Loading...
HomeMy WebLinkAboutMinutes - DRB - 10-04-2011 Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004 ACTION REPORT DESIGN REVIEW BOARD OCTOBERR 4, 2011 PUBLIC HEARING 6:00pm COUNCIL CHAMBERS 1) Call to order and Pledge 2) Introduction of Board Members Members present: Mark Mekes, Kathi Cook, Tim Bryan, Bruce Smitherman, Karl Haase 3) Approval of September action minutes Motion to approve: Mark Mekes 2nd: Bruce Smitherman Vote: 5-0, Motion approved 4) Final reviews Tide Dry Cleaners, Building, 12994 Highway 9, Alex Munoz Tide Dry Cleaners, Site, 12994 Highway 9 , Loyick Evans Motion to approve with conditions: Mark Mekes Conditions: Increase stacked stone water table, 360 degrees around, by one foot, to four feet, eight inches 2nd: Bruce Smitherman Vote: 5-0, Motion approved 5) Courtesy reviews U11-02/VC11-04, Inner Quest Church expansion, 12830 New Providence Road, Lisa Peacck Request(s): To expand the existing 3,700 sq ft church to add a new building consisting of a 7,776 sq ft sanctuary, for a total of 11,576 sq ft within 2 buildings; a total of 224 seats. With a 4 part concurrent variance: o To reduce the 75 foot undisturbed buffer and 10 foot improvement setback along the west property line where the existing parking lot encroached to a 25 foot undisturbed buffer, and 10 foot improvement setback o To reduce the 75 foot undisturbed buffer and 10 foot improvement setback along the north property line where the existing and proposed parking encroach to a 25 foot undisturbed buffer and 10 foot improvement setback o To allow a 6 over 8 roof pitch o To increase the front setback from 30 feet from the landscape strip to 250 feet Comments: o New building should be similiar in style to the existing farm building/house as possible and incorporate materials. o Difference between the required 8/12 roof pitch, and the requested 5/12 pitch is about 7 vertical feet. Prefer higher pitch. Lower roof looks more industrial. o Consider dormers, or some treatment to break up mass of roof. o Consider wider vertical bands of hardiplank. Consider top of building vertical; bottom horizontal. Consider a 5” wide siding which is reflective of older buildings. o Since the north side of the property is adjacent to residential, provide adequate landscaping to create buffer. o Likes the idea of gravel parking lot/minimizing asphalt. o Take into consideration the look of buildings across the street. o Although the building is not prominent on the property now, it could be in the future as the church expands. V11-014 2825 Mountain Road, James Sutton Request(s): To allow a house and garage addition to encroach into the front yard setback (Article/Section 64-1094.D) Comment(s): o All materials should match existing building, as well as roof, window style, etc. V11-015 1005 Krobot Way, Milton Preserve, Chris Sears Request(s): To allow two, 16 square feet signs at the entrance of a subdivision zoned TR (Article/Section 64-2303) Comment(s): o No issues. o Meet all landscaping requirements. V11-016, 13940 Atlanta National Drive, Aliaune Thiam Request(s): a. To allow a fence/wall in the Northwest Overlay to be opaque (stucco) and wrought iron with stucco columns, adjacent to a public street. b. To allow a fence/wall in the Northwest Overlay to exceed 55” in height, adjacent to a public street. c. To allow chain link fencing that is visible from public view. (Article 64-1142 7a,b, 8) Comment(s): o A privacy fence standard needs to be developed for the overlay because one does not currently exist. o The white color of the stucco wall would be too bright; prefer a more neutral color. o Break up wall with groupings of mixed hardwoods and evergreens, spaced a minimum of 20’ or as recommended by the Arborist. Heights of plantings should vary. Planting plan to be approved by city Arborist. o Set wall back far enough from road to allow plantings. o Why replace the chain link with solid wrought iron? Would prefer wrought iron with columns. V11-017, 13700 Highway 9 North, Penn Hodge Request(s): To reduce the number of required parking spaces from 62 to 50 Comment(s): o The street trees removed previously should be replaced prior to issuance of the Certificate of Occupancy. 6) Adjournment