Loading...
HomeMy WebLinkAboutMinutes - DRB - 11-03-2009 Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004 ACTION REPORT DESIGN REVIEW BOARD NOVEMBER 3, 2009 6:00PM 1) Call to order 2) Introduction of Board Members  Members present—Darryl Jan Porter, Vince Pisano, Terry Herr, Jim Brown 3) Approval of August, September action minutes—Deferred until December meeting 4) Building permit review, Bruce & Mindy Harris, Milton Outdoor Power, 860 Mayfield Rd  Comments:  Canopy should be constructed to look more like a porch; should create more of a presence in Crabapple.  Currently, proposed canopy is straight with exposed gable ends. Ends of canopy should resolve in some fashion.  Board wants more detail on columns; they should be more substantial, not just pipe. Columns/beams should be expressed and of reasonable size  No bright greens for canopy color; colors should be more muted, or natural galvanized metal; should match Crabapple overlay requirements.  Add detail to cornice on top of saloon front; add larger profile trim piece; add braces to columns—these details will add architectural richness for minimal cost.  Per Overlay—doors to be paneled, not flush.  The open carport is troubling. Should be screened in some way— closed off, vegetation, garage door, barn doors.  Motion to Defer until December meeting, Vince Pisano  2nd, Darryl Jan Porter  Motion approved, 4-0 5) Other business, none 6) Adjournment