HomeMy WebLinkAboutMinutes - DRB - 08-06-2013
ACTION REPORT
DESIGN REVIEW BOARD
AUGUST 6, 2013
WORK SESSION 5:30/PUBLIC HEARING 6:00pm
COUNCIL CHAMBERS
1) Call to order and Pledge
2) Introduction of Board Members
Members present: Perry Mason, Marty Littleton, Tim Bryan, Laura Wysong, Steve
Check
3) Approval of July action minutes
Motion to approve: Tim Bryan
2nd: Laura Wysong
Vote: 4-0, Motion passed
4) Demolition reviews
14295&14305 Providence Road, Barry Segars
Motion to approve: Marty Littleton
2nd: Laura Wysong
Vote: 4-0, Motion passed
14720 Taylor Road, Austin Lineberry
Motion to approve: Steve Check
2nd: Tim Bryan
Vote: 4-0, Motion passed
15630&15620 Birmingham Highway, Jeff Reddick
Motion to approve: Marty Littleton
2nd: Steve Check
Vote: 5-0*, Motion passed *Late arriving member
1660 Birmingham Road, Jeff Cook
Motion to defer until next month: Marty Littleon
2nd: Perry Mason
Vote: 5 -0, Motion passed
5) Final reviews
Townhomes, Braeburn, Michelle Horstemeyer
Motion to approve with condition(s): Marty Littleton
Conditions:
Subject to the location of the relocated road
Should the road change or impede the submitted townhomes in any way, or creates
a change in what will be built, the applicant will come back before the DRB
2nd: Laura Wysong
Vote: 5 -0, Motion passed
Townhomes, Hidden Forrest, Javad Oskoei
Motion to approve with conditions(s): Steve Check
Conditions:
Approval per rendering dated 8/6/2013
2nd: Marty Littleton
Vote: 5-0, Motion passed
6) Courtesy reviews
a. V13-005, 244 Legends Trail, The Highlands, Sharp Residential, Farrell Middleton
Request: To reduce the front setback from 60’ to 40’
Comments:
Add porch with minimum depth of 8’
b. V13-007, 5140 Windward Parkway, Navy Federal Credit Union, Brian Murphy
Request(s): To allow an internally illuminated ground sign
To allow 4 additional wall signs
To allow 4 additional non monument ground signs
Comments:
Maintenance of sign is an issue.
The whole sign should be improved.
Looks top heave. Cover those columns with stone instead of brick. (Staff notes
that sign materials should match building. Building is brick.)
Consider making the sign externally illuminated. Landscaping could hide
floodlights.
c. V13-008, 13800 Highway 9 North, Bethany Village, Becky Coppels
Request: To allow a 66 square foot ground sign
Comments:
Supports external illumination of ground sign.
LED signs over drive through opens us up to more requests.
Ok with LED signs that only say open/close/atm.
The illumination of signs should be per the ordinance.
New signage should be softer but visible.
Traffic and avoiding accidents support the third wall sign.
d. V13-009, 14225 Birmingham Highway, Adnan Shaikh
Request(s):
To reduce the front setback from 60’ to 40’
To allow a house and courtyard to encroach into the 75 foot impervious setback
and the 50 foot city stream buffer
To allow a pool to encroach into the 75 foot impervious setback and the 50 foot
city stream buffer
To allow a storage building to encroach into the 70 foot impervious setback and
the 50 foot city stream buffer
Comments:
Hydrology study needs to be done.
Provide a landscape plan for mediation.
House will have to be elevated if in the flood zone.
A floodplain study needs to be done.
House will be 41’ from street. This is too close to Birmingham Highway.
If 40’ front setback is approved, consider a house with more historic architecture.
More of a farmhouse look; clapboard vs brick. Adding a porch would help;
instead of just a vertical wall. As would true divided lights.
Applicant asked about buffer averaging. Staff notes that this is not an alternative
to a buffer variance or mitigation, but he could always volunteer to provide extra
buffer.
If this is approved, what wouldn’t be approved?
Is there a future ROW reduction? This should be considered with the front
setback reduction.
e. Istanbul Community Center, 591 North Main Street, Paul Girarduea, building/site
additions
Comments:
Roofing should match existing structure.
Add more of a pitch to the roof.
Bring real architectural drawings.
We want to see hos this is going to be used and hos this will work together.
It is ok to separate awnings from the building; like a large cabana or gazebo.
Pillars should be more appropriately sized.
Add ADA connecting sidewalks.
7) Other business
8) Adjournment