Loading...
HomeMy WebLinkAboutMinutes - DRB - 05-06-2008City of Milton Deerfield Professional Centre 13000 Deerfield Parkway Building 100, Suite 107 E Milton, GA 30004 AGENDA DESIGN REVIEW BOARD MAY 6, 2008 6:00 PM 1. Approval of April meeting minutes Approved, 6-0 2. Demo permit 16348 Freemanville Rd. Bob McCaughtry, Jr. Approved, 6-0 3. Demo permit 15775 Thompson Rd. Bob McCaughtry, Jr. Approved, 6-0 4. Demo permit 5304 Windward Parkway Fallcreek Approved, 6-0 5. Pritchard Mountain Water Tank 16300 Freemanville Road Ray Wooten Approved with conditions: 1. Eliminate the temporary construction staging area, as shown on page C-4. 2. Construction is limited to existing clearing. 3. Paint color to be approved by Director of Community Development. 6-0 6. North Valley Plaza Highway 9 James Kang, Arcon Construction Courtesy review suggestions  Showing too many types of stone.  S3—too gray  Awnings—peach color will not weather well. Consider a darker, richer color; possibly black or green.  Possibly pick another color for the brick behind the awnings so that the do not blend in.  Break up windows across back. Change out some of the arches, add horizontal lines to match front. Possibly add arches to front.  The two elevations look like different buildings  Show parapets on side views.  Show thickness of pop-ups.  Bring actual building samples for final review. 7. Windward Village Highway 9 & Windward Parkway Easlan Capital  Turn the corner of the 1st bay and terminate/wrap parapets into bay.  Don’t put striped brick on top of stucco. Brick needs to support something. Either brick the entire area with variations in the brick pattern or shift upper brick band to top of base band to make one thick brick base. Possibly vary height.  Meter centers should be screened by something—i.e. brick wall or lattice with landscape.  Coordinate elevation with roof; last 3 bays on elevation don’t match roof plan.  No mirror glass.  Show roof access ladders on elevation. Move to interior.  Vary brick/door/awning colors so that you don’t have one big blob of dark space.  Show paint colors for metal and rear doors. 8. Bike/ped trail system City of Milton, Public Works  Use City of Milton horse as part of signage.  Concrete is too sterile; limit use.  Use stamped pavers w/concrete at major intersections.  Use gravel pave system where possible.  Possible stamp logo directly into pavement.  Surface should be organic in color, natural  Use decorative fence at intersections/corners; Center post with boards falling to ground, for example.  Signage should be simulated wood; should meet Overlay requirements.  Keep natural landscape along trail; preserve large trees. 9. LDS Church 2965 Manor Bridge Dr. Church of Jesus Christ of Latter-Day Saints, James Revill  The Board supports reducing the 40’ setback back to 20’, which will allow the applicant to move the septic tank back, and possibly save 3 specimen trees (if healthy).  Remove dumpster from Bethany Bend frontage.  Possibly flip Scout Building with dumpster.  Materials of dumpster, pavilion and modular wall shall match building. 10. Changes to Board  Kathi Cook resigns as Board Chair due to schedule conflicts. Will remain on the Board.  Terry Herr is elected Board Chair.  Kathy Cook is elected Board Vice-Chair. 11. Adjournment