HomeMy WebLinkAboutMinutes - DRB - 01-06-2009City of Milton
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004
ACTION REPORT
DESIGN REVIEW BOARD
JANUARY 6, 2009
6:00 PM
1. Call to order
2. Introduction of Board members
3. Approval of December meeting minutes Approved 6-0*
4. Bethany Bend Village
13680 Highway 9
John McMillan
Picnic and mail pavilion
Approved 5-0**
o Use shingles instead of
standing seam metal roof for
picnic pavilion.
5. Other business
6. ZM08-06/VC08-06
765 Mid-Broadwell Road
Sally Rich-Kolb
Addition to the agenda
Courtesy review
o The required road should
remain to support the
existing/proposed network.
o Some parking spaces are
hard to maneuver—should be
reconfigured.
o Corner building may be too
big.
o Possibly change two story
retail to retail/office. This will
be a more successful
combination.
o Reduction of the total square
footage of the development
will better support a reduction
in parking.
o Right of way dedication
warrants reduction in parking.
o Respect critical root zone of
offsite trees.
o The plan seems to respect the
existing topography.
7. Adjournment
*Michael Stevens was absent from the meeting.
**Vic Jones recused himself from this petition.