Loading...
HomeMy WebLinkAboutMinutes - DRB - 09-06-2011 Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004 ACTION RPORT DESIGN REVIEW BOARD SEPTEMBER 6, 2011 WORK SESSION 5:30 PM PUBLIC HEARING 6:00pm COUNCIL CHAMBERS 1) Call to order and Pledge 2) Introduction of Board Members Members present: Mark Mekes, Kathi Cook, Bruce Smitherman, Tim Bryan 3) Approval of August action minutes Motion to approve: Mark Mekes 2nd: Bruce Smitherman Vote: 4-0, Motion approved 4) Bethany Gas Station, Construction trailer, 3105 Bethany Road, Mehdi Khah Motion to approve with conditions: Mark Mekes Add lattice around bottom of trailer Add awning over front door 2nd: Bruce Smitherman Vote: 4-0, Motion approved 5) Bethany Gas Station, Canopy, Courtesy review, 3105 Bethany Road, Mehdi Khah Mansard roof ok. Roof of canopy should be neutral in color; materials should match those of building. Either both metal, or both asphalt shingles. No color striping around edge of canopy. Columns should be brick. Return to DRB with final drawings, and colored elevations. If roof materials on building change, this must be approved by DRB, also. 6) Vickery Crest, Pool house, 12895 Donegal Lane, Brad Evatt Motion to approve: Mark Mekes 2nd: Bruce Smitherman Vote: 4-0, Motion approved 7) Adjournment