Loading...
HomeMy WebLinkAboutRESOLUTION NO. 10-01-138STATE OF GEORGIA COUNTY OF FULTON RESOLUTION NO.10-01-138 A RESOLUTION FOR CONSIDERATION OF PROJECTS TO BE SUBMITTED FOR THE USE OF MARTA CAPITAL RESERVE FUNDING WHEREAS, MARTA was authorized the use of $25 million in funds provided under the American Recovery and Reinvestment Act to offset an operating budget deficit in FY2010; and, WHEREAS, the use of these funds for preventative maintenance activities reduced the amount of funding that could be allocated to other projects within the Transportation Improvement Program throughout the region; and, WHEREAS, MARTA has, in exchange for the use of the operating funds, made available an estimated $6.25 million MARTA capital funds for North Fulton County to be used for projects or project elements that are designed to enhance mass transportation service or use and are physically or functionally related to transit facilities; and, WHEREAS, The City of Milton has been allocated approximately $625,000 under this program for the use on qualifying projects within 1/2 mile of the transit routes within the city limits; THEREFORE, BE IT RESOLVED, by the Mayor and City Council of the City of Milton, GA while in regular session on the 20th day of January 2010 at 6:00 p.m. that staff is hereby authorized to pursue funding under this program based on the attached list of projects identified as "Attachment A". SO RESOLVED, ON THIS 20TH DAY OF JANUARY, 2010. Attest: r Sudie Gordon, Interim C ty Clerk (Seal) �l Joe Lockwood, Mayor ATTACHMENT A Total Projects $1,650,000 MARTA Offset Funds $625,000 MARTA Offset Funds shall not exceed the amount allocated to City of Milton PE - Preliminary Engineering CST - Construction Project Title Phase Funds Comments Filling in gaps within 1/2 mi of routes on Project ID PE $100,000 Cogburn Rd, Webb Rd, Deerfield Pkwy, MLT Sidewalks connecting to Routes 143 and 185 CST $550,000 Morris Rd, Bethany Rd -01 ADA Upgrades on PE $10,000 Countdown ped signals, audible signals, push buttons, ramps, refuge islands, ADA CST $90,000 MLT -02 connections to and along Routes 143 and 185 upgrades within 1/2 mi of routes MARTA funds for within 1/2 mi of Route 143 approx limits Webb Rd to Avensong Deerfield Pkwy Street Way ($140,000), remainder from Lighting (Routes 143 and Avensong Way to SR 9 using other MLT -03 185) Gateway signage and CST $200,000 funding source ($60,000) streetscape along or connecting to Routes 143 and Gateway signage and streetscape along or MLT -04 185 Bus Shelters on Routes 143 CST $100,000 within 1/2 mi of routes MLT -05 and 185 or CST $100,000 $15,000430,000 each Land acquisition for parks within 1/2 mile MLT -06 Acquisition for parks along near Routes 143 and 185 Pavement repair and CST $250,000 of Routes 143 and 185 Pavement improvements (repair, resurfacing on Routes 143 resurfacing) on bus routes 143 and 185 MLT -07 and 185 CST $250,000 Total Projects $1,650,000 MARTA Offset Funds $625,000 MARTA Offset Funds shall not exceed the amount allocated to City of Milton PE - Preliminary Engineering CST - Construction