HomeMy WebLinkAboutRESOLUTION NO. 10-01-138STATE OF GEORGIA
COUNTY OF FULTON
RESOLUTION NO.10-01-138
A RESOLUTION FOR CONSIDERATION OF PROJECTS TO BE SUBMITTED FOR
THE USE OF MARTA CAPITAL RESERVE FUNDING
WHEREAS, MARTA was authorized the use of $25 million in funds provided under the
American Recovery and Reinvestment Act to offset an operating budget deficit in FY2010; and,
WHEREAS, the use of these funds for preventative maintenance activities reduced the amount
of funding that could be allocated to other projects within the Transportation Improvement
Program throughout the region; and,
WHEREAS, MARTA has, in exchange for the use of the operating funds, made available an
estimated $6.25 million MARTA capital funds for North Fulton County to be used for projects or
project elements that are designed to enhance mass transportation service or use and are
physically or functionally related to transit facilities; and,
WHEREAS, The City of Milton has been allocated approximately $625,000 under this program
for the use on qualifying projects within 1/2 mile of the transit routes within the city limits;
THEREFORE, BE IT RESOLVED, by the Mayor and City Council of the City of Milton,
GA
while in regular session on the 20th day of January 2010 at 6:00 p.m. that staff is hereby
authorized to pursue funding under this program based on the attached list of projects identified
as "Attachment A".
SO RESOLVED, ON THIS 20TH DAY OF JANUARY, 2010.
Attest:
r
Sudie Gordon, Interim C ty Clerk
(Seal)
�l
Joe Lockwood, Mayor
ATTACHMENT A
Total Projects $1,650,000
MARTA Offset Funds $625,000
MARTA Offset Funds shall not exceed the amount allocated to City of Milton
PE - Preliminary Engineering
CST - Construction
Project Title
Phase
Funds
Comments
Filling in gaps within 1/2 mi of routes on
Project ID
PE
$100,000
Cogburn Rd, Webb Rd, Deerfield Pkwy,
MLT
Sidewalks connecting to
Routes 143 and 185
CST
$550,000
Morris Rd, Bethany Rd
-01
ADA Upgrades on
PE
$10,000
Countdown ped signals, audible signals,
push buttons, ramps, refuge islands, ADA
CST
$90,000
MLT -02
connections to and along
Routes 143 and 185
upgrades within 1/2 mi of routes
MARTA funds for within 1/2 mi of Route
143 approx limits Webb Rd to Avensong
Deerfield Pkwy Street
Way ($140,000), remainder from
Lighting (Routes 143 and
Avensong Way to SR 9 using other
MLT -03
185)
Gateway signage and
CST
$200,000
funding source ($60,000)
streetscape along or
connecting to Routes 143 and
Gateway signage and streetscape along or
MLT -04
185
Bus Shelters on Routes 143
CST
$100,000
within 1/2 mi of routes
MLT -05
and 185
or
CST
$100,000
$15,000430,000 each
Land acquisition for parks within 1/2 mile
MLT -06
Acquisition for parks along
near Routes 143 and 185
Pavement repair and
CST
$250,000
of Routes 143 and 185
Pavement improvements (repair,
resurfacing on Routes 143
resurfacing) on bus routes 143 and 185
MLT -07
and 185
CST
$250,000
Total Projects $1,650,000
MARTA Offset Funds $625,000
MARTA Offset Funds shall not exceed the amount allocated to City of Milton
PE - Preliminary Engineering
CST - Construction