a tradition of excellence and accomplishment in academic and athletic competition, reflecting the highest ideals of hard work, training, and sportsmanship; and Whereas, the Girl’s Lacrosse Team has had twenty members selected for All-State Honors, four selected as First Team All Americans, three selected as Honorable Mention All Americans and fifteen selected as Academic All Americans; and Whereas, the team has reached the Georgia High School Association playoffs every year since 2002 and was the first public school team to win the Girl’s Lacrosse State Championship; and Whereas, the Milton High School Girl’s Lacrosse team has won the Georgia High School Girl’s Lacrosse State Championship an unprecedented three years in a row in 2005, 2006 and 2007; and Whereas, the players on the Milton High School Girl’s Lacrosse team are champions not only on the field but also in the classroom, in the community and in life and we are proud that this great team is located in Milton, Georgia. Now, therefore, we, the Mayor and City Council of the City of Milton, hereby dedicate and proclaim the fourteenth day of December, 2007 as “Milton High School Girl’s Lacrosse Day” in the city of Milton, Georgia. Given under our hand and the Seal of the City of Milton, Georgia on this 13th day of December, 2007 Joe Lockwood Mayor (Seal) /U City of Milton 13000 Deerfield Parkway, Suite 107, M~lton,Georgia 30004 ClN COUNCIL AGENDA ITEM TO: City Council DATE: December 5,2007 FROM: Interim City Manager AGENDA ITEM: ZMQ7-006-2865 Webb Road -To modify Condition 3.a. of 206-051 to reduce the required 25-foot buffer and 10-foot improvement setback to a 5-foot landscape strip along the east and west property line for a distance of 150 feet north of the existing building. MEETING DATE: Thursday, December 13,2007 Regular Meeting BACKGROUND INFORMATION: (Attach addit/onal pages if necessaty) See attached memorandum APPROVAL BY CITY MANAGER: APPROVED () NOT APPROVED /\ CITY ATTORNEY APPROVAL REQUIRED: () YES )(NO CITY ATTORNEY REVIEW REQUIRED: () YES $,A0 APPROVAL BY CITYATSOREY I)APPROVED () NOTAPPROVED PLACED ON AGENDA FOR: 12 13 r~0Q-l REMARKS: PETITION NUMBER(S): ZM07-006 PROPERTY INFORMATION ADDRESS 2865 Webb Road DISTRICT, LAND LOT 2/2, 1048 OVERLAY DISTRICT State Route 9 EXISTING ZONING O-I (Office-Institutional) Z06-051/VC06-070 EXISTING USE IQ Academy PETITIONER Pegah Firoozi ADDRESS 5240 Orchard Court, Cumming GA 30004 PHONE 678-762-0216 APPLICANT’S REQUEST: To modify condition 3.a. to reduce the 25-foot undisturbed buffer and 10-foot improvement setback on the east and west side of the property to a 5-foot landscape along the east and west property lines in the area of the existing driveway, structure and parking area and 150 feet beyond the existing building. COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION APPROVAL CONDITIONAL MILTON MAYOR & CITY COUNCIL NOVEMBER 15, 2007 - DEFER FOR 30 DAYS TO DECEMBER 13, 2007 Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 1 of 10 ZM07-006 Revised Condition to be Modified: Z06-051/VC07-070 3. To the owners agreement to the following site development considerations: a. Reduce the required 25-foot buffer and 10-foot improvement setback to a 5-foot landscape strip along the east and west property lines only in the area of the existing driveway, structure and parking areas. (VC07-070) Analysis and Recommendation: The subject site is developed with a child care/Montessori school within an existing single family residence. It was rezoned from AG-1 to O-I pursuant to Z06- 051/VC07-070 for a maximum density of 1,470.59 square feet of gross floor area per acre zoned or a total area of 2,000 square feet. The applicant requested a concurrent variance to reduce the required 25-foot buffer and 10-foot improvement setback to a 5 foot landscape strip for 150 feet along the east and west property lines. The Fulton County Board of Commissioners approved a 5 foot landscape strip in lieu of the 25 foot buffer and 10 foot improvement setback along the east and west property lines, only in the area of the existing driveway, structure and parking areas. The applicant had asked during the public hearing to extend it another 150 feet as currently requested. It was approved per Staff conditions which did not include the 150 feet beyond the building. The applicant had thought it was approved the way she had requested it. The applicant obtained a fence permit for the chain link fence from Fulton County prior to the incorporation of the city. The permit was incorrectly approved to be located five feet interior to the property lines. Because of the long and narrow shape of the lot, approximately 117 feet wide, the required 70 feet (25-foot buffer and 10-foot improvement setback on both the east and west property lines) leaves approximately 47 feet for the play areas. The applicant has stated in her Letter of Intent that because of the narrow width of the property it is a hardship that is not self imposed. Since the November 15, 2007 City Council meeting, a site plan depicting the existing septic drainage field has been included in the Staff analysis. Based on this plan, it appears that there is little room to provide a play yard except where the undisturbed buffer is required per the ordinance. Staff notes that the majority of parcels surrounding the site have been rezoned from AG-1 (Agricultural) to office or commercial uses. The Focus Fulton 2025 Plan Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 2 of 10 ZM07-006 Revised recommends this area to be Office Institutional along the south side of Webb Road. The Plan also recommends the area adjacent to the south be developed Commercial. It appears that this area will continue to redevelop from single family residences to non-residential uses in the near future. The applicant states that she has a letter of support from the property owner adjacent to the site that is currently zoned AG-1 (Agricultural) and has the support of the other adjacent AG-1 (Agricultural) zoned property owner and is obtaining a letter from him. Staff is of the opinion that the issue of narrowness of the parcel and the area needed for the septic drainage field demonstrates a hardship that is not self- imposed. Play equipment is not allowed on the drainage field area. Therefore, Staff recommends APPROVAL CONDITIONAL of the requested modification to condition 3.a. CONCLUSION: Should the Mayor and City of Council approve this petition, the Recommended Conditions (Z96-0051) should be revised to read as follows: 3. To the owners agreement to the following site development considerations: a. Reduce the required 25-foot buffer and 10-foot improvement setback to a 5-foot landscape strip along the east and west property lines in the area of the existing driveway, structure and parking area and 150 feet beyond the existing building. The size, type and location of plantings in the 5 foot landscape strip are to be approved by the City Arborist. (ZM07-006) Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 3 of 10 ZM07-006 Revised ZM07-006 LOCATION MAP 12/6/2007 ZM07-006 Revised Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 Page 4 of 10 SEPTIC FIELD DRAINAGE PLAN Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 5 of 10 ZM07-006 Revised Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 6 of 10 ZM07-006 Revised Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 7 of 10 ZM07-006 Revised CURRENT PLAY YARD AREA CURRENT PLAY YARD Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 8 of 10 ZM07-006 Revised EAST PROPERTY LINE Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 9 of 10 ZM07-006 Revised WEST PROPERTY LINE Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 12/6/2007 Page 10 of 10 ZM07-006 Revised -c City of Milton 13000 Deerfield Parkway, Suite 107, Milton, Georgia 30004 ClTY COUNCIL AGENDA ITEM TO: City Council DATE: December 5,2007 FROM: Interim City Manager AGENDA ITEM: RZ07-011 -To rezone from C-l (Community Business) and 0-1 (Office-InstitutionaI) to 0-1 (Office-Institutional) to develop a 140,000 square foot office building with a maximum height of 4 stories. MEETING DATE: Thursday, December 13, 2007 Regular Meeting BACKGROUND INFORMATION: (Attach addif;ona\ pages if necessary) See attached memorandum APPROVAL BY CITY MANAGER: APPROVED (J NOT APPROVED CITYATTORNEY APPROVAL REQUIRED: (1 YES WNO CITY ArrORNEY REVIEW REQUIRED: (]YES @NO APPROVAL BY CITY ATTORNEY I)APPROVED () NOT APPROVED PCACED ON AGENDA FOR: 12 13 ZaaT REMARKS: PETITION NUMBER(S): RZ07-011 PROJECT NAME Webb Road Office Building PROPERTY INFORMATION ADDRESS Webb Road DISTRICT, LAND LOT 2/2 1048 OVERLAY DISTRICT State Route 9 Overlay EXISTING ZONING O-I (Office & Institutional) Z94-116 & C-1 (Community Business) Z97-076 PROPOSED ZONING O-I (Office & Institutional) ACRES 9.286 EXISTING USE Undeveloped PROPOSED USE 4 story office building – 140,000 square feet OWNER Windward Way LLC, Southeastern Partners Realty LLC, MCMT LLC. ADDRESS 5665 Highway 9, Suite 103-329, Alpharetta, GA 30004 PETITIONER/REPRESENTATIVE John McMillan PHONE 770-751-9171 INTENT To rezone from C-1 (Community Business) and O-I (Office & Institutional) to O-I (Office & Institutional) to develop a 140,000 square foot, 4 story office building at a density of 15,076.46 square feet per acre. Seventy-five (75) percent will be general office and twenty-five (25) percent will be medical office. COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION APPROVAL CONDITIONAL Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 1 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 CITY OF MILTON PLANNING COMMISSION APPROVAL CONDITIONAL (Requested applicant to go before the DRB prior to the MCC) 4-3 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 2 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 LOCATION MAP 12/6/2007 RZ07-011 R/P Z97-076 R/A Z94-116 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 Page 3 of 26 CURRENT ZONING MAP 12/6/2007 RZ07-011 R/P Z97-076 R/A Z94-116 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 Page 4 of 26 SITE PLAN – Revised Site Plan, October 22, 2007 12/6/2007 RZ07-011 R/P Z97-076 R/A Z94-116 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 Page 5 of 26 SUBJECT SITE (From Webb Road looking South) Looking north from site toward The Preserve at Windward Village Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 6 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 SUBJECT SITE: The subject site is located south of Webb Road and north of SR 9 (Cumming Hwy). It is currently zoned O-I (Office & Institutional) pursuant to Z94-116 and C-1 (Community Business) pursuant to Z97-76 on the eastern portion of the site. The site is currently undeveloped except for the existing access via Devine Way (private drive) from SR 9. There are existing retail and office uses just to the south of the site. Within the site is a blue line stream which requires a 50 foot undisturbed buffer and an additional 25 foot pervious setback. Standards of Review (Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate and make a recommendation with respect to factors A. through G., below, as well as any other factors it may find relevant. A. Whether or not the proposal will permit a use that is suitable in view of the use and development of adjacent and nearby Property? The proposed office development is suitable based on the existing O-I (Office & Institutional) to the west pursuant to Z94-116 approved at 1,572 square feet per acre and a height of 2 stories and Z05-029 to the east approved at 12,844.32 square feet per acre and a height of 2 stories. B. Whether or not the proposal will adversely affect the existing use or usability of adjacent or nearby property? The proposed development will not adversely affect the existing uses nearby or adjacent uses if developed with the recommended conditions. C. Whether the property to be affected by the proposal has a reasonable economic use as currently zoned? The property may have a reasonable economic use as currently zoned. D. Whether the proposal will result in a use which will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities or schools? It is Staff’s opinion that the proposed use may cause an increased burden on the streets and transportation facilities and utilities but this should be mitigated with the Recommended Conditions. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 7 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 E. Whether the proposal is in conformity with the policies and intent of the land use plan? The proposed O-I (Office & Institutional) zoning is consistent with the policies and intent of the Focus Fulton 2025 Comprehensive Land Use Plan. A brief description of the project is noted below. Focus Fulton 2025 Land Use Plan Map: Office Proposed use/density: 4 Story Office Building / 15,076.46 square feet per acre The Focus Fulton 2025 Land Use Plan Map suggests Office for the surrounding properties to the east and west to the subject site and Retail Commercial to the south along SR 9. The Milton City Council adopted the Focus Fulton 2025 Comprehensive Plan as the City’s Comprehensive Plan on November 21, 2006. The proposed development is partially consistent with the following Plan Policies: • Encourage development consistent with the surrounding scale, transition of densities and uses, and Comprehensive Plan policies, where appropriate. • Building heights should be compatible with the surrounding area and/or be consistent with transitional policies and other land use policies. • Existing trees, particularly specimen trees and trees along road frontages should be preserved. • To the extent possible, open space should be incorporated into all developments. F. Whether there are other existing or changed conditions affecting the use and development of the property which gives supporting grounds for either approval or disapproval of the proposal? Existing zonings of office and commercial on the subject site and surrounding properties and adopted land use policies support this request for Office & Institutional to develop an office building; however, existing zoning conditions restrict the height to 2 stories. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 8 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 G. Whether the zoning proposal will permit a use which can be considered environmentally adverse to the natural resources, environment and citizens of the City of Milton? Staff notes that the proposed rezoning will have a minimal impact on the environment and natural resource, but the recommended conditions will help mitigate the impact. Existing uses and zoning of nearby property (See Map following table) Location Parcel / Zoning Petition Zoning / Name Approved Density/Min. Heated Floor Area North 14 00Z-151 MIX (Mixed Use) The Preserve at Windward Village Townhomes -2.10 units/acre Single Family Attached – 1.02 Single Family Detached - .46 North 15 03Z-081 MIX (Mixed Use) Undeveloped Office/commercial uses 2,228.14 sq.ft./acre for retail and/or office & 1,662.79 sq.ft./acre for office / 67,000 sq. ft. of retail and 50,000 sq.ft. of office Further Northeast 16 00Z-151 MIX (Mixed Use) The Park at Windward Village Townhomes -2.10 units/acre Single Family Attached – 1.02 Single Family Detached - .46 Further Northeast 1 03Z-185 C-1 (Community Business) Deerfield Place-Phase 1 9,552.93 sq.ft./acre 299,293 sq.ft. East 17 AG-1 (Agricultural) Single-Family Residential 1 unit/acre 1,500 sq.ft. East 18 06Z-051 O-I (Office & Institutional) I.Q. Academy 2,000 sq. ft within existing structure East 19 AG-1 (Agricultural) Single-Family Residential 1 unit/acre 1,500 sq.ft. Further east 20 05Z-029 O-I (Office & Institutional) Undeveloped 12,844.32 sq.ft./acre Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 9 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 Pending Z07-018 42,900 sq.ft. 2 stories Further east 20a 0Z-090 Pending Z07-018 C-1 (Community Business) Undeveloped 8,653.9 sq.ft./acre 18,000 sq.ft. 1 story Further east 3 86Z-219 C-1 (Community Business) Re-Max Realty Office 8,000 sq.ft./acre Further East 4 04Z-030 C-2 (Commercial) Katy’s Car Wash 3,935.97/sq.ft./acre 3,995 sq.ft. 2 stories East 5 85Z-213 C-1 (Community Business) Fulton Feed & Seed Not Specified East 6 06Z-026 C-1 (Community Business) Firestone Tire Store 6,387.67sq.ft/acre 7,250 sq.ft. East 7 Z97-075 O-I (Office & Institutional) Nationwide Insurance Office Office in existing structure Southeast 8 88Z-211/U88-47 C-1 (Community Business) First Academy Day Care 3,163 sq.ft./acre Southeast 9 Z93-019 C-1 (Community Business) Staton Heating & Air 8,724 sq.ft./acre South 11 Z97-76 C-1 (Community Business) Windward Shopping Center 14,048 sq.ft./acre 88,500 sq. ft. 2 stories Further South 2 73Z-001 C-1 (Community Business) Walmart Shopping Center and various businesses None Stated Further South 2a 06Z-049 C-1 (Commercial) Cactus Car Wash 5,405.41 sq.ft./acre 6,000 sq. ft. West 12 Kroger Shopping Center City of Alpharetta N/A West 13 06Z-073 06U-012 MIX (Mixed Use) and Use Permit Undeveloped 13,000 sq.ft./acre 82,860 sq.ft. 2 stories Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 10 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 EXISTING USES AND ZONING MAP 12/6/2007 RZ07-011 R/P Z97-076 R/A Z94-116 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 Page 11 of 26 SPECIMEN TREES ON SITE 12/6/2007 RZ07-011 R/P Z97-076 R/A Z94-116 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 Page 12 of 26 H. Suitability of the subject property under the existing zoning district for the proposed use? The existing zoning district will allow office and institutional uses but not at the density or configuration that the applicant is requesting. I. Suitability of the subject property under the proposed zoning district for the proposed use? The proposed zoning is suitable for the subject site if it is developed at a maximum height of 2 stories. This will ease the transition from the office to the residential to the north. In addition, the policy for the subject site is for a height of 2 stories, pursuant to Z97-076. J. The possible creation of an isolated zoning district unrelated to adjacent and nearby districts. The proposed request would not create an isolated zoning district. K. Possible effects of the change of the zoning or change in use on the character of a zoning district or overlay district? The effect of the proposed zoning, if developed with the recommended conditions, would be minimal to the zoning district or the SR 9 Overlay District. L. Whether the proposed zoning will be a deterrent to the value or improvement of development of adjacent property in accordance with existing regulations? If approved with the recommended conditions, the proposed zoning would be consistent with past policy on the site and be more in keeping with the nearby residential and non-residential development in the area. M. The possible impact on the environment, including but not limited to, drainage, soil erosion and sedimentation, flooding, air quality and water quality? The subject site contains a blue line stream that requires 50 feet of undisturbed buffer as well as a 25 foot impervious setback. This area will help minimize runoff, soil erosion, and flooding, while improving air quality and water quality. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 13 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 N. The relation that the proposed zoning bears on the purpose of the overall Land Use Plan with due consideration given to whether or not the proposed change will carry out the purposes of this Land Use Plan. The proposed rezoning as submitted is consistent with the overall Focus Fulton 2025 Comprehensive Land Use Plan for the area if approved with the recommended conditions. O. The consideration of the preservation of the integrity of residential neighborhoods shall be considered to carry great weight. In those instances in which property fronts on a major thoroughfare and also adjoins an established residential neighborhood, the factor of preservation of the residential area shall be considered to carry great weight. Staff is of the opinion that if approved at a maximum height of 2 stories, the proposed office will create a transition from commercial to the south to residential to the north. The required stream buffer will also create a natural buffer between the office and the residential uses. P. The amount of undeveloped or zoned land in the general area affected which has the same zoning or future land use classification as the proposed rezoning. There are currently several approved zonings and land use classifications in the general area of the subject site that are similar to the proposed rezoning. SITE PLAN ANALYSIS Based on the applicant’s site plan submitted to the Community Development Department on October 22, 2007, Staff offers the following considerations: BUILDING SETBACKS The following building setbacks are required for the proposed O-I (Office & Institutional) development: Front (Webb Road) – 40 feet Side (East Property line) – 20 feet Side (West Property line) – 20 feet Rear (South Property line) – 25 feet Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 14 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 The site plan indicates that the office building is located 10 feet from the east property line. It appears that if the building is reconfigured it could meet the minimum side building setback. BUILDING HEIGHT The applicant has proposed a four (4) story office building. The current zoning pursuant to Z97-076 was approved for a maximum of two (2) stories. Also, Board policy for the surrounding commercial and office zonings limits buildings to 2 stories in height. Therefore, Staff will condition the height of the building to 2 stories, not to exceed 30 feet from average grade. LANDSCAPE STRIPS AND BUFFERS Front (Webb Road) – 20 foot landscape strip Side (East property line) – 10-foot landscape strip planted to buffer standards pursuant to Z97-076, VC97-126) Side (West Property line) – 10-foot landscape strip Rear (South Property line) – 10-foot landscape strip It appears that the site plan meets or exceeds the required landscape strips. LOT COVERAGE It appears that the footprint of all buildings and parking will not exceed 70 percent of the total land area. PARKING REQUIREMENTS The following chart illustrates the parking required by Article 18 of the City of Milton Zoning Ordinance for the proposed uses: Proposed Use Minimum Requirement Spaces Provided • Office & Institutional • 3 spaces per 1,000 sq. ft. of 300 (100,000 sq.ft. of office) general office (300) (40,000 sq.ft. of medical 4 spaces per 1,000 sq.ft. of 160 Office) medical office (160) Total 460 spaces required 460 spaces provided Staff notes that the applicant is providing 460 parking spaces, which meets the required 460 parking spaces required per Article 18 of the City of Milton Zoning Ordinance. It also appears that the site plan is in compliance with the landscape and layout requirements of Article 12G.4. Section F. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 15 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 City of Milton Arborist Heavily wooded site with a stream running across the NW corner. Two (2) specimen trees were located: 28” Oak 43” Double Sweetgum tree. It appears that they are within the proposed parking lot. PUBLIC INVOLVEMENT On October 24, 2007 a Community Zoning Information Meeting was held at the Milton City Hall. There were approximately two members of the community in attendance that were interested in the subject site. Public Comment: Staff has received one e-mail from representatives of the Regency at Windward Square community, opposing the requested development because of increased traffic in the area. It is attached to this report. The applicant will be meeting with the representative prior to the Mayor & City Council Meeting. City of Milton Design Review Board Meeting – November 4, 2007 The applicant was not able to attend and therefore no comments were made regarding the project but will be attending the December 4, 2007 meeting for a courtesy review. Public Notice Requirements The rezoning petition was advertised in the Milton Herald on November 21, 2007 and the sign was installed before the required date of November 7, 2007 along the frontage of Webb Road. The notice of rezoning was sent to adjacent property owners on November 10, 2007. Public Participation Plan and Report The applicant has met the requirements of the Public Participation Plan. The applicant will be required to submit the public participation report seven days prior to the Mayor and City Council meeting. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 16 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 CONCLUSION The proposed development is consistent with Plan Policies and Board Policy for the development of O-I (Office & Institutional) to develop an office building. The petitioner’s request for four stories is inconsistent with Board policy on the site as well as for surrounding developments where the height of buildings is limited to 2 stories. Therefore, Staff recommends APPROVAL CONDITIONAL of RZ07-011 with a height limit of two stories. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 17 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 RECOMMENDED CONDITIONS If this petition is approved by the Mayor and City Council, it should be APPROVED O-I (Office & Institutional) CONDITIONAL subject to the owner’s agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Mayor and City Council. 1) To the owner’s agreement to restrict the use of the subject property as follows: a) Office and Institutional and accessory uses, at a maximum density of 15,076.46 gross floor area per acre zoned or a total gross floor area of 140,000 square feet, whichever is less. b) Limit the height of the building to no more than 2 stories or 30 feet from average grade. 2) To the owner’s agreement to abide by the following: a) To the revised site plan received by the Community Development Department on October 22, 2007. Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Ordinance, all other applicable city ordinances and these conditions prior to the approval of a Land Disturbance Permit. In the event the Recommended Conditions of Zoning cause the approved site plan to be substantially different, the applicant shall be required to complete the concept review procedure prior to application for a Land Disturbance Permit. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy. 3) To the owner’s agreement to the following site development considerations: a) Provide a 10-foot landscape strip planted to buffer standards along the east property line adjacent to AG-1 (Agricultural) (97VC-126). b) Provide at least one pedestrian entrance for each side of a building that directly abuts a public street. c) All building entrances shall be connected to the sidewalk network. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 18 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 d) Provide turning radius large enough for WB-50 vehicles to access all buildings on site. Use AutoTurn to show turning movements. 4) To the owner’s agreement to abide by the following requirements, dedication and improvements: a) Reserve the necessary Right of Way along the necessary property frontage of Webb Road and SR 9, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide for compliance with the Transportation Master Plan and the adjacent developments, according to the definitions in the Right of Way Ordinance. The sidewalk/trail shall be located at the back of the reserved Right of Way. b) Dedicate at no cost to the City of Milton prior to the approval of a Land Disturbance Permit or Certificate of Occupancy (whichever comes first), sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to the City of Milton such additional right-of-way as may be required by the Transportation Engineer for Milton and GDOT to: i. Provide at least 10.5 feet of right-of-way from the back of curb (or edge of pavement for rural areas) of all abutting road improvements, along the entire property frontage, as well as allow the necessary construction easements while the rights-of-way are being improved. ii. Overlay and striping for full width of Webb Road the length of property lines plus any additional taper lengths necessary or as approved by the Transportation Engineer for Milton. iii. Provide as a minimum 55 feet of right-of-way from centerline on Cumming Hwy (SR9). Provide 45 feet of right-of-way from centerline of Webb Road. iv. Provide adequate right-of-way dedication for addition of the following elements on Webb Road: a. EB Right turn lane into property b. WB Left turn lane into property v. The adequate right-of-way dedication for SR 9 shall be determined by the signal warrant analysis and intersection design as approved by the Georgia Department of Transportation. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 19 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 vi. Provide easements along Webb Road where required for sidewalks, as required by the Community Development Director. Provide six foot wide concrete sidewalk along the entire frontage of the property with a minimum 5 foot grass strip between the sidewalk and the back of curb and all new sidewalk installations along the rights-of-ways shall have a transverse double row of faux concrete brick pavers every 50 feet as approved by the Community Development Director. c. Provide motorized Inter parcel access to all adjoining properties as required by the Transportation Engineer for Milton. Provide additional non-motorized Inter parcel trails or sidewalks as may be required by the Transportation Engineer for Milton. d. Signal warrant analysis shall be preformed at the intersection of SR 9, Eastern Windward Way Commercial driveway, and eastern Wal- Mart driveway. The signal analysis shall be submitted and analyzed by GDOT. i. If a signal is warranted, a new decorative mast arm traffic signal at the intersection of SR 9, Eastern Windward Way driveway, and Eastern Wal-Mart driveway shall be installed and dedicated prior to a C.O. as approved by the Transportation Engineer for Milton and GDOT. The applicant is required to meet with and coordinate his improvements with the developers on all sides of his improvements. Signalized intersections shall not be designed as a split phase operation because of poor alignment or sight distance as approved by the Transportation Engineer for Milton and GDOT. ii. If a signal is warranted, access at existing western Windward Way Commercial driveway shall be a right in/right out and a section of median required on SR 9 and as approved by the Transportation Engineer for Milton and GDOT. e. Gates are not allowed. f. For office uses, a minimum of 1 car/vanpool or rideshare dedicated area for 50 spaces. For all uses, a minimum of 1 bicycle space for every 10 parking spaces. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 20 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 g. Driveway entrances shall meet the Community Service Policies and AASHTO guidelines, or roads be reconstructed to meet such criteria, at the approval of the Transportation Engineer for Milton and GDOT. Driveway entrances shall provide for the 95% queue with uninterrupted traffic flow onto the main line and/or a minimum throat length of one hundred feet at a maximum grade of six percent or as approved by the Transportation Engineer for Milton and GDOT. i. The driveway located off of Webb Road shall be allowed to be offset from utility drive on the opposite side of Webb Road as shown on October 10, 2007 site plan. The intersection angle and driveway design shall meet the City of Milton design standards to be approved by the Transportation Engineer for Milton. ii. The Webb Road driveway shall be a right/left in, left out, and right out driveway. This 3 lane queue length shall extend a minimum of 100’ or the 95% queue length, whichever is greater, of uninterrupted flow within the site. Driveway location and design shall be approved by Traffic Engineer for Milton and GDOT. iii. The existing driveways on SR 9 shall be evaluated by the Transportation Engineer for Milton and GDOT in response to the signal warrant analysis. 5. To the owner’s agreement to abide by the following: a. The developer’s Professional Engineer shall demonstrate to the City by engineering analysis submitted with the LDP application, that the discharge rate and velocity of the storm water runoff resulting from the development is restricted to seventy-five percent (75%) of the pre-development conditions. Locations shall be as approved by the Stormwater Engineer. b. The water quality and detention facilities shall utilize earthen embankments, where possible. Walled structures are not encouraged. If walled structures are proposed, they must meet the acceptable design standards of the Department of Community Development. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 21 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 c. The Developer shall utilize GASWCC limited application controls. All water quality and detention facilities shall have vegetated surfaces to be regularly maintained by the owner. d. Provide a maximum 75 percent impervious, per drainage basin, at maximum build-out. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 22 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 APPENDIX A Comments on Public Services and Utilities Note: Various City and/or County departments that may or may not be affected by the proposed development provide the following information. Comments herein are based on the applicant’s conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved are required to complete the City of Milton Plan Review process prior to the commencement of any construction activity. City of Milton Arborist Heavily wooded site with a stream running across the NW corner. Two (2) specimen trees were located: 28” Oak 43” Double Sweetgum tree. It appears that they are within the proposed parking lot. Transportation/Hydrology: Comments: A concept Stormwater meeting with the Stormwater Engineer is required. The design and layout shown with the rezoning site plan may or may not meet all minimums required by the City and GASWMM state rules. Detailed design shall be shown on the LDP plans, after said concept meeting. Staff notes that the submitted site plan shows likely inadequate detention and water quality area locations Transportation Facilities: Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 23 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 Mitigation Required from Project Impacts: Webb Road dedicated eastbound right and westbound left turn lanes are required at proposed Webb Road site driveway. The Webb Road driveway shall be a right/left in, left out, and right out driveway. This 3 lane queue length shall extend a minimum of 100’ or the 95% queue length, which ever is greater, of uninterrupted flow within the site. Driveway location and design shall be approved by Traffic Engineer for Milton and GDOT. Signal warrant analysis shall be preformed at Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 24 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 the intersection of SR 9, Eastern Windward Way Commercial driveway, and Eastern Wal-Mart driveway. The signal analysis shall be submitted and analyzed by GDOT. Comments: The proposed mitigation conditions of zoning are in accordance with the Right of Way Ordinance Section 3.2.d. City of Milton Fire Marshal: Traffic congestion could slow response times down in the area and the number of calls for service could increase with the number of employees in the building. Fire lanes will have to be maintained around building. No other comments as long as three sides of access are accessible with required road width and the two access roads are maintained. Milton Public Safety Commercial developments do not impact law enforcement for service as great as residential. However, with increased traffic congestion calls for accidents could increase. Only continued growth in the city will lead to need for additional officers. Fulton County Public Works Department - Sewer The applicant can sewer his property two ways. The property has been owned prior to 2006 and does touch Highway 9. He can put the building on the property were it is shown and pump from the basement, but he can not move it west to the adjoining property. In looking at the depth, the sewer can gravity flow to the gravity system installed on Howard Carson’s near Highway 9. (This is not the section going to the pump station.) Going by gravity would be much more expensive. Fulton County Health Department The Fulton County Health Department recommends that the applicant be required to connect the proposed development to public water and public sanitary sewer available to the site. Since this proposed development constitutes a premise where people work, live, or congregate, onsite sanitary facilities will be mandatory, prior to use or occupancy. This facility must comply with the Fulton County Clean Indoor Air Ordinance. This department is requiring that plans indicating the number and location of outside refuse containers along with typical details of the pad and approach area for the refuse containers be submitted for review and approval. Plats for combination of lots must be submitted to this department for review and approval. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 25 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 26 of 26 RZ07-011 R/P Z97-076 R/A Z94-116 -- Ar City of Milton'cta,v13000 DeeSsld Parkway,Suite 107. Milton.Geargia 30004 CIW COUNCIL AGENDA ITEM TO: City Council DATE: December 5,2007 FROM: Interim City Manager AGENDA ITEM: RZ07-018JU07-0091VC07-010 -To rezone faom C-1 (Community Business) and 0-1 (Office- Institutional) to C-1 (Community Business) to develop a 5,700 square foot retail comrnercia1 building and a Use Permit (Article 19.4.41(1)) for a 3 story (less than 60 feet) 110,000 square foot climate controlled self storage facility and a 2-part concurrent variance to 1) To locate the refuse area adjacent to the street (Article 12G.4.B.4) and 2) To allow parking islands every 1lTH space instead of every 5THspace (Article 4.23.2). MEETING DATE: Thursday, December 13, 2007 Regular Meeting BACKGROUND INFORMA nON: (Attach additional pages rf necessary) See attached memorandum APPROVAL BY CITY MANAGER: APPROVED (1 NOT APPROVED CITY ATTORNEY APPROVAL REQUIRED: (1 YES )()NO CITY ATTORNEY REVIEW REQUIRED: (1 YES fl NQ APPROVAL BY CITY ATTORNEY ()APPROVED (1 NOTAPPROVED PETITION NUMBER(S): RZ07-018 U07-009 VC07-010 PROJECT NAME WEBB ROAD CLIMATE CONTROLED SELF STORAGE/RESTAURANT PROPERTY INFORMATION ADDRESS 2935, 2925 Webb Road DISTRICT, LAND LOT 2/2 1047, 1048 OVERLAY DISTRICT State Route 9 Overlay EXISTING ZONING O-I (Office-Institutional) 05Z-029 & C-1 (Community Business) 00Z-090 PROPOSED ZONING C-1 (Community Business) ACRES 2.62 EXISTING USE Scattered Single Family Residences PROPOSED USE Restaurant and Climate Controlled Self Storage OWNER Webb Road Associates, LLC ADDRESS 2915 Webb Road, Milton, GA 30004 PETITIONER/REPRESENTATIVE Ken Morton PHONE 770-475-3138 INTENT To develop a 5,700 square foot restaurant and a Use Permit (Article 19.4.41(1)) for a 3 story (less than 60 feet) 110,000 square foot climate controlled self storage facility at 44,160 square feet per acre and a 2-part concurrent variance to 1) To locate the refuse area adjacent to the street (Article 12G.4.B.4) and 2) To allow parking islands every 11TH space instead of every 5TH space (Article 4.23.2). Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 1 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION RZ07-018 - APPROVAL CONDITIONAL U07-009 – APPROVAL CONDITIONAL VC07-010, PARTS 1 & 2 – DENIAL CITY OF MILTON PLANNING COMMISSION RECOMMENDATION RZ07-018 - APPROVAL CONDITIONAL U07-009 – APPROVAL CONDITIONAL VC07-010, PARTS 1 & 2 – DENIAL 5-2 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 2 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 LOCATION MAP Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 3 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 CURRENT ZONING MAP Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 4 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 SITE PLAN – Revised Site Plan October 24, 2007 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 5 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 SUBJECT SITE Looking north from site Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 6 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 SPECIMEN TREES ON SITE Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 7 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 SUBJECT SITE: The subject site is located at the southwest corner of Webb Road and SR 9 (Cumming Hwy). It is currently zoned C-1 (Community Business) pursuant to 00Z- 090 located on the eastern portion of the site and O-I (Office-Institutional) pursuant to 05Z-029 and is currently undeveloped except for single family residences/office. Standards of Review (Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate and make a recommendation with respect to factors A. through G., below, as well as any other factors it may find relevant. A. Whether or not the proposal will permit a use that is suitable in view of the use and development of adjacent and nearby Property? The proposed commercial development is suitable based on the existing C-1 (Community Business) approved on the subject site as well as non residential zonings and development surrounding the site. However, the requested height is not suitable in view of adjacent and nearby property based on current policy to allow up to 2 stories in height pursuant to Z05- 029 (a portion of the subject site) approved at 12,844.32 square feet per acre and not to exceed 2 stories and 00Z-090 (subject site) approved at 8,653.9 square feet per acre and not to exceed 1 story. B. Whether or not the proposal will adversely affect the existing use or usability of adjacent or nearby property? The proposed development will not adversely affect the existing uses nearby or adjacent uses if developed with the recommended conditions. C. Whether the property to be affected by the proposal has a reasonable economic use as currently zoned? The property may have a reasonable economic use as currently zoned. D. Whether the proposal will result in a use which will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities or schools? Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 8 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 It is Staff’s opinion that the proposed use may cause increased burden on the streets and transportation facilities and utilities but should be mitigated with the Recommended Conditions. E. Whether the proposal is in conformity with the policies and intent of the land use plan? The proposed C-1 (Community Business) zoning district is partially consistent with the policies and intent of the Focus Fulton 2025 Comprehensive Land Use Plan. A brief description of the project is noted below. Focus Fulton 2025 Land Use Plan Map: Office and Retail Service Proposed use/density: 5,700 sq.ft. restaurant & 110,000 sq.ft. climate controlled self storage facility / 44,160 square feet per acre The Focus Fulton 2025 Land Use Plan Map suggests Retail Service on the majority of the site and Office for the surrounding properties to the west along Webb Bridge Road. The Milton City Council adopted the Focus Fulton 2025 Comprehensive Plan as the City’s Comprehensive Plan on November 21, 2006. The proposed development is partially consistent with the following Plan Policies: • Encourage development consistent with the surrounding scale, transition of densities and uses, and Comprehensive Plan policies, where appropriate. • Building heights should be compatible with the surrounding area and/or be consistent with transitional policies and other land use policies. • Existing trees, particularly specimen trees and trees along road frontages should be preserved. • To the extent possible, open space should be incorporated into all developments. F. Whether there are other existing or changed conditions affecting the use and development of the property which gives supporting grounds for either approval or disapproval of the proposal? Existing zonings of C-1 (Community Business) on the subject site and surrounding properties and adopted land use policies support this request Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 9 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 for a 5,700 square foot restaurant but is partially inconsistent with the proposed 110,000 square foot climate controlled self storage facility but at a maximum height of 2 stories based on policy of the existing zoning on the site that conditions the site to 2 stories. G. Whether the zoning proposal will permit a use which can be considered environmentally adverse to the natural resources, environment and citizens of the City of Milton? Staff notes that the proposed rezoning will have some impact on the environment and natural resources but the recommended conditions will help mitigate the impact. Existing uses and zoning of nearby property (See Map following table) Location Parcel / Zoning Petition Zoning / Name Approved Density/Min. Heated Floor Area North 15 03Z-081 MIX (Mixed Use) Undeveloped office/commercial uses 2,228.14 sq.ft./acre for retail and/or office & 1,662.79 sq.ft./acre for office / 67,000 sf of retail and 50,000 sf of office Further North 16 00Z-151 MIX (Mixed Use) The Park at Windward Village 2.1 u/a Townhomes 1.02 u/a single family attached 0.46 u/a for detached single family Northeast 1 03Z-185 C-1 (Community Business) Deerfield Place-Phase 1 Under Development 9,552.93 sq.ft./acre 299,293 sq.ft. Southeast 2 73Z-001 C-1 (Community Business) Walmart Shopping Center and various businesses None Stated South 2a 06Z-049 C-1 (Commercial) Cactus Car Wash 5,405.41 sq.ft./acre 6,000 sq. ft. South 3 86Z-219 C-1 (Community Business) Re-Max Realty Office 8,000 sq.ft./acre South 4 C-2 (Commercial) 3,935.97/sq.ft./acre Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 10 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 04Z-030 Katy’s Car Wash 3,995 sq.ft. 2 stories South 5 85Z-213 C-1 (Community Business) Fulton Feed & Seed Not Specified Further South 6 06Z-026 C-1 (Community Business) Firestone Tire Store 6,387.67sq.ft/acre 7,250 sq.ft. Further South 7 Z97-075 O-I (Office-Institutional) Nationwide Insurance Office Office in existing structure Further South 8 88Z-211/U88-47 C-1 (Community Business) First Academy Day Care 3,163 sq.ft./acre Southwest 9 Z93-019 C-1 (Community Business) Staton Heating & Air 8,724 sq.ft./acre Southwest 11 Z97-76 C-1 (Community Business) Windward Shopping Ctr 14,048 sq.ft./acre 88,500 sq. ft. 2 stories Further Southwest 12 Kroger Shopping Center City of Alpharetta N/A Further West 13 06Z-073 06U-012 MIX (Mixed Use) and Use Permit Undeveloped 13,000 sq.ft./acre 82,860 2 stories Further West 10 Z94-116 Pending RZ07-011 O-I (Office-Institutional) Undeveloped 1,572 sq. ft./acre 2 stories Further West 10 Z97-76 Pending RZ07-011 C-1 (Community Business) Undeveloped 14,048 sq.ft./acre 88,500 sq. ft. 2 stories Further Northwest 14 00Z-151 MIX (Mixed Use) The Preserve at Windward Village 2.10 u/a 1.02 u/a single family attached 0.46 u/a for detached single family West 17 AG-1 (Agricultural) Single-Family Residential 1 unit/acre 1,500 sq.ft. West 18 06Z-051 O-I (Office-Institutional) I.Q. Academy 2,000 sq. ft within Existing structure West 19 AG-1 (Agricultural) Single-Family Residential 1 unit/acre 1,500 sq.ft. West 20 05Z-029 O-I (Office-Institutional) Undeveloped 12,844.32 s.f./acre 42,900 sq.ft. 2 stories Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 11 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 EXISTING USES AND ZONING MAP Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 12 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 H. Suitability of the subject property under the existing zoning district for the proposed use? The existing zoning district will allow retail service uses for the proposed restaurant on the east portion of the property but not for the climatized storage at the density or configuration that the applicant is requesting. I. Suitability of the subject property under the proposed zoning district for the proposed use? The proposed zoning is suitable for the subject site if it is developed at a maximum height of 1 story for the restaurant. The proposed climate controlled self storage should be developed at a maximum height of 2 stories to create a transition from the subject site to adjacent properties that have been developed or approved at one story. In addition, the policy for the subject site is for a height of 2 stories pursuant to 05Z-029. J. The possible creation of an isolated zoning district unrelated to adjacent and nearby districts. The proposed request would not create an isolated zoning district. K. Possible effects of the change of the zoning or change in use on the character of a zoning district or overlay district? The effect of the proposed zoning, if developed with the recommended conditions, would be minimal to the zoning district or the SR 9 Overlay District. L. Whether the proposed zoning will be a deterrent to the value or improvement of development of adjacent property in accordance with existing regulations? If approved with the recommended conditions, the proposed zoning would be consistent with past policy on the site and be more in keeping with the nearby residential and non-residential development in the area. M. The possible impact on the environment, including but not limited to, drainage, soil erosion and sedimentation, flooding, air quality and water quality? Staff notes that the proposed rezoning may have an impact on the environment because of the increased amount of impervious surface Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 13 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 over the site’s previous use as being undeveloped. If developed with recommended conditions, the impacts will be mitigated. N. The relation that the proposed zoning bears on the purpose of the overall Land Use Plan with due consideration given to whether or not the proposed change will carry out the purposes of this Land Use Plan. The proposed rezoning as submitted is partially consistent with the overall Focus Fulton 2025 Comprehensive Land Use Plan for the area if approved with the recommended conditions. O. The consideration of the preservation of the integrity of residential neighborhoods shall be considered to carry great weight. In those instances in which property fronts on a major thoroughfare and also adjoins an established residential neighborhood, the factor of preservation of the residential area shall be considered to carry great weight. Staff is of the opinion that if approved at a maximum height of 2 stories, the proposed climate controlled self storage will create a better transition from commercial to other non-residential and multi-family to the north. P. The amount of undeveloped or zoned land in the general area affected which has the same zoning or future land use classification as the proposed rezoning. There are currently approved zonings and land use classifications in the general area of the subject site that are similar to the proposed rezoning. In the interest of the public health, safety and welfare, the Mayor and City Council may exercise limited discretion in evaluating the site proposed for a use that requires a Use Permit. In exercising such discretion pertaining to the subject use, the Mayor and City Council shall consider each of the following as outlined in Article 19.2.4 of the Zoning Ordinance; Use Permit Considerations. Staff has reviewed said items pertaining to the subject use, and, offers the following comments: A. Whether the proposed use is consistent with the land use or economic development plans adopted by the Mayor and City Council: Provided the applicant complies with the Recommended Conditions and the Use Permit requirements of Article (Article 19.4.41(1)) of the Zoning Ordinance, the proposed development is consistent with the intent and following policies of the Comprehensive Plan: Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 14 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 • Encourage development consistent with the surrounding scale, transition of densities and uses, and Comprehensive Plan policies, where appropriate. • Commercial uses and higher density residential developments are limited to areas designated in the Comprehensive Plan and Land Use Map. B. Compatibility with land uses and zoning districts in the vicinity of the property for which the use permit is proposed; If developed in accordance with Staff’s Recommended Conditions and the provisions of the Zoning Ordinance, the proposed climate controlled self storage facility is expected to be compatible with other land uses nearby in the surrounding area. C. Whether the proposed use may violate local, state and/or federal statutes, ordinances or regulations governing land development; The proposed use does not violate any known local, state and/or federal statutes, ordinances or regulations governing land development. D. The effect of the proposed use on traffic flow, vehicular and pedestrian, along adjoining streets; The proposed use may increase the amount of vehicular traffic, but the impact should be mitigated with the recommended conditions. E. The location and number of off-street parking spaces; Article 18.2.1 requires the applicant to provide a minimum of 1 parking space per every 5,000 square feet and 1 parking space per employee. The applicant is proposing 23 parking spaces located in front of the building along Webb Road. The proposed parking meets the minimum required amount of parking. F. The amount and location of open space; The applicant’s site plan indicates a minimal amount of open space because of the high density of the development proposed for the site. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 15 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 G. Protective screening; The proposed development will retain most of the existing trees located in the stream buffer. The parking areas can be screened by additional vegetation, as required by the City Tree Ordinance. H. Hours and manner of operation; The applicant has indicated that building will be used during regular business hours. I. Outdoor lighting; The applicant has indicated that the site lighting will comply with Highway 9 Overlay requirements. J. Ingress and egress to the property. The applicant’s site plan proposes one curb cut on State Route 9 (No left turn permitted onto SR 9) and one on Webb Road. The Webb Road curb cut is located across from the existing curb cut on the north side of Webb Road. In summary, the proposed Use Permit is consistent with the policies of the Focus Fulton 2025 Land Use Plan, the existing C-1 district on the subject site, and development standards required by Article 19.4.41(1) if approved with the recommended conditions to limit the height of the building to 2 stories. Therefore, Staff recommends this petition, U07-009 be APPROVED CONDITIONAL subject to the attached Recommended Conditions. SITE PLAN ANALYSIS Based on the applicant’s site plan submitted to the Community Development Department on October 24, 2007, Staff offers the following considerations: BUILDING SETBACKS The following building setbacks are required for the proposed C-1 (Community Business) development: Front (State Route 9) – 40 feet Side Corner (Webb Road) – 40 feet Side (South Property line) – 0 feet Rear (West Property line) – 25 feet Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 16 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 The site plan indicates the compliance with the required building setbacks. BUILDING HEIGHT The applicant has requested a one story restaurant on the eastern portion of the site. This is consistent with Board policy on the site and will be reflected in the recommended conditions. The applicant has proposed a three (3) story climate controlled storage facility. The current zoning pursuant to 00Z-090 was approved for a maximum of one story and further to the west on the subject site 05Z-029 was approved for 2 stories. Also, Board policy for the surrounding commercial and office zonings do not exceed 2 stories in height. Therefore, Staff will condition the height of the self storage facility to 2 stories not to exceed 30 feet from average grade. LANDSCAPE STRIPS AND BUFFERS Front (State Route 9) – 20 foot landscape strip (Per State Route 9 Overlay) Side Corner (Webb Road) – 20 foot landscape strip (Per State Route 9 Overlay) Side (South Property line) – 10-foot landscape strip Rear (West Property line) – 10-foot landscape strip It appears that the site plan meets or exceeds the required landscape strips. PARKING REQUIREMENTS The following chart illustrates the parking required by Article 18 of the City of Milton Zoning Ordinance for the proposed uses: Proposed Use Restaurant (5,700 sq.ft.) Minimum Requirement 10 spaces per 1,000 sq. ft. of restaurant (57 spaces) Spaces Provided 68 Provided for Restaurant Self Storage (110,000 sq.ft. ) 1 per 5,000 sq.ft. (22) 1 per employee (1) 23 Provided for storage Total 115,700 sq.ft 80 spaces required 91 spaces provided Staff notes that the applicant is providing 91 parking spaces, which exceeds the required 80 parking spaces required per Article 18 of the City of Milton Zoning Ordinance. Specifically, the site plan does not exceed the minimum for the storage facility but is exceeding the required parking for the restaurant by 11 spaces. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 17 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 The applicant is requesting a concurrent variance to allow parking islands every 11TH space instead of every 5TH space (Article 4.23.2). The site plan shows a total of 68 parking spaces. To meet the requirement per Article 4.23.2, an additional 6 spaces are required. By providing the required landscape islands, a total of 62 spaces will remain. The applicant has not demonstrated a hardship that is not self imposed. Therefore, Staff recommends DENIAL of Part 2, VC07-010. OTHER CONSIDERATIONS Article 12G.4.B.4 in the SR 9 Overlay District requires refuse areas to be placed in the least visible location from public streets. The site plan shows the refuse area enclosed within the building that fronts Webb Road. This location is not consistent with the required location. It is Staff’s opinion that the applicant could relocate the refuse area to the side or rear of the building. Therefore, Staff recommends DENIAL of Part 1, VC07-010. The site plan is in compliance with the State Route 9 Overlay District development standards. It is also compliant with the Use Permit standards pursuant to Article 19.4.41(1). CITY ARBORIST Need to demonstrate an effort to save the three specimen trees in the northeast corner of the property. PUBLIC INVOLVEMENT On October 24, 2007 the Community Zoning Information Meeting was held at the Milton City Hall. There were approximately two members of the community in attendance that were interested in the subject site. Public Comment: Staff has received 1 e-mail which represents the Regency at Windward Square in opposition to the requested development because of increased traffic in the area. It is attached to this report. City of Milton Design Review Board Meeting – November 4, 2007 This case was not reviewed by the DRB, but will be reviewed at the December 4, 2007 meeting. Public Notice Requirements The rezoning petition was advertised in the Milton Herald on November 21, 2007 and the sign was installed before the required date of November 7, 2007 along Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 18 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 the frontage of Webb Road. The notice of rezoning was sent,to adjacent property owners on November 10, 2007. Public Participation Plan and Report The applicant has met the requirements of the Public Participation Plan. The applicant will be required to submit the public participation report 7 days prior to the Mayor and City Council meeting. CONCLUSION The proposed development is consistent with Plan Policies and Board Policy for the development of C-1 (Community Development) to develop a restaurant and climatized self storage. The petitioner’s request for four stories is inconsistent with Board policy on the site as well as for surrounding developments that limit the height of buildings to 2 stories. Therefore, Staff recommends APPROVAL CONDITIONAL of RZ07-011 but to limit the height to 2 stories. Staff recommends DENIAL of Parts 1 and 2 of VC07-010 based on the fact that the applicant has not demonstrated a hardship that is not self imposed. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 19 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 RECOMMENDED CONDITIONS If this petition is approved by the Mayor and City Council, it should be APPROVED O-I (Office-Institutional) CONDITIONAL subject to the owner’s agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Mayor and City Council. 1) To the owner’s agreement to restrict the use of the subject property as follows: a) Retail, service commercial and/or office and accessory uses, including all exterior food and beverage service areas, at a maximum density of 44,160 gross square feet per acre zoned or a total of 115,700 square feet excluding fast food restaurants and drive throughs. b) 110,000 square foot climate controlled self storage excluding businesses operating within the facility, truck rentals, and no outside storage. (U07-009) c) Limit the height of the 5,700 square foot building to no more than 1 story. d) Limit the height of the 110,000 square foot climate controlled self storage to 2 stories and 30 feet in height to the eave. 2) To the owner’s agreement to abide by the following: a) To the revised site plan received by the Community Development Department on October 24, 2007. Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Ordinance, all other applicable city ordinances and these conditions prior to the approval of a Land Disturbance Permit. In the event the Recommended Conditions of Zoning cause the approved site plan to be substantially different, the applicant shall be required to complete the concept review procedure prior to application for a Land Disturbance Permit. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 20 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 3) To the owner’s agreement to abide by the following requirements, dedication and improvements: a. Reserve the necessary Right of Way along the necessary property frontage of Webb Road and SR 9, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide for compliance with the Transportation Master Plan and the adjacent developments, according to the definitions in the Right of Way Ordinance. The sidewalk/trail shall be located at the back of the reserved Right of Way. b. Dedicate at no cost to the City of Milton prior to the approval of a Land Disturbance Permit or Certificate of Occupancy (whichever comes first), sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to the City of Milton such additional right-of-way as may be required by the Transportation Engineer for Milton and GDOT to: i. Provide at least 10.5 feet of right-of-way from the back of curb (or edge of pavement for rural areas) of all abutting road improvements, along the entire property frontage, as well as allow the necessary construction easements while the rights-of-way are being improved. ii. Provide at least 5 feet of right-of-way for future construction of a standard bicycle lane across the frontage of Cumming Hwy (SR9) for limits of overlay as approved by the Transportation Engineer for Milton and GDOT. c. Provide as a minimum 55 feet of right-of-way from centerline on Cumming Hwy (SR9). Provide 45 feet of right-of-way from centerline of Webb Road. d. Provide the following elements on Webb Road: i. WB Left Turn Lanes on Webb Road at both driveways ii. EB Right auxiliary lane along the entire property frontage on Webb Road with necessary striping. iii. Easements where required shall be provided for sidewalks, as required by the Community Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 21 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 Development Director. Provide six foot wide concrete sidewalk along the entire frontage of the property with a minimum 5 foot grass strip between the sidewalk and the back of curb, as approved by the Community Development Director. iv. Gates are not allowed. v. Provide asphalt overlay along entire frontage as directed by the Transportation Engineer for Milton. e. Provide the following elements on SR 9: i. SB Right auxiliary lane and 5-foot bike lane along the entire property frontage on SR 9 with necessary striping. All improvements should be approved by the Transportation Engineer for Milton and the Georgia Department of Transportation. ii. Provide motorized Inter parcel access to all adjoining properties as required by the Transportation Engineer for Milton. Provide additional non-motorized Inter parcel trails or sidewalks as may be required by the Transportation Engineer for Milton. iii. Installation and dedication of a new decorative mast arm traffic signal at the intersection of Webb Road and Cumming Highway (SR 9) prior to a C.O. as approved by the Transportation Engineer for Milton and GDOT. The applicant is required to meet with and coordinate his improvements with the developers on all sides of his improvements. Signalized intersections shall not be designed as a split phase operation because of poor alignment or sight distance as approved by the Transportation Engineer for Milton and GDOT. iv. Driveway entrances shall meet the Community Service Policies and AASHTO guidelines, or roads be reconstructed to meet such criteria, at the approval of the Transportation Engineer for Milton and GDOT. Driveway entrances shall provide for the 95% queue with uninterrupted traffic flow onto the main line and/or a minimum throat length of one hundred Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 22 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 feet at a maximum grade of six percent or as approved by the Transportation Engineer for Milton and GDOT. v. Driveway access on SR 9 to be permitted by the Transportation Engineer for Milton and GDOT. vi. Easements where required shall be provided for sidewalks, as required by the Community Development Director. Provide six foot wide concrete sidewalk along the entire frontage of the property with a minimum 5 foot grass strip between the sidewalk and the back of curb new sidewalk installations along the rights-of-ways shall have a transverse double row of faux concrete brick pavers every 50 feet as approved by the Community Development Director. vii. Provide asphalt overlay along entire frontage as directed by the Transportation Engineer for Milton and the Georgia Department of Transportation. 4) To the owner’s agreement to abide by the following: a. The developer’s Professional Engineer shall demonstrate to the City by engineering analysis submitted with the LDP application, that the discharge rate and velocity of the storm water runoff resulting from the development is restricted to seventy-five percent (75%) of the pre-development conditions. Locations shall be as approved by the Stormwater Engineer. b. The water quality and detention facilities shall utilize earthen embankments, where possible. Walled structures are not encouraged. If walled structures are proposed, they must meet the acceptable design standards of the Department of Community Development. c. The Developer shall utilize GASWCC limited application controls. All water quality and detention facilities shall have vegetated surfaces to be regularly maintained by the owner. d. Provide a maximum 75 percent impervious, per drainage basin, at maximum build-out. e. Recommend utilization of pervious materials for perimeter parking spaces or as approved by the Transportation Engineer. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 23 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 APPENDIX A Comments on Public Services and Utilities Note: Various City and/or County departments that may or may not be affected by the proposed development provide the following information. Comments herein are based on the applicant’s conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved are required to complete the City of Milton Plan Review process prior to the commencement of any construction activity. City of Milton Arborist Heavily wooded site with a stream running across the NW corner. Two (2) specimen trees were located: 28” Oak 43” Double Sweetgum tree. It appears that they are within the proposed parking lot. Transportation: Comments: A concept Stormwater meeting with the Stormwater Engineer is required. The design and layout shown with the rezoning site plan may or may not meet all minimums required by the City and GASWMM state rules. Detailed design shall be shown on the LDP plans, after said concept meeting. Staff notes that the submitted site plan shows likely inadequate detention and water quality area locations Transportation Facilities: Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 24 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 Mitigation Required from Project Impacts: Webb Road dedicated eastbound right and westbound left turn lanes at both proposed site driveways. Shared site entrance with southern parcel on Cumming Highway (SR 9) shall be a right/left in, left out, and right out driveway. This 3 lane queue length shall extend a minimum of 100’ uninterrupted flow within the site. Driveway location and design shall be approved by Traffic Engineer for Milton and GDOT. Comments: The proposed mitigation conditions of zoning are in accordance with the Right of Way Ordinance Section 3.2.d. Hydrology: Types of detention proposed: City of Milton Fire Marshal: Fire department access has to be maintained in any commercial structure above 30 feet. Approved Access roads will have to be maintained at all times. The fuel load in the storage facility could increase water usage in cases of a fire. Milton Public Safety Commercial developments do not impact law enforcement for service as great as residential. However, with increased traffic congestion calls for accidents could increase. Only continued growth in the city will lead to need for additional officers. Fulton County Health Department The Fulton County Health Department recommends that the applicant be required to connect the proposed development to public water and public sanitary sewer available to the site. Since this proposed development constitutes a premise where people work, live, or congregate, onsite sanitary facilities will be mandatory, prior to use or occupancy. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 25 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 This facility must comply with the Fulton County Clean Indoor Air Ordinance. Since this proposed development includes a food service facility, the owner must submit kitchen plans for review and approval by this department before issuance of a building permit and beginning construction. The owner must obtain a food service permit prior to opening. This department is requiring that plans indicating the number and location of outside refuse containers along with typical details of the pad and approach area for the refuse containers be submitted for review and approval. Plats for combination of lots must be submitted to this department for review and approval. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 26 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 27 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 12/6/2007 Page 28 of 28 RZ07-018/U07-009/VC07-010 R/P 05Z-029 R/A 00Z-090 A& City of MiRon- 13000 Meld Pahvay, Suite 107, Milton, Georgia 30004 CITY COUNCIL AGENDA ITEM TO: City Council DATE: December 5,2007 FROM: Interim City Manager AGENDA ITEM: W07-0191UOT-0101 VC07-011-To rezone from C-1 (Community Business) to 0-1 (Ofice-Institutional) to develop 23,000 square feet of office. The applicant is also requesting a Use Permit to exceed the district height, Article 19.4.21, to allow the building to be constructed at a maximum height of 70 feet that includes an underground garage and 3 stories of ofice. To request a 3-part concurrent variance to 1) To reduce the side setback from 20 feet to 15 feet along the north property line (Article 8.1.3.C.);2) To reduce the 25-foot non-impervious buffer, to allow approximately 6,O 10 sq.ft.of encroachment to allow parking on pervious pavement (City Code Chapter 14, Section 6.5.(i); 3)To reduce the 50-foot undisturbed stream buffer to allow approximately 675 sq.ft. of encroachment to allow parking on pervious pavement (City Code Chapter 14, Section 6.5 (ii)). MEETING 'PATE: Thursday, December 13, 2007 Regular Meeting BACKGROUND INFORMA TlON: (Attach additfonal pages if necessary) See attached memorandum APPROVAL BY CITY MANAGER: APPROVED () NOT APPROVED i\ CITY APTORNEY APPROVAL REQUIRED: () YES RNO CITY ATTORNEY REVIEW REQUIRED: () YES HNO APPROVALBYGi7YATTQRNEY ()APPROVED 6) NOT APPROVED PETITION NUMBER(S) RZ07-019 U07-010 VC07-011 PROJECT NAME Charter Global PROPERTY INFORMATION ADDRESS 12800 Deerfield Parkway DISTRICT, LAND LOT 2/2 114,113 OVERLAY DISTRICT State Route 9 EXISTING ZONING C-1 (Community Business) Z00-025 PROPOSED ZONING O-I (Office & Institutional) ACRES 3.04 EXISTING USE Undeveloped PROPOSED USE 3 story office building with underground parking OWNER Charter Global, Inc. ADDRESS 5445 Triangle Parkway, Suite 190, Norcross, GA 30092 PETITIONER/REPRESENTATIVE Wendy S. Butler, W. Butler Legal Services, LLC ADDRESS 11330 Lakefield Drive, Building II, Suite 200, Johns Creek, GA 30097 PHONE 770.814.4255 INTENT To rezone from C-1 (Community Business) to O&I (Office & Institutional) to develop a 23,000 square foot, three story office building, with an underground parking garage, at a density of 7,565.79 square feet per acre. The applicant is requesting a Use Permit (Article 19.4.21) to allow the proposed building to be constructed at a height of 70 feet. The applicant is also requesting a three-part concurrent variance: 1) To reduce the side setback from 20 feet to 15 feet along the north property line; 2) To encroach into the 50 foot stream bank buffer by approximately 675 square feet to allow pervious parking; 3) To encroach into the 75 foot impervious setback by approximately 5,701 square feet to allow pervious parking. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 1 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION APPROVAL CONDITIONAL -- RZ07-019 APPROVAL CONDITIONAL -- U07-010 APPROVAL CONDITIONAL -- VC07-011, Parts 1-3 CITY OF MILTON PLANNING COMMISSION APPROVAL CONDITIONAL -- RZ07-019 APPROVAL CONDITIONAL -- U07-010 APPROVAL CONDITIONAL -- VC07-011, Parts 1-3 7-0 Planning Commission asked that the applicant protect trees and pervious surfaces as much as possible. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 2 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 LOCATION MAP Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 3 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 CURRENT ZONING MAP Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 4 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 REVISED SITE PLAN – November 13, 2007 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 5 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Subject Site (Looking from Deerfield Pkwy) Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 6 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Specimen Trees on Subject Site Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 7 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 SUBJECT SITE: A 3.04 acre site currently zoned C-1 (Community Business) pursuant to Z00-025 approved for retail, service commercial, and or office, and accessory uses at a density of 5,197.37 square feet per acre or a total of 15,800 square feet, whichever is less. The site is currently vacant. It is wooded and contains an unnamed creek which flows along the southern property line, eventually draining into Lake Deerfield. The subject property is currently bordered by O&I zoned properties to the north and south and C-1 properties to the west. The property is part of the planned development of Lake Deerfield, and is subject to covenants of the development. The property is also subject to the State Route 9 Overlay District regulations. Standards of Review (Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate and make a recommendation with respect to factors A. through G., below, as well as any other factors it may find relevant. A. Whether or not the proposal will permit a use that is suitable in view of the use and development of adjacent and nearby Property? The proposed office development is suitable based on: 1. The existing O&I (Office & Institutional) zoning to the north, pursuant to Z99-011 approved at 19,191square feet per acre and 6 stories. 2. The existing O&I (Office & Institutional) zoning to the south, pursuant to Z97-123 approved at 13,000 square feet per acre and 6 stories. 3. The existing O&I (Office & Institutional) zoning to the east, pursuant to Z97-098 approved at 11,500 square feet per acre and 4 stories. 4. The existing C-1 (Community Business) zoning to the west, pursuant to Z73-001. No density stated. The original rezoning for this site was approved in 2000, for a 15,800 square foot building, at 5,197.37 square feet per acre with no height restriction. The applicant is currently proposing a 23,000 square foot building, at a density of 7,565.79 square feet per acre. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 8 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 B. Whether or not the proposal will adversely affect the existing use or usability of adjacent or nearby property? The proposed development will not adversely affect the existing uses nearby or adjacent uses if developed with the recommended conditions. C. Whether the property to be affected by the proposal has a reasonable economic use as currently zoned? The property does have a reasonable economic use as currently zoned as it is zoned C-1 (Community Business). D. Whether the proposal will result in a use which will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities or schools? It is Staff’s opinion that the proposed use may cause an increased burden on the streets and transportation facilities and utilities but should be mitigated with the Recommended Conditions. E. Whether the proposal is in conformity with the policies and intent of the land use plan? The proposed O&I (Office & Institutional) zoning is consistent with the policies and intent of the Focus Fulton 2025 Comprehensive Land Use Plan. The subject property is located along the west side of Deerfield Parkway, north of Morris Road, which the Comprehensive Plan discusses as being appropriate for Retail and Service uses. It is the opinion of the Staff that the proposed use and its proximity to other service, commercial and office uses lends itself to the desired retail and service composition of the area and complies with the policies of the Comprehensive Plan. Focus Fulton 2025 Land Use Plan Map: Retail & Service Proposed use/density: 3 Story Office with parking under building/7,565.79 square feet per acre The Focus Fulton 2025 Land Use Plan Map suggests Retail and Service for the surrounding properties along the Deerfield Parkway corridor south of Webb Road, and north of Windward Parkway. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 9 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 The Milton City Council adopted the Focus Fulton 2025 Comprehensive Plan as the City’s Comprehensive Plan on November 21, 2006. The proposed development is consistent with the following Plan Policies: • Developments in the Retail and Service land use should provide inter-parcel access within and between land uses to improve transportation circulation and increase pedestrian safety. The development proposes interparcel access to the property to the North. • Direct business to areas throughout the City that are targeted for economic growth. The proposed building is in a planned office/retail/commercial center. • Encourage development that improves air quality and protects human heath and the environment. The proposed development will utilize pervious parking and possibly a green roof. • The transportation system should incorporate automobile, transit when available, bicycle, pedestrian facilities. The proposed development is on an existing bus route and includes existing sidewalks. F. Whether there are other existing or changed conditions affecting the use and development of the property which gives supporting grounds for either approval or disapproval of the proposal? Existing zonings of community business on the subject site and to the west, and of office and institutional to the north , south, and east, as well as adopted land use policies support this request to develop an office building. G. Whether the zoning proposal will permit a use which can be considered environmentally adverse to the natural resources, environment and citizens of the City of Milton? Staff notes that the proposed rezoning will have some impact on the environment and natural resources, but materials proposed by the applicant and the recommended conditions will help mitigate the impact. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 10 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Existing uses and zoning of nearby property (See Map following table) Location Parcel / Zoning Petition Zoning / Development Name Approved Density (sq ft per acre)/ Max Square Feet of Bldg North 1 Z-93-011 U99-008 (to exceed height) O&I (Office & Institutional) Undeveloped 19,191/223,000 Six stories East 2 Z97-098 O&I (Office & Institutional) Verizon office buildings 11,500/437,000 Four Stories South 3 Z97-123 O&I (Office & Institutional) Marriot Spring Hills Suites hotel 13,000/282,000 Six Stories Southwest 4 Z96-127 C-1 (Community Business) Home Depot 11,625/262,500 Four Stories West 5 Z73-001 C-1 (Community Business) Walmart None Stated Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 11 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 EXISTING USES MAP Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 12 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 H. Suitability of the subject property under the existing zoning district for the proposed use? The existing zoning of C-1 (Community Business) is suitable; however, the building that is currently allowed per RZ00-025 is 7,200 square feet smaller than then proposed building. I. Suitability of the subject property under the proposed zoning district for the proposed use? The proposed use is suitable for the proposed zoning district of O&I (Office and Institutional). This zoning district allows for offices and hotels, which are some of the existing uses surrounding the subject property. J. The possible creation of an isolated zoning district unrelated to adjacent and nearby districts. The proposed rezoning to O&I (Office and Institutional) would not create an isolated district. There are O&I (Office and Institutional) zonings in the immediate vicinity to the north, south and east of the subject property along the Deerfield Parkway corridor. K. Possible effects of the change of the zoning or change in use on the character of a zoning district or overlay district? Staff notes that the proposed change of zoning will not have a negative impact on the character of the State Route 9 Overlay District. The proposed rezoning request will give continuity to Deerfield Parkway corridor, continuing an already existing use. L. Whether the proposed zoning will be a deterrent to the value or improvement of development of adjacent property in accordance with existing regulations? Staff is of the opinion that the change in the zoning will not be a deterrent to the value of adjacent properties developed or anticipated to be developed under existing regulations. M. The possible impact on the environment, including but not limited to, drainage, soil erosion and sedimentation, flooding, air quality and water quality? Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 13 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Staff notes that the proposed rezoning may have an impact on the environment because of the increased amount of storm water runoff, and the encroachment of impervious surfaces in the 75 foot impervious setback buffer and the 50 foot stream bank buffer. However, the use of pervious materials for the parking lot, and the recommended conditions should help mitigate any negative impact. N. The relation that the proposed zoning bears on the purpose of the overall Land Use Plan with due consideration given to whether or not the proposed change will carry out the purposes of this Land Use Plan. The proposed rezoning, as submitted, is consistent with the overall Focus Fulton 2025 Comprehensive Land Use Plan which recommends Retail and Service for the subject site. There are commercial, service and office uses adjacent to the subject property. O. The consideration of the preservation of the integrity of residential neighborhoods shall be considered to carry great weight. In those instances in which property fronts on a major thoroughfare and also adjoins an established residential neighborhood, the factor of preservation of the residential area shall be considered to carry great weight. There are no residential uses adjoining the subject property. P. The amount of undeveloped or zoned land in the general area affected which has the same zoning or future land use classification as the proposed rezoning. There is an undeveloped, O&I (Office and Institutional) zoned, 21.3 acre parcel to the north of the subject property, and a 2.35 acre O&I (Office and Institutional) zoned property with an existing hotel, to the south of the subject property. To the east, there is a 43.42 acre, O&I zoned property containing office buildings. All of these surrounding properties fall within the Retail and Service designation on the 2025 Future Land Use Map. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 14 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 In summary, the proposed O&I zoning is consistent with the policies of the Focus Fulton 2025 Land Use Plan, the existing C-1 district on the subject site, and the surrounding C-1 and O&I districts. Therefore, Staff recommends that this petition, RZ07-019 be APPROVED CONDITIONAL subject to the attached Recommended Conditions. Per Article 8.1.3.A, O&I zoning allows four story, 60 foot tall buildings. The applicant is requesting a Use Permit to allow a three story, 70 foot tall office building, with one story of parking underneath the building. While the building technically will be four stories, the parking structure will remain open and embedded in the slope. Only three floors will be occupied by offices. The structure will be 70 feet high from finished grade. Other Use Permits for height increase have been approved in the vicinity of the subject property. Immediately to the north, U99-008 was approved allowing a six story building. To the north of this site, U00-025 was approved allowing a six story building. There are no adjacent residential uses that would be adversely affected by the approval of the height increase. In the interest of the public health, safety and welfare, the Mayor and City Council may exercise limited discretion in evaluating the site proposed for a use that requires a Use Permit. In exercising such discretion pertaining to the subject use, the Mayor and City Council shall consider each of the following as outlined in Article 19.2.4 of the Zoning Ordinance; Use Permit Considerations. Staff has reviewed said items pertaining to the subject use, and, offers the following comments: A. Whether the proposed use is consistent with the land use or economic development plans adopted by the Mayor and City Council: Provided the applicant complies with the Recommended Conditions and the Use Permit requirements of Article 19.4.2 of the Zoning Ordinance, the proposed development is consistent with the intent and following policies of the Comprehensive Plan: • Encourage development consistent with the surrounding scale, transition of densities and uses, and Comprehensive Plan policies, where appropriate. • Commercial uses and higher density residential developments are limited to areas designated in the Comprehensive Plan and Land Use Map. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 15 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 B. Compatibility with land uses and zoning districts in the vicinity of the property for which the use permit is proposed; If developed in accordance with Staff’s Recommended Conditions and the provisions of the Zoning Ordinance, the proposed office is expected to be compatible with other land uses, and approved use permits allowing six story buildings, in the surrounding area. C. Whether the proposed use may violate local, state and/or federal statutes, ordinances or regulations governing land development; The proposed use does not violate any known local, state and/or federal statutes, ordinances or regulations governing land development. D. The effect of the proposed use on traffic flow, vehicular and pedestrian, along adjoining streets; The proposed use may increase the amount of vehicular traffic, but the impact should be mitigated with the recommended conditions. Staff notes that there is an existing sidewalk along the Deerfield Parkway frontage, which will facilitate pedestrian access. Also of note, the subject property is on a current Marta bus line. E. The location and number of off-street parking spaces; Article 18.2.1 requires the applicant to provide a minimum of 3 parking spaces per every 1000 square feet, up to 250,000 square feet. The applicant is proposing 75 parking spaces located in front, behind and underneath the building. All parking areas will be located on site, and will consist of pervious paving materials, enhanced by a 6-10 inch gravel base. The proposed site plan shows 675 square feet of pervious parking within the 50 foot undisturbed buffer, and 6,010 square feet of pervious parking in the 75 foot impervious setback. F. The amount and location of open space; The applicant’s site plan indicates that over half of the subject site is undeveloped due to the stream buffers. Staff is of the opinion that the proposed development will provide adequate open. Approximately 52,146 square feet (1.2 acres) will be disturbed on the 3 acre site. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 16 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 G. Protective screening; The proposed development will retain most of the existing trees located in the stream buffer. The parking areas can be screened by additional vegetation, as required by the City Tree Ordinance. H. Hours and manner of operation; The applicant has indicated that building will be used during regular business hours. I. Outdoor lighting; The applicant has indicated that the site lighting will comply with Highway 9 Overlay requirements. J. Ingress and egress to the property. The applicant’s site plan proposes one curb cut on Deerfield Parkway. Staff notes that the curb cut will be located on the adjacent Crescent Resources property to the North. The property is currently undeveloped, so the entrance will be built as part of this development. It is Staff’s opinion that this shared entrance will be a benefit by minimizing interruptions to the flow of traffic along Deerfield Parkway. In summary, the proposed Use Permit is consistent with the policies of the Focus Fulton 2025 Land Use Plan, the existing C-1 district on the subject site, and the surrounding C-1 and O&I districts, and associated Use Permits to exceed the district height. Therefore, Staff recommends this petition, U07-010 be APPROVED CONDITIONAL subject to the attached Recommended Conditions. SITE PLAN ANALYSIS Based on the applicant’s revised site plan submitted to the Community Development Department on November 6, 2007, Staff offers the following considerations: Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 17 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 BUILDING SETBACKS The site plan indicates compliance with the following zoning district minimum building setbacks pursuant Article 8.1.3: Front Yard (adjacent to Deerfield Parkway) 40 feet Rear Yard (west property line) 25 feet The applicant is requesting approval of a concurrent variance to reduce the north side yard setback from 20 feet to 15 feet. This will allow the proposed building to encroach into the existing 20 foot setback by 5 feet. The property is bounded on the south by a unnamed creek, and its associated buffers. It is Staff’s opinion that this is a reasonable request due to the size, shape and topography of the subject lot, and recommends APPROVAL CONDITIONAL of Part 1 of VC07-011. LOT COVERAGE Per Article 8.1.3.J, the area of the footprint of all buildings and parking shall not exceed 70 percent of the total land area. The proposed development meets this requirement. LANDSCAPE STRIPS AND BUFFERS In addition to the State’s 25 foot stream bank buffer, Chapter 14, Article 6, Section 5, (a) of the City Code, requires that an undisturbed, natural vegetative buffer shall be maintained for 50 feet on both banks of the stream, along with an additional 25 setback, beyond the undisturbed buffer, in which all impervious cover shall be prohibited. Grading, filling and earthmoving shall be allowed, but minimized within this setback. The applicant’s letter of intent states that this site was originally subdivided and planned when the State only required a 25 foot stream buffer, along with a 35 foot stream buffer, required by Fulton County. Faced with constraints due to the shape of the property, and the more restrictive buffers, the applicant states that it is necessary for the proposed parking to encroach into the 50 buffer and 75 impervious setback. The proposed development shows parking encroaching into the 50 foot stream bank buffer by approximately 675 square feet, and parking encroaching into the 75 foot impervious setback by approximately 5,701 square feet. The letter of intent states that the developer has taken every effort to avoid placing any development within the stream Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 18 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 buffers, and wishes to maintain the natural portions of the property wherever possible. To minimize the disturbance to the buffer, pervious concrete will be used for all parking areas, creating a 93 percent pervious area. In the effort to further minimize disturbance of the buffer, the applicant also proposes a large retaining wall along the northern property line and underground parking. Article 12G.4 Section A.1 of the State Route 9 Overlay District requires a twenty (20) foot-wide landscape strip along Deerfield Parkway. Article 12G.4 Section A.3 further states that for every thirty (30) linear feet of landscape strip, a minimum of one 3” caliper hardwood shade tree is required to be planted in the center of the landscape strip or as approved by the Director. Although the site plan does not indicate the 20 foot landscape strip along Deerfield Parkway, there appears to be adequate area and existing trees to meet this requirement. PARKING REQUIREMENTS The following chart illustrates the parking required by Article 18 of the City of Milton Zoning Ordinance for the proposed use: Type of Use spaces / 1000 sf Approx. Project sf Spaces Required Spaces Provided Office 3 23,000 69 75 Totals 23,000 69 75 Staff notes that the applicant is proposing 75 parking spaces, which are six (6) over (8.6%) of the parking spaces required per Article 18 of the City of Milton Zoning Ordinance. While, the least amount of parking is encouraged, Staff notes that all of the proposed parking will be constructed of pervious concrete, and that 20 spaces will be located under the proposed building. Due to the applicant’s efforts to minimize surface runoff on the entire site, and the constraints of the property, Staff recommends APPROVAL CONDITIONAL OF Part 2 of VC07-011, and APPROVAL CONDITIONAL OF Part 3 of VC07-011. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 19 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 OTHER CONSIDERATIONS There is no on-site detention proposed for this site; any runoff from this site will be routed to Lake Deerfield. The pervious concrete proposed for the paving is designed to minimize the amount of oil and sediment that will enter the stream. Most of the oil, anti-freeze, and other automobile fluids that can be washed into streams when it rains will be picked up by the “first flush” (the first one inch of rainfall). By capturing the first flush and allowing it to percolate into the ground, the pervious concrete allows soil chemistry and biology to “treat” the polluted water naturally. City Arborist Comments: The Arborist notes that this is a very nice, wooded site, with sloping topography, adjacent to a stream. There is a very good mix of hardwood tress, small to mature in size. There appears to be only one specimen tree located on the site, a 30 inch tulip poplar. The Arborist suggests that the applicant tries to incorporate green design elements as much as possible. Staff notes that prior to issuance of a Land Disturbance Permit and any Building Permits, the City of Milton Design Review Board will be required to review the plans. PUBLIC INVOLVEMENT On October 24, 2007 the applicant was present at the Community Zoning Information Meeting held at the Milton City Hall. No one attended this meeting. Public Comments – None at this time. City of Milton Design Review Board Meeting – November 6, 2007 The following comments were made by the DRB: • The proposed building seems too big for the site. • Consider giving development a wooded campus feel. • Save as many hardwoods as possible. • Consider making parking more freeform—work around trees, eliminate curb. • Consider a building that is not square. Public Notice Requirements Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 20 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 The rezoning petition was advertised in the Milton Herald on November 21, 2007 and the sign was installed before the required date of November 7, 2007 along the frontage of Deerfield Parkway. The notice of rezoning, use permit and concurrent variances was mailed to adjacent property owners on November 8, 2007. Public Participation Plan and Report The applicant has met the requirements of the Public Participation Plan. The applicant will be required to submit the public participation report 7 days prior to the Mayor and City Council meeting. CONCLUSION The proposed O&I (Office and Institutional) development is consistent with the policies and intent of the Focus Fulton 2025 Comprehensive Land Use Plan and consistent with recent Board Policy, therefore, Staff recommends that this request to rezone to O&I (Office and Institutional) be APPROVED CONDITIONAL. Further, Staff recommends APPROVAL CONDITIONAL OF U07-010, as well as APPROVAL CONDITIONAL of PARTS 1, 2 and 3 of VC07-0011. A set of Recommended Conditions are included if the Mayor and City Council chooses to approve the proposed development as submitted. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 21 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 RECOMMENDED CONDITIONS If this petition is approved by the Mayor and City Council, it should be APPROVED O&I (Office and Institutional) CONDITIONAL subject to the owner’s agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Mayor and City Council. 1) To the owner’s agreement to restrict the use of the subject property as follows: a) Office and institutional and accessory uses, at a maximum density of 7,565.79 gross floor area per acre zoned or a total gross floor area of 23,000 square feet, whichever is less, but excluding hotels. b) Limit the height of the building to no more than 70 feet, consisting of 3 stories above grade, and one story of parking below grade (U07- 010) 2) To the owner’s agreement to abide by the following: a) To the revised site plan received by the Community Development Department on November 13, 2007. Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Ordinance, all other applicable City ordinances and these conditions prior to the approval of a Land Disturbance Permit. In the event the Recommended Conditions of Zoning cause the approved site plan to be substantially different, the applicant shall be required to complete the concept review procedure prior to application for a Land Disturbance Permit. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy. 3) To the owner’s agreement to the following site development considerations: a) Reduce the side setback from 20 feet to 15 feet along the north property line. (VC07-011, Part 1) b) To allow approximately 675 square feet of pervious parking to encroach into the 50 foot stream bank buffer (VC07-011, Part 2) c) To allow approximately 5,701 square feet of pervious parking to encroach into the 75 foot impervious setback (VC07-011, Part 3). Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 22 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 d) To utilize pervious materials for all above ground parking areas, as shown on the revised site plan submitted November 13, 2007. e) The developer shall provide one (1) bicycle space or slot per every 10 parking spaces. f) All building entrances shall have a direct connection to the sidewalk network. 4) To the owner’s agreement to abide by the following requirements, dedication and improvements: a) Reserve the necessary Right of Way along the necessary property frontage of Deerfield Parkway, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide for compliance with the Transportation Master Plan and the adjacent developments, according to the definitions in the Right of Way Ordinance. The sidewalk/trail shall be located at the back of the reserved Right of Way. b) Dedicate at no cost to the City of Milton prior to the approval of a Land Disturbance Permit or Certificate of Occupancy (whichever comes first), sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to the City of Milton such additional right-of-way as may be required by the Transportation Engineer for Milton to: i. Provide at least 10.5 feet of right-of-way from the back of curb (or edge of pavement for rural areas) of all abutting road improvements, along the entire property frontage, as well as allow the necessary construction easements while the rights-of-way are being improved. ii. Overlay and striping for full width of Deerfield Parkway the length of property lines plus any additional taper lengths necessary or as approved by the Transportation Engineer for Milton. c) Motorized Inter parcel access is required on the north property line by the Transportation Engineer for Milton. d) The applicant is required to meet with and coordinate his improvements with the developer on the north side of his improvements. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 23 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 e) For office uses, a minimum of 1 car/vanpool or rideshare dedicated area for 50 spaces. For all uses, a minimum of 1 bicycle space for every 10 parking spaces with 1/3 to be covered spaces. f) Driveway entrances shall meet the Community Service Policies and AASHTO guidelines, or roads be reconstructed to meet such criteria, at the approval of the Transportation Engineer for Milton. Driveway entrances shall provide for the 95% queue with uninterrupted traffic flow onto the main line and/or a minimum throat length of one hundred feet at a maximum grade of six percent or as approved by the Transportation Engineer for Milton. g) Connection to shared driveway shown on November 13, 2007 Site plan is not acceptable as it does not meet design guidelines. i. Access to shared drive will be allowed at 95th percentile queue for the combined condition with future development or one hundred feet, which ever is greater. ii. Interparcel access at stub out on future development located approx 200’ from Deerfield Parkway shown on November 13, 2007 site plan is acceptable for shared driveway connection location. 6) To the owner’s agreement to abide by the following: a) The developer’s Professional Engineer shall demonstrate to the City by engineering analysis submitted with the LDP application, that the discharge rate and velocity of the storm water runoff resulting from the development is restricted to seventy-five percent (75%) of the pre-development conditions. b) The water quality and detention facilities shall utilize earthen embankments, where possible. Walled structures are not encouraged. If walled structures are proposed, they must meet the acceptable design standards of the Department of Community Development. c) The Developer should utilize GASWCC limited application controls. All water quality and detention facilities shall have vegetated surfaces to be regularly maintained by the owner. d) Provide a maximum 75 percent impervious, per drainage basin, at maximum build-out. e) Provide water quality and channel protection required storage volumes before discharge into creek. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 24 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 APPENDIX A Comments on Public Services and Utilities Note: Various City and/or County departments that may or may not be affected by the proposed development have provided the following information. Comments herein are based on the applicant’s conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved are required to complete the City of Milton Plan Review process prior to the commencement of any construction activity. City of Milton Fire Marshal: Fire could be affected by a heavy traffic volume that would increase, the response time to this area. Potentially, water consumption would also increase, thus putting more strain on our water distribution system. Due to the increase of vehicular and pedestrian traffic, call volume would also increase. Access around the buildings appears to be adequate at this time. City of Milton Police Department: Possible increase in traffic congestion and vehicle crashes. Hydrology Comments: A concept Stormwater meeting with the Stormwater Engineer is required. The design and layout shown with the rezoning site plan may or may not meet all minimums required by the City and GASWMM state rules. Detailed design shall be shown on the LDP plans, after said concept meeting. Staff notes that the submitted site plan states that the hydrology for this site was included in the original hydrology design for Deerfield and that Stormwater management facilities are already installed in Lake Deerfield. The hydrology will be verified and studied with the LDP plans. Transportation Facilities: Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 25 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Fulton County Health Department The Fulton County Health Department recommends that the applicant be required to connect the proposed development to public water and public sanitary sewer available to the site. Since this proposed development constitutes a premise where people work, live, or congregate, onsite sanitary facilities will be mandatory, prior to use or occupancy. This facility must comply with the Fulton County Clean Indoor Air Ordinance. This department is requiring that plans indicating the number and location of outside refuse containers along with typical details of the pad and approach area for the refuse containers be submitted for review and approval. Plats for combination of lots must be submitted to this department for review and approval. Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 26 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 27 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 28 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 29 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 30 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 Prepared by the Community Development Department for the Mayor & City Council Meeting on December 13, 2007 11/29/2007 Page 31 of 31 RZ07-019 U07-010 VC07-011 R/A Z00-025 CITY COUNCIL AGENDA ITEM TO: City Council DATE: December 5,2007 FROM: Interim City Manager AGENDA ITEM: UQ7-0061VCO7-013 -To request a Use Permit (Article 19.4.27) For a 1,890 sq. 12. existing building for a landscape business and a 3-Part Concurrent Variance to I) Reduce the 50-foot setback to 40 feet along the east property line (Article 5.1.3.D.); 2) Reduce the 50-foot buffer and 10-foot improvement setback to a 10-foot landscape strip planted to buffer standards along the east property Iine (Article 12.H.C.I) and 3) Reduce the 50-foot buffer and 10-foot improvement setback to a 15 foot landscape strip planted to buffer standards along the south property Iine. (Article 12.H.C.1) MEETING DATE: Thursday, December 13,2007Regular Meeting BACKGROUND INFORMATION: (Attach additional pages if necessary) See attached memorandum APPROVAL BY ClTY MANAGER: APPROVED (1 NOT APPROVED ClTY ATTORNEY APPROVAL REQUIRED: () YES NO ClTY ATTORNEY REVIEW REQUIRED: (J YES )(NO APPROVAL BY CITY ATTORNEY 1)APPROVED (1 NOT APPROVED PLACED ON AGENDA FOR: 1% \3 2007 REMARKS: PETITION NUMBER(S): U07-006 VC07-013 PROJECT NAME JVS Landscaping & Lawn Care, Inc. PROPERTY INFORMATION ADDRESS 14972 Hopewell Road DISTRICT, LAND LOT 2/2, 618/619 OVERLAY DISTRICT Northwest Fulton Overlay EXISTING ZONING AG-1 (Agricultural) PROPOSED ZONING N/A ACRES 2.52 Acres EXISTING USE Single Family Residence PROPOSED USE Landscaping Business (Article 19.4.27) OWNER Michael L. Crifasi ADDRESS 270 Bruton Way, Atlanta, GA 30342 PETITIONER/REPRESENTATIVE Jeff Ver Steegh ADDRESS 785 Stratforde Drive Alpharetta, GA 30004 PHONE (404) 483-2494 INTENT To request a Use Permit for a landscaping business operation, to use an existing “Quonset” garage (42’ x 45’) towards the rear of the subject property for the storage of equipment and landscaping trucks at an overall density of 750 square feet per acre. Additionally, the applicant requests a three part concurrent variance; Part 1: To reduce the 50’ setback along the eastern property line to a 40’ setback (Article 19.4.27.B.3). Part 2: To reduce the 50’ buffer and 10’ improvement setback to a 10’ buffer along the eastern property line (Article 12 H. 3.1.C.1). Part 3: To reduce the 50’ buffer and 10’ improvement setback along the southern property line to a 15’ buffer (Article 12H.3.1.C.1) Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 1 of 20 UP07-006/VC07-013 COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION U07-006 – Approval Conditional VC07-013 Part 1 – Approval Conditional VC07-013 Parts 2 & 3 – Denial CITY OF MILTON PLANNING COMMISSION MEETING U07-006 – Denial VC07-013 Parts 1-3 – Denial 6-1 Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 2 of 20 UP07-006/VC07-013 LOCATION MAP Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 3 of 20 UP07-006/VC07-013 CURRENT ZONING MAP Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 4 of 20 UP07-006/VC07-013 SITE PLAN – September 18, 2007 Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 5 of 20 UP07-006/VC07-013 SUBJECT SITE – PHOTO Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 6 of 20 UP07-006/VC07-013 SUBJECT SITE - PHOTO SUBJECT SITE: The subject site is a 2.52 acre tract of agriculturally zoned land, located on the western side of Hopewell Road. The subject site was a fairly recently subdivided parcel of land with a 42’ x 45’ “Quonset” garage located on the subject property. The plan is to eventually build a residential use on the property, though no definitive timeframe has been established for this particular development activity. It is located within the Agricultural, Forestry and Mining Land Use designation on the Focus Fulton 2025 Comprehensive Land Use Plan. Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 7 of 20 UP07-006/VC07-013 Existing uses and zoning of nearby property (See Map following table) Location Parcel / Zoning Petition Zoning / Name Approved Density/Min. Heated Floor Area East 1 AG-1 (Agricultural) Champions View S/D 1 unit/acre 3,000 sq.ft. East 2 AG-1 (Agricultural) Scattered Single Family Homes 1 unit/acre 2,500 sq.ft. South 3 AG-1 (Agricultural) Scattered Single Family Homes 1 unit/acre 2,500 sq.ft. West 4 AG-1 (Agricultural) Stratford Estates at Hopewell 1 unit/acre 3,000 sq.ft. North 5 AG-1 (Agricultural) Northfield S/D 1 unit/acre 3,000 sq.ft. Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 8 of 20 UP07-006/VC07-013 EXISTING USES AND ZONING MAP Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 9 of 20 UP07-006/VC07-013 Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 10 of 20 UP07-006/VC07-013 In the interest of the public health, safety and welfare, the Mayor and City Council may exercise limited discretion in evaluating the site proposed for a use that requires a Use Permit. In exercising such discretion pertaining to the subject use, the Mayor and City Council shall consider each of the following as outlined in Article 19.2.4 of the Zoning Ordinance; Use Permit Considerations. Staff has reviewed said items pertaining to the subject use, and, offers the following comments: A. Whether the proposed use is consistent with the land use or economic development plans adopted by the Mayor and City Council: Provided the applicant complies with the Recommended Conditions of this petition and the Use Permit requirements of Article 19.4.27. of the Zoning Ordinance, the proposed development is consistent with the intent and following policies of the Comprehensive Plan: • Encourage compatible institutional uses in neighborhoods and communities. • Encourage development consistent with the surrounding scale, transition of densities and uses, and Comprehensive Plan policies, where appropriate. B. Compatibility with land uses and zoning districts in the vicinity of the property for which the use permit is proposed; If developed in accordance with Staff’s Recommended Conditions and the provisions of the Zoning Ordinance, the proposed landscaping business is expected to be compatible with other land uses in the surrounding area. C. Whether the proposed use may violate local, state and/or federal statutes, ordinances or regulations governing land development; The proposed use does not violate any known local, state and/or federal statutes, ordinances or regulations governing land development. However, Staff has observed construction debris (curbing, concrete, etc) on the site. Per the Georgia Environmental Protection Division, is considered an inert landfill. The applicant has stated that it will be used to “fill” an area that will be the base for his driveway. D. The effect of the proposed use on traffic flow, vehicular and pedestrian, along adjoining streets; The proposed use will not generate a significant increase in traffic. Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 11 of 20 UP07-006/VC07-013 E. The location and number of off-street parking spaces; Article 18.2.1 requires the applicant to provide a minimum of 5 parking spaces for the proposed development. Article 19.4.10 requires the applicant to locate parking outside of the minimum 60-foot front yard building setback. The applicant’s site plan indicates 3 parking spaces which do not meet the requirements set out by Article 18.2.1 and is located outside the 60-foot front yard building setback. It appears that there is sufficient room to locate 2 additional parking spaces. F. The amount and location of open space; The applicant’s site plan indicates that approximately two-thirds of the subject site is undeveloped. Staff is of the opinion that the proposed development will provide adequate open space for the proposed development. G. Protective screening; If developed in accordance with the requirements of the Zoning Ordinance and the Northwest Fulton Overlay District, the buffer and landscape strip requirements and the existing screening around the structures will provide adequate screening for the proposed development. H. Hours and manner of operation; The applicant indicates the landscaping business activities relate simply to the storage of two landscaping trucks and associated equipment within the existing Quonset garage location. The applicant indicates two landscaping trucks will leave the site around 8:00 AM and return to the property approximately at 5:00 PM. Minimal disturbance will occur related to operational activities associated with the proposed use permit. A total of two crews with two employees per crew are currently employed for the operation with no plans for occupational expansion. I. Outdoor lighting; At the time of Land Disturbance Permit the site shall be in compliance with Article 12H.3.4 of the Northwest Fulton Overlay District regarding outdoor lighting. Staff notes that the subject site’s required buffers, and existing screening, will help mitigate the impact of lights on the adjacent properties. J. Ingress and egress to the property. Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 12 of 20 UP07-006/VC07-013 The applicant’s site plan indicates one curb cut on Hopewell Road. Staff notes that the curb cut currently exists and that the applicant is not requesting any additional curb cuts. Given the limited use of the subject site, Staff is of the opinion that the proposed development will have limited impact upon the traveling public. SITE PLAN ANALYSIS Based on the applicant’s site plan submitted to the Community Development Department on September 18, 2007, Staff offers the following considerations: Northwest Overlay District BUILDING SETBACKS The AG-1 (Agricultural) district requires the following building setbacks: Front - 60 feet along Hopewell Road Sides – 25 feet along the south and north property lines Rear – 50 feet along the west property line The existing garage is in compliance with the district setback standards. The Use Permit for a landscaping business requires all use areas/structures other than parking and pedestrian walkways should be located a least 50 feet from adjacent AG-1 or residential zoning districts. Along the eastern property line labeled “L6” the garage encroaches into the 50 foot setback. The applicant is requesting a concurrent variance to allow this encroachment. It is Staff’s opinion that because of the configuration of the lot and that based on the minor subdivision plat that this line is recognized as a minimum 25-foot side building setback, that Part 1 of VC07-013 should be APPROVED. BUILDING HEIGHT Article 12H.3.5 Section D.1 of the Northwest Overlay District requires a maximum height limit of two stories with the maximum height 30 feet from average-finished grade to the bottom of the roof eave. The applicant’s letter of intent indicates only a garage will be in located on the property related to the use permit request where its 15’ vertical height will not jeopardize the Overlay District requirement standards. LANDSCAPE STRIPS AND BUFFERS Article 12H.3.1 Section C.1 of the Northwest Overlay District requires a fifty (50) foot-wide undisturbed buffer, with a 10’ improvement setback, shall be located Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 13 of 20 UP07-006/VC07-013 adjacent to all AG-1 zoning districts and all property zoned, used, or developed for residential uses. The applicant is requesting a reduction from a 50-foot buffer and 10-foot improvement setback to a 10-foot buffer along the eastern property line. Secondly, the applicant is requesting a reduction of the 50-foot buffer and 10-foot improvement setback to a 15 foot buffer along the south property line. Staff recommends maintaining a 50 foot buffer along the southern property line adjacent to the Quonset garage and removing the existing boulders place near the property line to help ensure new plant material growth and stability. The entrance driveway into the development should be reconfigured to provide ingress/egress access into the garage via the northern side of the garage area. It is Staff’s opinion that the proposed reductions would have a negative impact on adjacent property owners and would not provide adequate protection. Therefore, Staff recommends DENIAL of Parts 2 & 3 of VC07-013. In light of the presence of significant concrete rubble and large stone material on the northern portion of the subject property, the property is classified as an inert landfill under Georgia EPD guidelines, where a 100’ landscaping buffer shall be provided along the northern and western property lines. PARKING REQUIREMENTS The following chart illustrates the parking required by Article 18 of the City of Milton Zoning Ordinance for the proposed use: Proposed Use Minimum Requirement Spaces Provided • Landscaping Business • 3 spaces per 1,000 sq. ft. of • 0 spaces (1,890 sq. ft.) building area. (5 spaces) Total 5 spaces required 0 spaces provided Staff notes that the applicant had not shown any parking spaces. It appears that there is adequate area to provide the required five (5) parking spaces required per Article 18 of the City of Milton Zoning Ordinance. It also appears that the site plan can meet the layout requirements of Article 12H.3.1 Section B. PUBLIC INVOLVEMENT On October 24th, 2007 the applicant was present at the Community Zoning Information Meeting held at the Milton City Hall. There was no one in attendance from the community voicing concern about the use proposal requested. The applicants presented their plan to the Milton Design Review Board on November 6th, 2007. Public Comments – Staff has received two phone calls from adjacent property owners in opposition to the landscaping business. At the Planning Commission meeting there were approximately three people in support of the petition and Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 14 of 20 UP07-006/VC07-013 five people who were in opposition to the request. The applicant will be meeting with these neighbors to try to resolve any issues they have with the petition prior to the City Council meeting. City of Milton Design Review Board Meeting – November 6, 2007 The following recommendations were made by the DRB: • Point 1 – The Milton Design Review Road indicated their charge of looking at aesthetic design options in courtesy reviews did not apply related to the existing garage being on the site. City Arborist Structure is located about 70 feet from the south property line. Cut has occurred up to the 25 foot point. There is a 25-foot existing vegetated buffer remaining with large boulders at the edge working as a retaining wall. Between the boulders and the building is gravel parking. No trees or shrubs can be planted in this area without removing the parking. The north property line was not located by observing a rear property fence; it appears the applicant has cleared up to the property line in this area. No specimen trees were located at this site. Public Notice Requirements The use permit petition was advertised in the Milton Herald on November 21, 2007 and the sign was installed before the required date of November 7, 2007 along the frontage of Hopewell Road. The notice of rezoning was sent, to adjacent property owners, on November 10, 2007. Public Participation Plan and Report The applicant has met the requirements of the Public Participation Plan. The applicant will be required to submit the public participation report 7 days prior to the Mayor and City Council meeting. CONCLUSION The proposed landscaping business is consistent with Council and Plan Policies and compatible with the surrounding area, if developed in accordance with the requirements of the Zoning Ordinance and Staff’s Recommended Conditions. Therefore, Staff recommends APPROVAL CONDITIONAL of the proposed Use Permit for a landscaping business and APPROVAL CONDITIONAL to Part 1 of VC07-013 to reduce the 50 foot setback to 40 feet. Staff recommends DENIAL of Parts 2 & 3 of VC07-013 since the proposed reductions in buffers would not provide adequate protection for adjacent properties to the east and the south. Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 15 of 20 UP07-006/VC07-013 Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 16 of 20 UP07-006/VC07-013 RECOMMENDED CONDITIONS If this petition is approved by the Mayor and City Council, it should be approved USE PERMIT for a landscaping business (Article 19.4.27.) CONDITIONAL subject to the owner’s agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Mayor and City Council. 1) To the owner’s agreement to restrict the use of the subject property as follows: a) The landscaping business activities to be confined within the existing garage structure. No modifications will be made to the exterior of the structure other than general maintenance activities. b) Total square footage of all structures on the subject property shall not exceed 1,890 gross square feet, or a density of 750 square feet per acre. 2) To the owner’s agreement to abide by the following: a) To the site plan received by the Milton Community Development Department on September 18, 2007. Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Ordinance and these conditions prior to the approval of a Land Disturbance Permit or Certificate of Occupancy, whichever comes first. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy. 3) To the owner’s agreement to the following site development considerations: a) Reduce the 50’ setback along the eastern property line to a 40’ setback to the extent necessary to allow the existing structure to comply (Part 1 VC07-013). 4) To the owner’s agreement to abide by the following requirements, dedication and improvements: a) No more than one (1) exit/entrance on Hopewell Road. Curb cut location and alignment are subject to the approval of the Milton Traffic Engineer. Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 17 of 20 UP07-006/VC07-013 b) Reserve Right-of-Way necessary along the following roadways, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide for compliance with the Transportation Master Plan and the adjacent developments, according to the definitions in the newly established Right-of-Way Ordinance. c) Dedicate at no cost to the City of Milton prior to the approval of a Land Disturbance Permit or Certificate of Occupancy (whichever comes first), sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to the City of Milton such additional right-or-way as may be required to: (i) Provide at least 10.5 feet of right-of-way from the back of curb/edge of pavement of all abutting road improvements, along the entire property frontage, as well as allow the necessary construction easements while the rights-of-way are being improved. d) Driveway entrances and roads shall meet the Public Works Department Policies and AASHTO guidelines. 5) To the owner’s agreement to abide by the following: a) The developer’s Professional Engineer shall demonstrate to the City by engineering analysis submitted with the LDP application (should greater than 5000 square feet be disturbed), that the discharge rate and velocity of the storm water runoff resulting from the development is restricted to seventy-five percent (75%) of the pre- development conditions. Locations shall be as approved by the Stormwater Engineer. b) The proposed development shall utilize vegetative measures for water quality. Individual Land Disturbance Permits/Building Permits are strongly encouraged to utilize GASWCC limited application controls such as infiltration trenches, porous surfaces, rain gardens, etc. A maintenance agreement is required to be recorded for such item used. c) Septic tank to be pumped out prior to Certificate of Occupancy. d) Exterior bulk storage areas shall be protected from erosion and detailed on the Building Permit/Land Disturbance Plan. Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 18 of 20 UP07-006/VC07-013 APPENDIX A Comments on Public Services and Utilities Note: Various City and/or County departments that may or may not be affected by the proposed development provide the following information. Comments herein are based on the applicant’s conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved are required to complete the City of Milton Plan Review process prior to the commencement of any construction activity. Transportation: Road name: Hopewell Road Classification: Arterial Comments: • City to verify sight distance from proposed entrance/exit at Hopewell Road for safety and if deemed necessary provide a third-party verification. Sight Distance would be certification by a Professional Engineer in a third-party orientation. Drainage: Disturbed Area: less than 5,000 square feet Impervious Area: less than 5,000 square feet Hydrology: Comments: • Vegetative water quality items needed. • A concept Stormwater meeting with the Stormwater Engineer is required. The design and layout shown with the rezoning site plan may or may not meet all minimums required by the City and GASWMM state rules. Detailed design shall be shown on the Land Disturbance Permit plans, after said concept meeting. Staff notes that the submitted site plan shows likely inadequate detention area locations. City of Milton Fire Marshal: Comments: • May need to provide approved fire department access road to garage and acceptable turn-around location. Fulton County Health Department This department recommends that the applicant be required to connect the proposed development to public water available to the site. Due to the inaccessibility of public sewer to serve the proposed development, this department recommends that individual onsite sewage management systems be utilized. However, the “Design Limits for Conventional or Chamber Septic Tank Systems” for County Health Departments as defined by Georgia Department Natural Resources (DNR) are limited by size and subsurface introduction of effluents. Onsite sewage management systems having a septic tank capacity of greater than ten thousand (10,000) gallons, or where the total length of absorption trenches required, would exceed three thousand (3000) linear feet, or where the Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 19 of 20 UP07-006/VC07-013 total absorption trench bottom area required would exceed nine thousand (9000) square feet, will be governed by and placed under the statutory authority and jurisdiction of the Department of Natural Resources. Since this proposed development constitutes a premise where people work, live, or congregate, onsite sanitary facilities will be mandatory, prior to use or occupancy. Since this development would utilize an onsite sewage management system, the owner must obtain approval from this department prior to issuance of a building permit and before building construction or renovation. This facility must comply with the Fulton County Clean Indoor Air Ordinance. Although this proposed development is recommended to utilize individual onsite sewage management system, this department requires a permit to construct the system and complete soil percolation data, determined acceptable by the Health Department prior to installation. Although this proposed development is recommended to utilize an individual onsite sewage management system, this department requires a permit to construct the system and complete soil and percolation data, determined acceptable by the Health Department prior to issuance of a building permit. This department is requiring that plans indicating the number and location of outside refuse containers along with typical details of the pad and approach area for the refuse containers be submitted for review and approval. Prepared by the Community Development Department for the Mayor & City Council Meeting December 13, 2007 12/6/2007 Page 20 of 20 UP07-006/VC07-013 A/" City of Milton 13000 Deerfield Parkway, Suite 107, Milton,Georgia 30004 ClN COUNCIL AGENDA ITEM TO: City Council DATE: December 5,2007 FROM: Interim City Manager AGENDA ITEM: ZM07-007 -To modify Condition 3.a. (032-159) to reduce the perimeter building setback along the north property Iine for Lot 33, Phase 4 -Unit 1 of Triple Crown Subdivision from 50 feet to 36 feet. MEETING DATE: Thursday, December 13,2007 Regular Meeting BACKGROUND INFORMATION: (Attach addftional pages if necessary) See attached memorandum APPROVAL BY CITY MANAGER: () NOT APPROVEDKAPPROVED CITY ATTORNEY APPROVAL REQUIRED: () YES HNO CI N ArrORNEY REVIEW REQUIRED: (I YES RNO APPROVAL BY CITYATTORNEY ()APPROVED () NOT APPROVED PLACED ON AGENDA FOR: \Z 13 2007 REMARKS: PETITION NUMBER(S): ZM07-007 PROPERTY INFORMATION ADDRESS 508 AFFIRMED LANE DISTRICT, LAND LOT 2/2, 739,773,774 OVERLAY DISTRICT NORTHWEST FULTON EXISTING ZONING CUP(COMMUNITY UNIT PLAN) 2003Z-159 EXISTING USE SINGLE FAMILY RESIDENTIAL PETITIONER David Neal ADDRESS 2925 Leeds Garden Lane PHONE 770.569.2217 APPLICANT’S REQUEST: To modify condition 3.a. of 03Z-159, to reduce the perimeter building setback along the north property line from 50 feet to 36 feet, for Lot 33, Phase 4, Unit 1, of Triple Crown subdivision. COMMUNITY DEVELOPMENT DEPARTMENT RECOMMENDATION APPROVAL CONDITIONAL Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 1 of 10 ZM07-007 Condition to be Modified: 2003Z-159 3. To the owner’s agreement to the following site development considerations: a. Minimum Development standards: Lot width—90 feet; Lot frontage—35 feet; Front yard—30 feet; Side yard—10 feet; Side yard corner—20 feet; Rear yard—50 feet; Perimeter Building Setback—50 feet. Analysis and Recommendation: The subject site is developed with as a single family subdivision. It was rezoned from AG-1 to CUP, pursuant to 2003Z-0159 and 2001Z-0060, for a maximum density of .60 dwelling units per acre zoned. The subject lot, Lot 33 is located on the perimeter of the subdivision, therefore requiring a 50 perimeter setback. The applicant states that the encroachment was discovered when the owners, Philip and Ann Morris, requested a survey for closing. He believes that stake was accidentally moved during the construction of the foundation. Mr. Neal states that the only alternative to the approval of this modification is to repurchase the house from the current owners, tear it down, and rebuild it. The cost would most likely cause his business to fail. Staff is of the opinion that the reduction of the perimeter setback for this lot from 50 feet to 36 feet would be consistent with the intent of the overall plan for the subdivision. Staff is of the opinion that the proposed modification would have minimal adverse affect on the adjacent properties, if the additional 25 foot landscape strip planted to buffer standards is required. Therefore, Staff recommends APPROVAL CONDITIONAL of the proposed modification. Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 2 of 10 ZM07-007 CONCLUSION: Should the Mayor and City of Council approve this petition, the Recommended Conditions (2003Z-0159) should be revised to read as follows: 3. To the owners agreement to the following site development considerations: a. Minimum Development standards: Lot width—90 feet; Lot frontage—35 feet; Front yard—30 feet; Side yard—10 feet; Side yard corner—20 feet; Rear yard—50 feet; Perimeter Building Setback—50 feet; Perimeter building setback for Lot 33, Phase 4, Unit 1—36 feet. e. On Lot 33, Phase 4, Unit 1, provide a 25 foot landscape strip, planted to buffer standards along the north (perimeter) property line, adjacent to Sycamore Farms, from the line marking the beginning of Land Lot 773 and continuing for approximately 200 feet. Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 3 of 10 ZM07-007 ZM07-007 LOCATION MAP Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 4 of 10 ZM07-007 Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 5 of 10 ZM07-007 Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 6 of 10 ZM07-007 Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 7 of 10 ZM07-007 Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 8 of 10 ZM07-007 Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 9 of 10 ZM07-007 Prepared by the Community Development Department for the Mayor and City Council Meeting on December 13, 2007 11/29/2007 Page 10 of 10 ZM07-007 A City of Milton t3000 Deerfield Parkway, Suite 107, Milton. Georgia 30004 ClTY COUNCIL AGENDA ITEM TO: City Council DATE: December 5, 2007 FROM: Interim City Manager AGENDA ITEM: Consideration and approval of the January 2008 Meeting and Work Session Schedule (January 10,2008 -Regular Meeting, January 17,2008 -Work Session, and January 24,2008 -Regular Meeting). MEETING DATE: Thursday, December 13,2007 Regular Meeting BACKGROUND INFORMA TION: (Attach additional pages ~fnecessary) See attached memorandum APPROVAL BY CITY MANAGER: () APPROVED (,I NOT APPROVED CITY ATTORNEY APPROVAL REQUIRED: I I YES (1 NO CITY ATTORNEY REViEW REQUIRED: 13 YES (1 No APPROVAL BY CITY ATTORNEY ()APPROVED I) NOT APPROVED PLACED CTN AGENDA FOR: REMARKS: City of Milton 13000 Deerfield Parkway, Suite 107A, Milton, Georgia 30004 To:Honorable Mayor and City Council Members From: Jeanette Marchiafava, City Clerk and Clerk of the Court Date:December 3, 2007 for Submission onto the December 13, 2007 Regular City Council Meeting Agenda Item: Consideration and approval of the January 2008 Meeting and Work Session Schedule (January 10, 2008 - Regular Meeting, January 17,2008 -Work Session, and January 24, 2008 – Regular Meeting). CMO (City Manager’s Office) Recommendation: Approve the Meeting Schedule for January 2008. (January 10, 2008 Regular Meeting, January 17, 2008 Work Session and January 24, 2008 Regular Meeting) Background: The City of Milton is committed to conducting City business in a manner that complies with all legal requirements, fosters citizen confidence in City government, and promotes efficient and effective government operations. As a part of our open and transparent government process, the Mayor and City Council will adopt a yearly meeting schedule in January 2008. Discussion: The goal of any meeting schedule is to provide advance notice to the elected officials, staff, and the public of when formal business will be conducted by the municipality. Alternatives: N/A Concurrent Review: Chris Lagerbloom, Interim City Manager Page 1 of 1 --- A City of Milton 13000 Deefield Parkway, Suile 107, Milton, Georgia 30004 d?s\ CITY COUNCIL AGENDA ITEM TO: City Council DATE: December 5,2007 FROM: Interim City Manager AGENDA ITEM: Approval of a Resolution of the Mayor and Council, of the City of Milton, Georgia authorizing solicitation of Tax Anticipation Note Financing. MEETING DATE: Thursday, December 13,2007Regular Meeting BACKGROUND INFORMA TION: (Attach addittonal pages if necessary) See attached memorandum APPROVAL BY CITY MANAGER: () APPROVED () NOT APPROVED CiTY ATTORNEY APPROVAL REQUIRED: I I YES 0NO CITY ATTORNEY REVSEW REQUIRED: I) YES 0 NO APPROVAL BY CITY ATTORNEY ()APPROVED (1 NOTAPPROVED PLACED ON AGENDA FOR: REMARKS: City of Milton 13000 Deerfield Parkway Suite 107G Milton, Georgia 30004 1 To: Honorable Mayor and City Council Members From: Stacey Inglis Date: Submitted on December 6 for December 13, 2007 City Council Meeting Agenda Item: Approval of Resolution Authorizing Solicitation of Tax Anticipation Note Financing CMO (City Manager’s Office) Recommendation: Approve the resolution authorizing solicitation of tax anticipation note financing. Background: A tax anticipation note (TAN) is a short-term borrowing tool allowing the issuing government to borrow against anticipated property tax revenue. It is typically used in the event of a cash flow need to fund operations in the months preceding the collection of property taxes. According to Article IX, Section V, Paragraph V of the Georgia Constitution, the aggregate amount of short-term loans shall not exceed 75% of total gross income from taxes collected in the last preceding year. As of December 6, 2007, the total amount of taxes collected for 2007 is $7,712,063; therefore, the maximum amount the City can borrow is $5,784,047. Discussion: The City has partnered with Troutman Sanders to facilitate the TAN process. Upon council approval, they will begin soliciting bids from financial institutions on the interest rate through a Request for Quote. The responses will be presented in January at one of the two regularly scheduled meetings. The current TAN issued in January 2007 for $5,155,000 has an interest rate of 3.84%. Staff is anticipating quotes of lower interest rates for the 2008 TAN. Alternatives: None identified. Concurrent Review: Chris Lagerbloom, Interim City Manager Tami Hanlin, Operations Director STATE OF GEORGIA COUNTY OF FULTON RESOLUTION NO. RESOLUTION OF THE MAYOR AND COUNCIL OF THE CITY OF MILTON, GEORGIA AUTHORIZING SOLICITATION OF TAX ANTICIPATION NOTE FINANCING WHEREAS, the City of Milton, Georgia (the “City”) has been duly created and is validly existing as a municipal corporation of the State of Georgia; and WHEREAS, the Mayor and Council of the City are charged with the duties of contracting debts and managing the affairs of the City (the “Governing Body”); and WHEREAS, the City is authorized by Article IX, Section V, Paragraph V of the Constitution of the State of Georgia and Section 36-80-2 of the Official Code of Georgia Annotated, to incur a temporary loan in order to pay current expenses during any calendar year; and WHEREAS, the Governing Body has determined that it is in the best interest of the City to incur a temporary loan in order to pay current expenses for calendar year 2008 in anticipation of the receipt of taxes levied or to be levied for its general fund (the “General Fund”); and WHEREAS, the City proposes to issue its Tax Anticipation Notes in the aggregate principal amount not to exceed $5,784,047 (“TANS” or “Notes”) to pay the current expenses of the City; and WHEREAS, the City proposes to authorize the Mayor, the City Manager and certain professionals to solicit bids or requests for the TAN and to make recommendations on their findings to the Governing Body; NOW, THEREFORE, BE IT RESOLVED by the Governing Body of the City and it is hereby resolved by authority of the same, as follows: Section 1. Findings. The Governing Body hereby finds and determines the following: (a) the aggregate principal amount of the TANS to be authorized will not exceed 75% of the total gross income from taxes which have been collected by the City in calendar year 2007; (b) the TANS to be authorized shall be paid in full on or before December 31, 2008; (c) no temporary loan or other contract, note, warrant or other obligation for current expenses incurred in calendar year 2007 or any prior calendar year will be unpaid as of the end of calendar year 2007; (d) the City to date has made no other temporary loans or other contracts, notes, warrants or obligations for current expenses; (e) the aggregate principal amount of the TANS to be authorized, together with other contracts, notes, warrants or obligations of the City to be incurred for expenses in calendar year 2008, will not exceed the total anticipated tax revenues of the City for calendar year 2008; (e) the money authorized to be borrowed will become part of the general revenues of the City and deposited into the General Fund; and (f) a need exists for the City to borrow no more than $5,784,047 to pay current expenses of the City in calendar year 2008 prior to the receipt of sufficient revenues from taxes levied or to be levied for 2008. Section 2. Bids. The City Manager or City Administrator is hereby delegated the authority to establish a bid process to obtain the TANS. Such bid process may be solicitation of bids or requests or such other process in accordance to City polices and procedures. Such solicitation or other process may be conducted in one request or by several requests as determined to be in the best interests of the City by the City Manager or City Administrator. The City Manager or City Administrator will present his/her findings and make recommendations on any actions or approvals needed by the Governing Body for the TANS. Section 3. Bond Counsel. In connection with the purchase or leasing of the Equipment, the law firm of Troutman Sanders LLP is hereby designated as bond counsel for the provision of any legal opinions required by a lender regarding the exemption from gross income for any interest component under the TANS. Section 4. General Authority. From and after the date of adoption of this resolution, the Mayor and the officers of the City are hereby authorized to do such acts and things, and to execute and deliver all such certificates or agreements as may be necessary or desirable in connection with the TANS. All actions of the Governing Body, officers or agents of the City taken in connection therewith prior to the date hereof are hereby ratified and confirmed. Section 5. Effective Date. This resolution shall be in full force and effect immediately upon its adoption, and any and all resolutions or parts of resolutions in conflict with this resolution shall be, and they are, to the extent of such conflict, hereby repealed. Adopted and approved by the Governing Body of the City on December 13, 2007. CITY OF MILTON, GEORGIA (SEAL) By:_______________________________ Mayor Attest: ______________________________ Clerk 2