Loading...
HomeMy WebLinkAboutRESOLUTION NO 07-04-37STATE OF GEORGIA COUNTY OF FULTON RESOLUTION NO. 07-04.37 A RESOLUTION OF INTENT FOR THE CITY OF MILTON TO PARTICIPATE IN THE NATIONAL FLOOD INSURANCE PROGRAM BE IT RESOLVED by the City Council of the City of Milton, GA while in a Regular Meeting on April 19, 2007 at 7.00 p.m. as follows: WHEREAS, certain areas of The City of Milton are subject to periodic flooding, or flood -related erosion, causing serious damage to properties within these areas; and WHEREAS, relief is available in the form of Federally subsidized flood insurance as authorized by the National Flood Insurance Act of 1968; and WHEREAS, it is the intent of this City Council to require the recognition and evaluation of flood, or flood -related erosion hazards in all official actions relating to the land use in areas having these hazards; and WHEREAS, this body has the legal authority to adopt land use, and control measures to reduce future flood losses pursuant to Article IX, Section II of the Constitution of the State of Georgia. NOW, THEREFORE, BE IT RESOLVED that this City Council hereby: Assures the Federal Insurance Administration that it will enact as necessary, and maintain in force in those areas having flood, or flood -related erosion hazards, adequate land use and control measures with effective enforcement provisions consistent with the Criteria set forth in Part 60 of the National Flood Insurance Program Regulations (CFIR44); and Vests Community Development, with supervision of the City Engineer and/or Surveyor, with the responsibility, authority, and means to: a. Assist the Administrator, at his request, in his delineation of the limits of the area having special flood, or flood -related erosion hazards. b. Provide such information as the Administrator may request concerning present uses and occupancy of the floodplain, or flood -related erosion areas. c. Cooperate with Federal, State, and local agencies and private firms which undertake to study, survey, map, and identify floodplain, or flood -related erosion areas and cooperate with neighboring communities with respect to management of adjoining floodplain, and/or flood -related erosion areas in order to prevent aggravation of existing hazards. d. Upon occurrence, notify the Administrator in writing whenever the boundaries of the Community have been modified by annexation or the community has otherwise assumed or no longer has authority to adopt and enforce floodplain management regulations for a particular area. In order that all Flood Hazard Boundary Map and Flood Insurance Rate Map accurately represent the community's boundaries, include within such notification a copy of a map of the community suitable for reproduction, clearly delineating the new corporate Iimits or new area for which the community has assumed or relinquished floodplain management regulatory authority. Appoints Community Development to maintain for public inspection and to furnish upon request for the determination of applicable flood insurance risk premium rates within aII areas having special flood hazards identified on a Flood Hazard Boundary Map or Flood Insurance Rate Map, any certificates of flood -proofing, and information on the elevation (in relation to mean sea level) of the level of the lowest floor (including basement) of all new or substantially improved structures, and includes whether or not such structures include a basement, and if the structure has been flood -proofed; and Agrees to take such other official actions, as may be reasonably necessary to carry out the objectives of the program. That this Resolution shall become effective upon its adoption; That resolutions in conflict with this resolution are hereby repealed. RESOLVED this the 191h day of April, 2007 Attest: feartette R. Marchiafava, City Clerk (Seal) Approved: Joe Lock od, Mayor f