HomeMy WebLinkAboutMinutes - DRB - 11-03-2009
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004
ACTION REPORT
DESIGN REVIEW BOARD
NOVEMBER 3, 2009
6:00PM
1) Call to order
2) Introduction of Board Members
Members present—Darryl Jan Porter, Vince Pisano, Terry Herr, Jim Brown
3) Approval of August, September action minutes—Deferred until December
meeting
4) Building permit review, Bruce & Mindy Harris, Milton Outdoor Power, 860
Mayfield Rd
Comments:
Canopy should be constructed to look more like a porch; should
create more of a presence in Crabapple.
Currently, proposed canopy is straight with exposed gable ends. Ends
of canopy should resolve in some fashion.
Board wants more detail on columns; they should be more substantial,
not just pipe. Columns/beams should be expressed and of reasonable
size
No bright greens for canopy color; colors should be more muted, or
natural galvanized metal; should match Crabapple overlay
requirements.
Add detail to cornice on top of saloon front; add larger profile trim
piece; add braces to columns—these details will add architectural
richness for minimal cost.
Per Overlay—doors to be paneled, not flush.
The open carport is troubling. Should be screened in some way—
closed off, vegetation, garage door, barn doors.
Motion to Defer until December meeting, Vince Pisano
2nd, Darryl Jan Porter
Motion approved, 4-0
5) Other business, none
6) Adjournment