Agenda item Notes
DEMO
Christian Morton
Approved with conditions:
Protect any specimen trees.
TEMPORARY BUILDINGS
Duluth United Methodist Church
Walter Dean
Deferred until December; requesting more
information:
Repairs to building
Paint colors
Length of use
Landscaping
KHOLS
Brian Snelling
Recommendations:
Replace chain link fence next to dock well
On left elevation: scale of element in
middle should come down/become
smaller, lower feature to band height .
Needs to be humanized.
Add more brick vs. EFIS
Details of building should better match
adjacent buildings
Khols should have a better presentation to
Hwy 9; there is no connection between
corner and other buildings. Landscaping
on that side should be more free form.
Add more brick and other architectural
elements; brick water table, brick box outs
Add planted arbors to break up large
expanse of stucco
Make sure the back of the fake parapets
are finished if visible.
Put sidewalk as close to building as
possible.
Add a plaza area.
Add period lighting, columns, lighting,
etc.
CENTENAL VILLAGE/HABITAT FOR
HUMANITY
Tim McMillan
Recommendations:
Paint back of each unit a different color.
Add awning or shed roof over some of the
doors.
Offset back of units
Alternate garage doors
Vary colors a little more
Paint doors to match shutters
Add brick to some of the backs
Add more landscaping to back
NAVY FEDERAL CREDIT UNION
Chris Hill
Recommendations:
Roof stops too abruptly
Carry roof line all the way to the back,
add another gable end.
Canopies over back doors
Repeat the from brick columns along Hwy
9 elevation
Windows should be divided/sash
No mirrored glass
Roof color—see Table 12.G.1
Break up continuous parking; add bulb
outs
RZ07-011 Applicant was not in attendance—No review.
RZ07-018/U07-009/VC07-010
Applicant was not in attendance—No review.
RZ07-019/VC07-011
Recommendations:
Seems to be too much on this site
Try to make more of a wooded campus
Include pervious pathways
Save as many hardwoods as possible
Parking should be more freeform; work
around trees; no curb
This would be a good opportunity to blend
two types of though: a organic site with a
high tech building
Consider not building a square building
U07-006/VC07-013
Recommendations:
Board requests that the applicant meet
with the City Arborist/Staff to determine
screening needs
Possibly plant screening on boulders
surrounding area
U07-007/VC07-012
Applicant was not in attendance—No review.