HomeMy WebLinkAboutMinutes - DRB - 01-08-2008City of Milton
Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004
MEMORANDUM
To: Design Review Board
From: Angela Cutler Rambeau, Planner, Community Development
Date: January 10, 2008
Re: Action Report for January 8, Design Review Board Meeting
1. Election of temporary Chairman Approved, 5-0
Kathi Cook
2. Approval of December meeting
minutes
Approved, 5-0
3. Demo permit, 110 Christopher Run
David Garmon
Approved, 5-0
4. Deerfield Place
Highway 9 & Webb Road
Sembler Atlanta, Brian Snelling
Approved with conditions:
Sidewalk to be constructed
per drawing dated 12/18/07,
4-0
5. Navy Federal Credit Union
Highway 9
URS
Approved with conditions:
Building to be constructed per
drawings dated 11/16/2007,
No roof mechanical units are
to be visible from public ROW,
5-0
6. Birmingham Elementary School
Birmingham Hwy & Wood Road
Collins, Cooper, Carusi
Deferred until next meeting, 5-0
Suggestions:
Increase buffer to 75’, add
screening where sparsely
vegetated
Comply with Northwest
Overlay requirements, i.e., no
parking in front of building,
building orientation, fencing,
and allowed materials.
Break building down into
smaller units, smaller scale
Make sure that there is no
spillover from any lighting on
the recreation fields
Entry design is too
contemporary, out of place
for the area
The bus drop off in front of the
building does not present itself
very well to the community;
possibly add additional
landscaping to help screen
the area
The natural detention is a plus
Design a building that is more
in harmony with the
surrounding community
7. Khol’s
Highway 9 & Webb Road
WD Partners
Approved with conditions:
Replace dark EFIS (Section 10)
with brick in the same color on
rear elevation
Wrap the cornice on the front
elevation around to the left
elevation,
4-0
8. Courtesy review, Windward Tract
New retail center
Windward Parkway
Real Development
Suggestions:
None
9. Courtesy review, White Columns
guard house
Freemanville Road
McWhorter & Associates
Suggestions:
Try to make guard parking
space less visible from road
10. RZ07-022/VC07-016
Bethany Bend Road
Bajun American Properties, LP
Suggestions:
Density appears to be too high
for this parcel, too much on
site
Break up linear lines of units
Add off-sets to units
Re-arrange units so that they
front Bethany Bend; view
should be something other
than a wooden fence and
decks
Remove structures from
floodplain
Increase green space
11. U07-011/VC07-017
13620 Hopewell Road
Monticello Real Estate Invest,
LLC
Increase buffer between
septic field and adjacent
property
Comply with Northwest
Overlay requirements
No review by Board of
hardships, only site plan.
12. Demo permit, 13140 Arnold Mill Rd
H&H Demolition
Deferred until next meeting,
5-0.
Note: This application has been
administratively withdrawn